Professional Documents
Culture Documents
Area Requirements PDF
Area Requirements PDF
Agricultural Hub
i Training Kiosk
ii A V Room
2 Gastronomic Zone
I Restaurant
iii Storage
3 Social Hall
i Convention Space
ii Central Park
4 Administration
ii Conference Room
iv Workers Rooms
1 Research Labs
1
2 Researcher’s Offices
3 Smart Village
4 Library
5 Greenhouse
6 Cafeteria
7 Supporting Offices
Vertical Farming
1 Farming Units
2 Cold storage
3 Aquaponic Farm
4 Sky Farm
5 Packaging
6 Workers Area
Market
1 Retail Shop
2 Wholesale Shop
3 Market
4 Vendor Parking
2
5 Admin / Helpdesk / Waiting Area
Storage
3
BLUMIN ARCHITECTS AND INTERIOR DESIGN
S.NO Description of Work Properties Length Height Area in sq/ft Cost /sq.ftWith Labour)
A FOYER
6 Lighting
7
C DINING
1 Dining Table & Breakfast Counter 19 MM BWP Plywood with 1.2 mm laminate as per Design 48 1200
2 Chairs 5 4500
Inclusive of Counter,Mirror,Framing,Covelighting,Wash
7 Wash Basin Counter 35.00 1800.00
Basin with Faucet and Recessed Lights
E UTILITY
1
1 Utility Bottom and Top Unit 70.00 1650
2 Wall Dadoing 28.00 450
G BEDROOM 2
19MM Commercial Ply finish with 1.2mm Hi Gloss Laminate
1 Tv unit Wall 30.00 850.00
matching edge binding
2
CARCASS- 19MM Commercial Ply finish with 1.2mm Frosty
White Laminate 12MM Commercial Ply Backing finish with
1.2mm Frosty White LaminateSHUTTER- Front/Side - 19MM
Commercial Ply finish with 1.2mm Hi Gloss Laminate
10 Walk- in Wardrobe Unit matching edge binding DRAWER - 19MM Commercial Ply 205.00 1450.00
finish with Inside 1.2mm Frosty White Laminate and
outside Hi Gloss Laminate HARDWARE -Shutter-Hinges soft
closing-HAFELE Handles-Handle to be as per Architect
Selection(Basic Price-1000/PC)
I BEDROOM 4
HeadRest Wooden Panels with 19MM Commercial Ply FRAME with 12mm PLY front Panel
6 24 850.00
Upholstery with 1.2mm Frosty White Laminate/4mm veneer
3
J FAMILY ROOM
2 Potrait 1 6000.00
3 Sofa As per Client Selection
4 Centre Table
5 False Ceiling 200 60.00
6 Lighting
6 Doors Flush doors with ss inlays with Hardware 4 25000.00
7 Bedroom Sliding Door
8 Toilet & utility Doors 5 12000.00
9 Toilet Vanity Counter 4 30000.00
TOTAL
FORTY SIX LAKH FIFTY TWENTY EIGHT THOUSAND EIGHT HUNDRED AND TEN ONLY
75% 20% 5%
PAYMENT DETAILS
INITIAL MID FINAL
4
5
Total Cost
48620.00
16000.00
10500.00
57600.00
22500
14000
10500.00
48600.00
12540.00
8000.00
63000.00
35000.00
157250.00
111000.00
61050.00
45900.00
15000.00
16000.00
40000.00
6
115500.00
12600.00
94250.00
60000.00
136950.00
11250.00
76500.00
60000.00
7200.00
14000.00
12000.00
9000.00
25200.00
15000
9600.00
25500.00
99000.00
11250.00
76500.00
60000.00
30000.00
12000.00
6000.00
7
297250.00
18000.00
16000.00
90000.00
96000.00
330000.00
22500.00
76500.00
60000.00
14400.00
18000.00
12000.00
21000.00
16000.00
346500.00
12000.00
76500.00
20400.00
14400.00
6000.00
8000.00
16800.00
16000.00
8
138600.00
6000.00
36000.00
12000.00
35000.00
100000.00
22000.00
60000.00
120000.00
350000.00
75000
4406210.00
N ONLY
0095
5%
FINAL
9
10
1