You are on page 1of 1

A0 A B C D E F G H I J K L M N O P Q R S T U

General Notes
1. This drawing should be printed in colour and
read in conjunction with all associated design

27/07/2018
15:46:57
documentation forming the AMS15 Stage 4B
design package. This includes the Digital Realty
Design Engineering Guides (DEGs) and DEG
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S 18 deviation lists.
2. This is not an installation drawing. All plant and
5745 5745 5745 5745 5690 5690 5690 5690 5690 5690 5690 5690 5735 5735 5735 5735 585585 equipment is to be installed to manufacturer’s
recommendations, allowing full access for
commissioning, maintenance and
removal/replacement.
A 3. All AMS15 services have been co-ordinated
against the Mercury As-built Revit model
received 17/05/18. Services from the previous
phases are halftoned for reference. Prior to
commencing works the Contractor shall confirm
1No MUW pipe runs at high the accuracy of the as-built model and confirm
level within store room, drops that all interface points will be as shown on Arup
5840
to low level and exits building drawings.
4. All dimensions are in millimetres (mm) unless
to connect to capped
noted otherwise.
connection at ground level to 5. Do not scale from this drawing.
2
supply S130/S140 UG tanks 6. All services are to be fire stopped at entry or exit
from risers and fire compartments.

Mechanical Services

1. All existing equipment references from Phase 1 fitout


B have remained unchanged on this drawing.
All equipment detailed on Phase 2 and Phase 3
layouts and schematics are in line with the new
Global Standard References.

3
6410

100ø - MUW S130/S140


UG tank supply

C
2890

D
Pipe continues to 100ø - MUW UG tank
supply S150/S160 supply
3280

UG tanks

2500x1080 SA Gen
5
Da
2274

2500x1080 SA Gen
E

Return air ductwork connects to ceiling


5554

void
2500x1080 RA Gen
6 2500x1080 RA Gen

Refer to S150 / S160 drawing set


F
for details of scope within this area
1193

Fa
1699

7
Fb 2500x1080 SA Gen
2662

2500x1080 RA Gen

300x300 RA Gen IL:4266


G

'AMS15-ARP-P2-00-DR-M-03002'
500x400 SA Gen IL:5367

For continuation refer to sheet


4660

8
2500x1080 RA Gen

2500x1080 SA Gen

9
6449

2500x1080 SA Gen

2500x1080 RA Gen

J
49 Provide insulation on each supply and
return duct to prevent cold bridging
10
5553

2500x1080 SA Gen
2500x1080 RA Gen
P04 27/07/18 PW DE CT
Stage 4B - For Client Approval
P03 06/07/18 PW DE CT
Stage 4B - For Client Approval
K P02 04/06/18 PW DE CT
11 Stage 3 - For Client Approval and costing
2111

P01 01/06/18 PW DE CT

Ka Refer to S150 / S160 drawing set 2500x1080 RA Gen


Stage 3 - For Client Approval and costing
By Chkd Appd
1336

Rev Date
2500x1080 RA Gen

40
50
for details of scope within this area
2107

12 L
Arup bv
2500x1080 SA Gen Naritaweg 118, 1043 CA
2662

Amsterdam, Netherlands

Client

La 2500x1080 SA Gen Mercury Engineering


2892

Project Title
13
M Digital Realty
AMS15
S130-S160
5115

Key Plan

2500x1080 SA Gen
2500x1080 RA Gen

14
N
Area 1
5993

2500x1080 SA Gen 2500x1080 RA Gen

Drawing Title
15 Mechanical Services Layout
Ground Floor
P Area 1
S130/40 Fit-Out
2350

Scale at A0
1 : 100
Role
Pb Mechanical Services
295

Pa Suitability
S4 - For Client Approval
Arup Job No Rev
16
261279 P04
Name

AMS15-ARP-P2-00-DR-M-03001

Do not scale © Arup

You might also like