BATANG - CENTRAL JAVA Project No : 177214

2 x 1000 MW Rev No : .02


COAL FIRE POWER PLANT Date :

INSPECTION AND INDIVIDUAL


TEST REPORT
500kV BUSBAR A PROTECTION PANEL
12ASR00GH006

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006


BATANG - CENTRAL JAVA Project No : 177214
2 x 1000 MW Rev No : .02
COAL FIRE POWER PLANT Date :

TABLE OF CONTENTS 01
1. GENERAL INFORMATION
PAGE No.

1.0 NAME PLATE DATA PANEL 01


1.1 GENERAL INSPECTION 01
1.2 TOOL REQUIRED FOR TEST 01

2. BUSBAR-A PROTECTION RELAY 1

2.0 NAME PLATE DATA RELAY 02


2.1 VOLTAGE AND CURRENT MEASUREMENT 02
2.2 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 03
2.3 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 04
2.4 LED ASSIGNMENT 05
2.5 BINARY / CONTACT INPUT AND OUTPUT 06
2.6 STABILITY TEST BUSBAR PROTECTION RELAY 07
2.7 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 08
2.8 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 09
2.9 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 10
2.10 PROTECTION RELAY SETTING BUSBAR (-F87B) 11
2.11 SENSITIVITY TEST DIFFERENTIAL (-F87B) 11
2.12 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1) 12
2.13 OPERATING CHARACTERISTIC TEST 1PHASE_(L1) 12
2.14 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L2) 13
2.15 OPERATING CHARACTERISTIC TEST 1PHASE_(L2) 13
2.16 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L3) 14
2.17 OPERATING CHARACTERISTIC TEST 1PHASE_(L3) 14
2.18 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1-L2) 15
2.19 OPERATING CHARACTERISTIC TEST 1PHASE_(L1-L2) 15
2.20 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L2-L3) 16
2.21 OPERATING CHARACTERISTIC TEST 1PHASE_(L2-L3) 16
2.22 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L3-L1) 17
2.23 OPERATING CHARACTERISTIC TEST 1PHASE_(L3-L1) 17
2.24 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1-L2-L3) 18
2.25 OPERATING CHARACTERISTIC TEST 1PHASE_(L1-L2-L3) 18

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006


BATANG - CENTRAL JAVA Project No : 177214
2 x 1000 MW Rev No : .02
COAL FIRE POWER PLANT Date :

TABLE OF CONTENTS 02
PAGE No.

3. BUSBAR-A PROTECTION RELAY 2

3.0 NAME PLATE DATA RELAY 19


3.1 VOLTAGE AND CURRENT MEASUREMENT 19
3.2 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 20
3.3 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 21
3.4 LED ASSIGNMENT 22
3.5 BINARY / CONTACT INPUT AND OUTPUT 23
3.6 STABILITY TEST BUSBAR PROTECTION RELAY 24
3.7 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 25
3.8 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 26
3.9 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915) 27
3.10 PROTECTION RELAY SETTING BUSBAR (-F87B) 28
3.11 SENSITIVITY TEST DIFFERENTIAL (-F87B) 28
3.12 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1) 29
3.13 OPERATING CHARACTERISTIC TEST 1PHASE_(L1) 29
3.14 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L2) 30
3.15 OPERATING CHARACTERISTIC TEST 1PHASE_(L2) 30
3.16 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L3) 31
3.17 OPERATING CHARACTERISTIC TEST 1PHASE_(L3) 31
3.18 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1-L2) 32
3.19 OPERATING CHARACTERISTIC TEST 1PHASE_(L1-L2) 32
3.20 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L2-L3) 33
3.21 OPERATING CHARACTERISTIC TEST 1PHASE_(L2-L3) 33
3.22 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L3-L1) 34
3.23 OPERATING CHARACTERISTIC TEST 1PHASE_(L3-L1) 34
3.24 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1-L2-L3) 35
3.25 OPERATING CHARACTERISTIC TEST 1PHASE_(L1-L2-L3) 35

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :
Project CENTRAL JAVA 2 X 1000MW COAL FIRE POWER PLANT
Subcontractor PT. BLACK & VEATCH ITR No.
Location 500kV Switchyard Control Building NARI Dwg No. GW1400150.18
Inspected item Relay Control & Protection Panel Project Dwg No. B-ABA-E-BVI-8018_REV.J

FUNCTION : 500kV BUSBAR A PROTECTION PANEL


KKS NUMBER : 12ASR00GH006

1. GENERAL INFORMATION

1.0 NAME PLATE DATA PANEL

Manufacturer : NARI ELECTRIC Ethernet Switch : HIRSCHMANN MAR1130


Cubicle/Panel Type : NR-G03 Busbar Diff. Relay : NARI PCS-915
Protection Degree : IP 54 :
Painting (Powder Coating ) : RAL 7032 Test Block : 192RG-330AE; JM
Manufacturer year : 2017 Lockout Relay : MD1501-571-BAA
FO Jumper : ST-ST.MM.PC3M

1.1 GENERAL INSPECTION


Condition Remarks
Visual inspection, compliance with drawings and related doc. OK
Check for loose connections, broken stud and burned insulation OK
Cables and wires marking OK
Grounding system OK

1.2 TOOL REQUIRED FOR TEST

Test Equipment Serial Number Calibrated date


Secondary Injection Omicron CMC 256-6 JA048S 14-Jul-2018
Digital Multimeter Fluke 87V 26470199 -
Primary Injection Omicron CPC100 AG164A 24-Sep-2018

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 1


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2. BUSBAR A PROTECTION RELAY-1

2.0 NAME PLATE DATA RELAY


Manufacturer : NARI ELECTRIC Tracking No : GW1400150PG018/20
Model No. : PCS-915IC-A-EN-170789 IP Address : 198.120.0.54
Serial Number : NRJB21302017B0030 IED Tag No. : -F87BA1

Current Input : 3 Binary / Contact Input : 11


Voltage Input : N/A Binary / Contact Output : 11

2.1 VOLTAGE AND CURRENT MEASUREMENT

Phase (R,S,T) CT Setting ## ##


Ip = 4.000 A Is = 1 A

RELAY READING % RELAY READING %


INJECTED CURRENT RESULTS INJECTED CURRENT RESULTS
Expect. Actual ERROR Expect. Actual ERROR

R 0,50 2000 1982,74 -0,86% Passed R 0,50 2000 1982,74 -0,86% Passed
S 0,50 2000 1992,60 -0,37% Passed S 0,50 2000 1992,60 -0,37% Passed
50% 50%
T 0,50 2000 1982,74 -0,86% Passed T 0,50 2000 1992,60 -0,37% Passed

R 0,75 3000 2983,97 -0,53% Passed R 0,75 3000 2979,04 -0,70% Passed
S 0,75 3000 2983,97 -0,53% Passed S 0,75 3000 2983,97 -0,53% Passed
75% 75%
T 0,75 3000 2979,04 -0,70% Passed T 0,75 3000 2983,97 -0,53% Passed

R 1,00 4000 3970,41 -0,74% Passed R 1,00 4000 3975,34 -0,62% Passed
S 1,00 4000 3970,41 -0,74% Passed S 1,00 4000 3985,20 -0,37% Passed
100% 100%
T 1,00 4000 3975,34 -0,62% Passed T 1,00 4000 3970,41 -0,74% Passed

R 1,10 4400 4369,91 -0,68% Passed R 1,10 4400 4379,78 -0,46% Passed
S 1,10 4400 4379,78 -0,46% Passed S 1,10 4400 4379,78 -0,46% Passed
110% 110%
T 1,10 4400 4369,91 -0,68% Passed T 1,10 4400 4369,91 -0,68% Passed

**Measurement tolerance : ≤ 2,00% **Measurement tolerance : ≤ 2,00%

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 2


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.2 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Current Measurement Diameter 1&2 50%

Current Measurement Diameter 1&2 75%

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 3


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.3 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Current Measurement Diameter 1&2 100%

Current Measurement Diameter 1&2 110%

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 4


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.4 LED ASSIGNMENT

LED No DESCRIPTION
1.1 HEALTHY
1.2 ALARM
1.3 CTS/VTS ALARM
1.4 DS ALARM
1.5 87 OP
1.6 DIAMETER1 TRIP
1.7 DIAMETER2 TRIP
1.8 Spare
1.9 Spare
1.10 Spare
1.11 PH.R_OP
1.12 PH.S_OP
1.13 PH.T_OP
1.14 Spare
1.15 Spare
1.16 Spare
1.17 Spare
1.18 Spare
1.19 Spare
1.20 Spare

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 5


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.5 BINARY / CONTACT INPUT AND OUTPUT

BINARY INPUT - NR1506AS BINARY OUTPUT - NR1521A


-F87B1.05 -F87B1.15

No Function Status No Function Status

Opto OPTO SUPERVISION Pass 1 BUSBAR A RELAY 1 TRIP INIT. 86BA-11 Pass
1 Spare N/A 2 BUSBAR A RELAY 1 3-PH TRIP INIT. CBF 7A1 Pass
2 Spare N/A 3 BUSBAR A RELAY 1 TRIP INIT. 86BA-12 Pass
3 RELAY ON TEST Pass 4 BUSBAR A RELAY 1 3-PH TRIP INIT. CBF 7A2 Pass
4 RESET RELAY Pass 5 Spare N/A
5 Spare N/A 6 Spare N/A
6 Spare N/A 7 Spare N/A
7 Spare N/A 8 Spare N/A
8 Spare N/A 9 Spare N/A
9 Spare N/A 10 Spare N/A
10 Spare N/A 11 Spare N/A
11 Spare N/A BINARY OUTPUT - NR1523A
12 Spare N/A -F87B2.32
13 Spare N/A 1 BUSBAR A RELAY 1 TRIP Pass
14 Spare N/A 2 BUSBAR A RELAY 1 TRIP Pass
15 Spare N/A 3 Spare N/A
16 Spare N/A 4 Spare N/A
17 Spare N/A 5 Spare N/A
18 Spare N/A 6 Spare N/A
7 Spare N/A
8 Spare N/A
9 Spare N/A
BINARY OUTPUT - NR1301KN
-F87B2.P1
1 BUSBAR A RELAY 1 FAIL Pass
2 BUSBAR A RELAY 1 ALARM Pass
3 Spare N/A
4 Spare N/A

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 6


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.6 STABILITY TEST BUSBAR PROTECTION RELAY

NARI PCS-915 (F87BA1)


Primary Injected Current 150 A = Secondary Current ~ 0,0375 A
GT212 GT222 Stable Unstable
Phase Status
Dia. 1 Dia. 2 A ( Secondary ) A ( Secondary )
Ida_CZ 0,00 Ida_CZ 0,08
R(a) 0,04A 0,04A Pass
BB1.Ida 0,00 BB1.Ida 0,08
Idb_CZ 0,00 Idb_CZ 0,08
S(b) 0,04A 0,04A Pass
BB1.Idb 0,00 BB1.Idb 0,08
Idc_CZ 0,00 Idc_CZ 0,08
T(c) 0,04A 0,04A Pass
BB1.Idc 0,00 BB1.Idc 0,08

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 7


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.7 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Phase R ( a ) Stable Condition Phase R ( a ) Unstable Condition

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 8


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.8 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Phase R ( b ) Stable Condition Phase R ( b ) Unstable Condition

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 9


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.9 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Phase R ( c ) Stable Condition Phase R ( c ) Unstable Condition

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 10


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.10 PROTECTION RELAY SETTING BUSBAR (-F87B)

2.11 SENSITIVITY TEST DIFFERENTIAL (-F87B)

PICK-UP AND DROP-OFF (87)


Phase 87B Setting Pick-up Drop-off Result
L1 0,404 A 0,361 A Passed
L2 0,400 A 0,402 A 0,359 A Passed
L3 0,402 A 0,359 A Passed
** Accuracy ; ≤ 2.5% of setting or 0.02 In, whichever is greater

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 11


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.12 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1)

1PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,800 A 0,00 ° 50 Hz
CT Input 1 - L2 0,000 A -120,00 ° 50 Hz
CT Input 1 - L3 0,000 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 16,50 mS 16,50 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

2.13 OPERATING CHARACTERISTIC TEST 1PHASE_(L1)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0165 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0146 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0119 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 12


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.14 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L2)

1PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,000 A 0,00 ° 50 Hz
CT Input 1 - L2 0,800 A -120,00 ° 50 Hz
CT Input 1 - L3 0,000 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,00 mS 13,00 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

2.15 OPERATING CHARACTERISTIC TEST 1PHASE_(L2)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0170 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0145 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0119 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 13


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.16 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L3)

1PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,000 A 0,00 ° 50 Hz
CT Input 1 - L2 0,000 A -120,00 ° 50 Hz
CT Input 1 - L3 0,800 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 14,90 mS 14,90 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

2.17 OPERATING CHARACTERISTIC TEST 1PHASE_(L3)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0166 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0146 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0117 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 14


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.18 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1-L2)

2PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,800 A 0,00 ° 50 Hz
CT Input 1 - L2 0,800 A -120,00 ° 50 Hz
CT Input 1 - L3 0,000 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,50 mS 13,50 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

2.19 OPERATING CHARACTERISTIC TEST 1PHASE_(L1-L2)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0166 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0143 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0112 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 15


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.20 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L2-L3)

2PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,000 A 0,00 ° 50 Hz
CT Input 1 - L2 0,800 A -120,00 ° 50 Hz
CT Input 1 - L3 0,800 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,30 mS 13,30 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

2.21 OPERATING CHARACTERISTIC TEST 1PHASE_(L2-L3)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0167 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0150 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0117 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 16


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.22 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L3-L1)

2PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,800 A 0,00 ° 50 Hz
CT Input 1 - L2 0,000 A -120,00 ° 50 Hz
CT Input 1 - L3 0,800 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,00 mS 13,00 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

2.23 OPERATING CHARACTERISTIC TEST 1PHASE_(L3-L1)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0168 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0148 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0114 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 17


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

2.24 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1-L2-L3)

3PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,800 A 0,00 ° 50 Hz
CT Input 1 - L2 0,800 A -120,00 ° 50 Hz
CT Input 1 - L3 0,800 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,30 mS 13,30 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

2.25 OPERATING CHARACTERISTIC TEST 1PHASE_(L1-L2-L3)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0138 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0116 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0117 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 18


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3. BUSBAR A PROTECTION RELAY-2

3.0 NAME PLATE DATA RELAY


Manufacturer : NARI ELECTRIC Tracking No : GW1400150PG018/20
Model No. : PCS-915IC-A-EN-170789 IP Address : 198.120.0.55
Serial Number : NRJB21302017B0040 IED Tag No. : -F87BA2

Current Input : 2X3 Binary / Contact Input : 11


Voltage Input : N/A Binary / Contact Output : 11

3.1 VOLTAGE AND CURRENT MEASUREMENT

Phase (R,S,T) CT Setting ## ##


Ip = 4.000 A Is = 1 A

RELAY READING % RELAY READING %


INJECTED CURRENT RESULTS INJECTED CURRENT RESULTS
Expect. Actual ERROR Expect. Actual ERROR

R 0,50 2000 1997,53 -0,12% Passed R 0,50 2000 1992,74 -0,36% Passed
S 0,50 2000 1992,74 -0,36% Passed S 0,50 2000 1992,74 -0,36% Passed
50% 50%
T 0,50 2000 1992,60 -0,37% Passed T 0,50 2000 1992,60 -0,37% Passed

R 0,75 3000 2983,97 -0,53% Passed R 0,75 3000 2983,97 -0,53% Passed
S 0,75 3000 2983,97 -0,53% Passed S 0,75 3000 2979,04 -0,70% Passed
75% 75%
T 0,75 3000 2979,04 -0,70% Passed T 0,75 3000 2983,97 -0,53% Passed

R 1,00 4000 3975,34 -0,62% Passed R 1,00 4000 3975,34 -0,62% Passed
S 1,00 4000 3975,34 -0,62% Passed S 1,00 4000 3970,41 -0,74% Passed
100% 100%
T 1,00 4000 3970,41 -0,74% Passed T 1,00 4000 3970,41 -0,74% Passed

R 1,10 4400 4384,71 -0,35% Passed R 1,10 4400 4369,91 -0,68% Passed
S 1,10 4400 4364,98 -0,80% Passed S 1,10 4400 4379,78 -0,46% Passed
110% 110%
T 1,10 4400 4369,91 -0,68% Passed T 1,10 4400 4364,98 -0,80% Passed

**Measurement tolerance : ≤ 2,00% **Measurement tolerance : ≤ 2,00%

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 19


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.2 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Current Measurement Diameter 1&2 50%

Current Measurement Diameter 1&2 75%

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 20


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.3 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Current Measurement Diameter 1&2 100%

Current Measurement Diameter 1&2 110%

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 21


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.4 LED ASSIGNMENT

LED No DESCRIPTION
1.1 HEALTHY
1.2 ALARM
1.3 CTS/VTS ALARM
1.4 DS ALARM
1.5 87 OP
1.6 DIAMETER1 TRIP
1.7 DIAMETER2 TRIP
1.8 Spare
1.9 Spare
1.10 Spare
1.11 PH.R_OP
1.12 PH.S_OP
1.13 PH.T_OP
1.14 Spare
1.15 Spare
1.16 Spare
1.17 Spare
1.18 Spare
1.19 Spare
1.20 Spare

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 22


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.5 BINARY / CONTACT INPUT AND OUTPUT

BINARY INPUT - NR1506AS BINARY INPUT - NR1521A


-F87B3.05 -F87B2.15

No Function Status No Function Status

Opto OPTO SUPERVISION Pass 1 BUSBAR A RELAY 2 TRIP INIT. 86BA-11 Pass
1 Spare N/A 2 BUSBAR A RELAY 2 3-PH TRIP INIT. CBF 7A1 Pass
2 Spare N/A 3 BUSBAR A RELAY 2 TRIP INIT. 86BA-12 Pass
3 RELAY ON TEST Pass 4 BUSBAR A RELAY 2 3-PH TRIP INIT. CBF 7A2 Pass
4 RESET RELAY Pass 5 Spare N/A
5 Spare N/A 6 Spare N/A
6 Spare N/A 7 Spare N/A
7 Spare N/A 8 Spare N/A
8 Spare N/A 9 Spare N/A
9 Spare N/A 10 Spare N/A
10 Spare N/A 11 Spare N/A
11 Spare N/A BINARY OUTPUT - NR1523A
12 Spare N/A -F87B2.32
13 Spare N/A 1 BUSBAR A RELAY 2 TRIP Pass
14 Spare N/A 2 BUSBAR A RELAY 2 TRIP Pass
15 Spare N/A 3 Spare N/A
16 Spare N/A 4 Spare N/A
17 Spare N/A 5 Spare N/A
18 Spare N/A 6 Spare N/A
7 Spare N/A
8 Spare N/A
9 Spare N/A
BINARY OUTPUT - NR1301KN
-F87B2.P1
1 BUSBAR A RELAY 2 FAIL Pass
2 BUSBAR A RELAY 2 ALARM Pass
3 Spare N/A
4 Spare N/A

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 23


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.6 STABILITY TEST BUSBAR PROTECTION RELAY

NARI PCS-915 (F87BA2)


Primary Injected Current 150 A = Secondary Current ~ 0,0375 A
GT212 GT222 Stable Unstable
Phase Status
Dia. 1 Dia. 2 A ( Secondary ) A ( Secondary )
Ida_CZ 0,00 Ida_CZ 0,08
R(a) 0.04A 0.04A Pass
BB1.Ida 0,00 BB1.Ida 0,08
Idb_CZ 0,00 Idb_CZ 0,08
S(b) 0.04A 0.04A Pass
BB1.Idb 0,00 BB1.Idb 0,08
Idc_CZ 0,00 Idc_CZ 0,08
T(c) 0.04A 0.04A Pass
BB1.Idc 0,00 BB1.Idc 0,08

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 24


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.7 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Phase R ( a ) Stable Condition Phase R ( a ) Unstable Condition

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 25


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.8 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Phase R ( b ) Stable Condition Phase R ( b ) Unstable Condition

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 26


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.9 ATTACHMENT PHOTO MEASUREMENT RELAY (NR PCS-915)

Phase R ( c ) Stable Condition Phase R ( c ) Unstable Condition

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 27


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.10 PROTECTION RELAY SETTING BUSBAR (-F87B)

3.11 SENSITIVITY TEST DIFFERENTIAL (-F87B)

PICK-UP AND DROP-OFF (87)


Phase 87B Setting Pick-up Drop-off Result
L1 0,403 A 0,360 A Passed
L2 0,400 A 0,404 A 0,362 A Passed
L3 0,402 A 0,359 A Passed
** Accuracy ; ≤ 2.5% of setting or 0.02 In, whichever is greater

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 28


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.12 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1)

1PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,800 A 0,00 ° 50 Hz
CT Input 1 - L2 0,000 A -120,00 ° 50 Hz
CT Input 1 - L3 0,000 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 16,50 mS 16,50 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

3.13 OPERATING CHARACTERISTIC TEST 1PHASE_(L1)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0170 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0150 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0118 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 29


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.14 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L2)

1PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,000 A 0,00 ° 50 Hz
CT Input 1 - L2 0,800 A -120,00 ° 50 Hz
CT Input 1 - L3 0,000 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,70 mS 13,70 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

3.15 OPERATING CHARACTERISTIC TEST 1PHASE_(L2)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0167 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0148 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0116 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 30


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.16 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L3)

1PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,000 A 0,00 ° 50 Hz
CT Input 1 - L2 0,000 A -120,00 ° 50 Hz
CT Input 1 - L3 0,800 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 15,30 mS 15,30 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

3.17 OPERATING CHARACTERISTIC TEST 1PHASE_(L3)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0169 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0146 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0117 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 31


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.18 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1-L2)

2PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,800 A 0,00 ° 50 Hz
CT Input 1 - L2 0,800 A -120,00 ° 50 Hz
CT Input 1 - L3 0,000 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,40 mS 13,40 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

3.19 OPERATING CHARACTERISTIC TEST 1PHASE_(L1-L2)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0171 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0154 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0121 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 32


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.20 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L2-L3)

2PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,000 A 0,00 ° 50 Hz
CT Input 1 - L2 0,800 A -120,00 ° 50 Hz
CT Input 1 - L3 0,800 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,60 mS 13,60 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

3.21 OPERATING CHARACTERISTIC TEST 1PHASE_(L2-L3)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0169 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0149 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0122 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 33


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.22 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L3-L1)

2PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,800 A 0,00 ° 50 Hz
CT Input 1 - L2 0,000 A -120,00 ° 50 Hz
CT Input 1 - L3 0,800 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 14,90 mS 14,90 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

3.23 OPERATING CHARACTERISTIC TEST 1PHASE_(L3-L1)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0169 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0150 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0120 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 34


INSPECTION AND TEST REPORT Project No : 177214
FOR Rev No : .02
RELAY CONTROL AND PROTECTION PANEL Date :

3.24 OPERATING TIME TEST DIFF. BUSBAR (87B)_(L1-L2-L3)

3PHASE FAULT (87)


NR PCS-915 Sett. Time Result
Fault Current Applied
87B Time Delay Tolerance Act. time Operating time
CT Input 1 - L1 0,800 A 0,00 ° 50 Hz
CT Input 1 - L2 0,800 A -120,00 ° 50 Hz
CT Input 1 - L3 0,800 A 120,00 ° 50 Hz
0,400 A 0,00 mS 20,00 mS 13,30 mS 13,30 mS Passed
CT Input 2 - L1 0,000 A 0,00 ° 50 Hz
CT Input 2 - L2 0,000 A -120,00 ° 50 Hz
CT Input 2 - L3 0,000 A 120,00 ° 50 Hz

3.25 OPERATING CHARACTERISTIC TEST 1PHASE_(L1-L2-L3)

OPERATING CHARACTERISTIC TEST RESULT


I Diff I Bias Expect. Relay Action
Result
(In) (In) Operate Operate Time
0,50 1,20 Not Trip Not Trip - Passed
0,80 1,10 Trip Trip 0,0134 S Passed
0,80 1,70 Not Trip Not Trip - Passed
1,10 1,50 Trip Trip 0,0116 S Passed
1,10 2,30 Not Trip Not Trip - Passed
1,40 2,00 Trip Trip 0,0100 S Passed

Prepared By: Witnessed / Reviewed By: Reviewed/Approved By:


BVI SC BPI BVI ( SU Engineer )

Name : Name : Name : Name :


Date: Date: Date: Date:

PT. GRAHA USAHA TEKNIK BB_12ASR00GH006 35