COOLING PROJECT
DESIGN, BUILD, COMPLETION, MAINTENANCE IN THE
CONTRACT PERIOD, OF THE THERMAL ENERGY
STORAGE (TES) TANK AND ITS COMPLETE
INTEGRATION WITH DC PROCESS SYSTEM ALONG
WITH RELATED WORKS CIVIL AND MEP AT DCP JBR
AGREEMENT NO : EMP-50-TR-225
PRE-QUALIFICATION (PQ)
S.P No.: EMP-50-TR-225-VL-PQ-CIV-0002
Attention to : MR. SALAH AL AQRA Rev : 01 Date : 6-Feb-2020
Number of Copies :- 1 Hard + 1 Soft Copy
WE ARE SENDING HEREWITH: the following to be mentioned: (this is applicable for Prequalification Submittal)
Arch Structural Mechanical Electrical Control
Material Detail :
Description : Pre-Qualification for Renaissance Engineering Consultants
Specs. Reference : BOQ Reference :
Material Specified : Material Proposed :
Manufacture Local Supplier :
Drg. Reference :
Remarks :
Client’s Comments :
Client's Status :
(A) No Objection (B) No Objection with comments (C) Revise and Resubmit
Reviewed by :
Signature
Distrubution: