Defect
Workshop On
Transformer Residual
Transformer Degradation
Detection of faults at incipient stage.
Estimation of Elapsed Life If not Residual Life.

Life Enhancement Residual Life Diagnosis and decision making on course of pre-emptive
corrective action will require:
Monitoring of several parameters.

Enhancement
History of operational problems and maintenance,
Mumbai design, process information and finger print.

Unfortunately, measured quantities often do not have a


June 02 & 03-2014 Presented By:
Er. Georg P. Daemisch-Germany
direct correlation with defects and ageing, decision
making will need deployment of:
Installation of high voltage distribution and transmission Trend analysis with prior data.
Monday & Tuesday equipment has increased significantly over the years due
to ongoing global demand for power as a result of
Signal processing and statistical tools.
Comparison with experimentally developed models.
proliferation of energy guzzling industries. As a result, the Expert Systems.

Terms: need to ensure the reliability as well as availability of


operation of power systems has achieved paramount
importance.
Complexity of a transformer:
You’ve any idea of the complexity of a transformer? In
Registration Fee: searching for a fault, you’re searching for a needle in a
INR 25,000 Transformers are among the most important and most haystack! Yes, we can help you find that needle!!
All applicable taxes and levies will be payable extra at expensive components of power systems and their failure Core-80,000 SQM for 800MVA, 525kVA transformer.
current rates. can impose extraordinary high costs on plants, factories Copper-285 kilometers of copper wire.
and utilities of all descriptions. Insulation-10MT of paper; 40MT of Oil
How to Register?
Please provide us the names of your candidates. We will 4,500 SQM of Board.
This practical workshop provides knowledge on both the Structure - Frame and Tank-16,000 SQM core plate
send you the invoice that will guide you through the theory and operation of power transformers. The course
registration procedure. surface.
will develop and enhance the understanding of what is Bushings.
involved in the maintenance of these essential Tap Changer.
Registration Cancellation components of the power systems, through the tips and Radiators.
Cancellation requests received more than 14 calendar tricks learnt and developed by some of the world’s pre- Fans.
days before the start of the workshop will receive a refund eminent electrical engineers. Pumps.
minus 50% administration fee. Cancellation requests
received within 14 days prior to the start of workshop will It is critical that all personnel operating and working with
not be entertained. Transformer Ageing:
such equipment have a sound knowledge of their
Paper Ageing.
operational requirements and maintenance. At the end of
Oil Ageing.
Registration Fee will cover only: this workshop, those who attended this workshop will
Ageing by Products.
Participation in the event have gained:
Importance of O2 & H2O.
Tutorial Material Sources of H2O.
Refreshments & Lunch What are the objectives of transformer condition
Moisture in Paper vs Oil.
assessment?
Furan Compounds.
Substitutions: Minimize unplanned transformer outages
Degree of Polymerization.
If you are unable to attend the workshop for which you Minimize outage time when an outage occurs
Estimating Ageing.
have registered, you may designate a substitute from your Minimize maintenance costs
Failure Ratio vs Probability of Failure.
organization. Eliminate catastrophic faults.
Extend life of the asset.
Create and develop an adequate data base. Diagnostic Techniques:
Event Venue Implement improvements to equipments for greater Dissolved Gas Analysis [DGA].
Event will be held in a hotel. Venue address will be reliability. IEEE Reference Gas Levels.
intimated to registered candidates two weeks before event Ratio of Gas Formation.
date. Transformers these days are subjected to severe stress as DGA Periodicity.
a result of continuous over-loading as well as extremely DGA Accuracy and Lab Deviations.
Event Cancellation poor maintenance besides a host of other reasons. These
If for any reason the event is cancelled, our liability will be naturally accelerate the ageing process. As an Asset Oil Quality Analysis:
limited to refund of the Registration Fee paid by you. Manager, you naturally would want to know the residual life Reference Levels.
remaining of your asset. Moisture Content.
Academic Discounts Dielectric Strength.
50% discount for candidates from academic institutions. Do you believe the end of life of a transformer is brought Interfacial Tension.
about by the ageing of the equipment? Most likely, end of Power Factor.
Team Discount life of a transformer can be brought about by escalating Neutralization Number.
Register three or more individuals from your organization local defects than to faults.
at the same time and receive 50% off of the regular
It is possible to run a transformer under a defect for short
Maintenance Criteria:
workshop rate. Corrective Maintenance.
or long periods depending upon the nature and severity of
Preventive Maintenance.
the defect. If appropriate measures are taken, it is also
Government Discount possible to reverse some defects before they turn into
Reliability Centered Maintenance-RCM
To allow employees of Federal, State and Local Increased Reliability through Condition Assessments.
faults.
Governments to take advantage of the unique learning Managing and Extending life of Ageing Assets.
opportunities offered by these workshops, we offer a 50% Complementing Existing Maintenance Practices for
Under a fault, it may still be possible to run a transformer
discount off of the regular workshop rate. Government Better Understanding of Health of Fleet of Transformers.
for a short period of time before a failure occurred. If the
discounts cannot be combined with any other discount. Statistical Comparison of Transformer Fleet to determine
deterioration is irreversible, you’ll have to resort to either
which transformers are most at Risk of Failure.
repairs or a replacement.
On-Site Registration Replacement and Repair Recommendations to Optimize
Please call or email to check seat availability. Transformer Expenses.
You can prevent a total failure of your transformer if you’re
25% extra payment. Avoiding Unplanned Outages through Reliability-Based
vigilant enough and avoid a degeneration of a defect
Cash payment will be accepted. Maintenance.
resulting into a fault which in turn escalates into a failure.
Our experts will tell you how you can do this.
Special Discounts What Can Condition-Based Maintenance do for
We feel that the registration fee should not be a barrier for What is Transformer Condition Assessment your transformers:
an otherwise deserving candidate to attend these Improve Asset Utilization.
Process? Provide Actionable data to support decisions.
educative events. If you feel you are eligible for a discount In short, following are the ingredients of a simple
by virtue of any reason other than those specified above, Allow Capital Expenditure to be deferred.
assessment process:
please contact us. Shift from Time-Based to Condition-Based Maintenance
Monitoring of stress and defect levels.
should reduce overall maintenance activity.
Estimation of extent of :
Proactive “as needed” maintenance-less time-based.
Improve efficiency of maintenance activities. Field Processing of Power Transformers. Maintenance Programs:
Reduction in time required to complete maintenance on Whether due to atmospheric contamination or the by-
equipment through better knowledge of equipment
Basic Maintenance:
products of ageing, the water content of the transformer To ensure that a transformer operates reliably, it is
condition. will increase with age. At some point, it may be desirable to important to do routine maintenance when the unit is in
Reduction in unplanned maintenance work. remove this moisture as well as any particles from the service. The basic maintenance will include visual
Reduction in cost to collect condition data by manual transformer. We’ll discuss in detail the pros and cons of inspections, checking silica-gel status, checking oil
means. different methods of field processing of transformers. leakages, checking cleanliness of bushings, checking
Reduction of field equipment inspections.
pumps, fans, motors and other accessories. This will not
What happens to ageing Dielectric Oils? need an expert; only basic transformer knowledge will be
Oil Treatment sufficient.
Filtration The transformer's insulation is the root of the problem. Its
Oil Reclamation two components, oil and cellulose paper, interact to create
Drying Method can be considered as any process that by-products that decompose the insulation system. Not Advanced maintenance:
only that, the byproducts will increase moisture levels and Advanced Maintenance Program offered will include oil
reduces and maintains at a low level the material’s water
create an environment that will overheat the transformer, cleaning, active part cleaning and drying, and re-clamping
vapor pressure.
which will eventually cause the transformer to fail. of the windings.
Purification or Reconditioning of insulating oil is the
process of removing moisture, dissolved combustible gas You must first understand the problem before you can
and particulate matter, as determined by oil and treat it. In the presence of a catalyst, such as copper, Monitoring:
transformer’s tests. oxygen will react to form those byproducts that attack the If a unit is found to be in a critical condition but still usable,
Regeneration or Reclaiming of insulating oil is the transformer's insulation paper. Ironically, paper has an it may be recommended to instal a suitable monitoring
process of removal of contaminants and products of affinity for the very by-products that contribute to its device. This will help to detect potential faults as well help
degradation such as polar, acidic or colloidal material, as destruction, compounding the problem. In time, further the customer to effectively plan their maintenance for
determined by oil and transformer tests. reactions will create other destructive byproducts like optimization of performance of the equipment.
What considerations should be taken into account to acids, alcohols, and sludge. After saturating the paper, Transformer accessories such as tap changer and
decide whether purification of reclamation is suitable for these byproducts will precipitate out and contaminate the bushings should also be monitored. The output from the
your equipment will be dealt with in detail. oil. installed monitoring device will give an indication when
such maintenance or repairs will have to be undertaken.
Normal vs Abnormal Operation. Inhibitor
Under normal conditions, a transformer should last for Transformer oil often includes an inhibitor additive, which
more than 30 years. But they do not. We will examine in aids in the resistance of oxidation. The reclamation
great detail the causes for the premature death of the process can remove inhibitor, so during the last pass it's
transformer as well as corrective actions that can prolog important to add it back as the oil leaves the HORP rig and
the life. returns to the transformer.
What constitutes Normal Operation and what will be Contamination is the major cause of transformer oil
Abnormal Operation will be examined threadbare. About Er Georg P.Daemisch
breakdown and subsequent transformer failure. Water and Managing Director
Abnormal conditions such as overloading, short circuits particulate contamination challenge the effectiveness of Daemisch Transformer Consult
and their impact on the normal life of a transformer will be dielectric properties to maintain minimum 33KV Regensburg-Germany.
examined. performance to assure expected device life and service daemisch@t-online.de
reliability. Water is the acid enabling mechanism that
reduces TAN [Total Acid Number]. Particulate Georg is an internationally acclaimed expert on Transformer
Residual Life Management as well as Transformer Population
Oil Analysis. contaminates decrease IFT [Interfacial Tension] and Power Management.
Analysis of oil samples is the standard technique in the Factor. Oil color testing is directly related to particle
electricity industry for monitoring the condition of oil filled contamination. He has an intimate knowledge of the causes of premature aging of
equipment. Samples are typically taken annually, with It is a proven fact that the moisture accumulated in a transformers and has specialized in the diagnosis, treatment and
more frequent sampling when there is a possible problem. prognosis aspects. He has published several scholarly articles on
transformer`s cellulose insulation causes it to age the geriatrics of transformers and is a regular speaker at
prematurely. A moisture content that goes from an initial EuroTechon. Throughout the world, he has conducted workshops
Analyses performed on the oil include: factory level of 0.5% to 2.0% after a few years in operation on the ageing of transformers and trained several hundreds of
Dissolved Gas Analysis-DGA will cause a ten-fold increase in the ageing of the cellulose engineers and technicians to equip them with necessary skills for
Color insulation. deriving better reliability, availability and efficiency. Please visit
Moisture Level www.didee.de to know more about his background, achievements
When the moisture content is high, the concentration of and capabilities.
Acidity
dissolved water in the oil increases proportionately,
Breakdown Voltage
thereby potentially compromising the dielectric strength
Furaldehyde Content-FFA
of the oil. As the dielectric oils age, you are likely to
experience any or all of the following:
In DGA, the gases usually considered are: Considerable decrease in Break Down Voltage.
Hydrogen Considerable decrease in Insulation Resistance.
Methane Increase in Dielectric Loss Factor.
Ehane Conditioning will eliminate:
Ethylene Solid Impurities.
Acetyelene Dissolved Water.
Carbon Monoxide Dissolved Gases.
Conditioning will Improve:
Variations in the levels of individual gases, or ratios of Break Down Voltage.
particular gases may indicate a problem with the
equipment. The situation is complicated by the fact that the A dehydrator makes it possible to lower the moisture
levels of dissolved gas measured can be affected by the content to standard levels, thereby increasing the
sampling technique and conditions, the laboratory transformer`s service life. Conditioning saves the cost of
performing the analysis and the duration of sample using new oil frequently and also increases the useful life
storage prior to analysis. of the transformer.
Even commercial oil is seldom sufficiently pure for direct
Authorities now agree that careless sampling and testing use in high voltage equipment, being subject to
techniques has been the source of 99% of “bad” dielectric contamination in transport container and very liable to
readings. What is the correct sampling procedure will be absorb unacceptable contaminants and moisture.
explained in un-ambigous terms.

Indeed, an exhaustive analysis of the insulating oil will


Transformer Operation and Loading: throw a lot of light on the ailments of the transformer as a
Transformers are designed and tested to standards when
whole. However, treating the oil alone for its problems will
they leave the factory and are placed in service. The
not result in the effective treatment of the transformer as a
transformers are loaded and operated based on the user’s
whole.
loading guide lines and maintenance practices.
We’ll highlight how to load and operate transformers by In short, attempt should be made to treat the entire
reviewing factory thermal data and asset health to transformer and not the oil alone. This approach insures
determine the loading factor. enhancement of transformer life by several years and
We’ll also discuss how to load legacy transformers and reliable performance.
how to be certain your new transformers are meeting your
requirements.
Extract reproduced from Bahrain Measurements and Transformer Cooling. Manager-Plant Maintenance Workshops, Engineering Building, Training reliability-centred maintenance when applied to power
maintenance Mahmood Mirza spoke at the start of the Center, Cafeteria and Awali. Many of these essential transformers.
Petroleum Refinery House Magazine: workshop, which was facilitated by Superintendent- assets have reached or passed their manufacturer's
Electrical maintenance Andy Doherty along with Thaslim stated life expectancy, however such transformers are This training workshop was a first for BAPCO In this
A training workshop was held for 50 employees from Kaja and K. N. Abdul Jabbar from Power Consultancy U.K. often still in good condition physically and can often last subject field, and the consultants expressed their
Electrical Maintenance and P&U Engineering last month. The sessions consisted of two day workshops held at the for decades more. appreciation of BAPCO's world-class preventive
The workshop sessions, held from October 18 to 22 and training center and a one-day on-site training session at maintenance programs for all its high-voltage assets.
organized by Plant Maintenance Department's Electrical the LSFO Substation. Paramount to maintaining transformer long life is a
Maintenance Section, covered the topic of Transformer managed program of condition assessment. An essential
Residual Life Enhancement, and was provided by U.K.. Bapco Refinery has a fleet of over 300 oil-filled factor in the condition assessment process is the ability
based Power Consultancy, led by Chief Consultant Georg transformers. The continuous availability of these of Maintenance staff to understand the tell-tale signs of
P. Daemisch, an internationally acclaimed expert on transformers is crucial to the safe and reliable operation of aging and degradation of the transformers. Of equal
Transformer Residual Life Management, plus two other the Refinery's Power Plant, Oil processing Units, Oil importance is their ability to distinguish the fundamental
recognized experts in the respective fields of Transformer Storage and Export facilities, and ancillary services such aspects of corrective, preventive and condition-based
as Refinery Clinic, Security Building, Finance & Admin, maintenance as well as understand the concepts of

is their purpose and application. better understand their options and GVK Power Plant
Transformer Fault Finding Learn a number of procedures for electrical requirements in order to make purchasing Government Bank Note Press
Any fault that impairs the proper functioning of a testing used during factory testing, decisions that would give them the best return Gujarat Electricity Board
transformer must be expediently identified commissioning and maintenance. for their investment. This course is focusing Himachal Pradesh Electricity Board
and rectified. Incorrect decisions would result Explore various oil tests and how to interpret on technical and economic issues that should Hindalco Industries Limited
in further damage to the transformer and their results to make decisions regarding be considered before purchasing a Hirakud Power Station
inevitable increase in the cost of repairs and transformer serviceability and which transformer. Transformer specification must Hospet Steels Limited
extended downtime. Decisions making is often corrective measures to apply. be compiled to ensure that all performance Indian Institute of Technology
invested into operational or maintenance Discuss a number of case studies to learn requirements are met but also to allow Indian Metals and Ferro Alloys Limited
personnel with limited fault diagnostic skills. how to interpret the test result data. manufacturers to offer the best design and Karnataka Power Transmission Corporation
This course explains main causes of most cost effective solution. Guidelines for KRIBHCO Fertilizer Limited
transformer failure, types of faults that may Transformer Operation and planning transformer installation and ensuring Madukkara Cement Factory
occur, as well as the types of tests and their
application in a fault finding process. Through
Maintenance. optimum operating conditions are also Monnet Ispat Limited
Modern transformers are much more efficient, advised. National Hydro Electric Corporation Limited
a number of case studies, it provides guidance Neyveli Thermal Power Plant
on how to interpret the test results. This but much less robust than they were half a Learning Outcomes: NSaria-Iran
course will improve the diagnostic skills and to century ago. The best policy against Identify key aspects of transformer planning,
transformer failure is to ensure that they are Tenga Nasional Bhd-Malaysia
enable the attendees to make informed installation and procurement and learn how to Power Grid Corporation of India Limited
decision for appropriate corrective action. properly operated and maintained. For all provide adequate input into transformer
practical purposes transformer life expectancy Punjab State Electricity Board
specification and design. Orient paper Mills Limited
beyond 20 years significantly depends on the Become familiar with transformer design,
Learning outcomes: quality of maintenance applied to it. basic components, transformer terminology
Rayalaseema Thermal Power Plant
Understand the main causes of transformer This course is focusing on critical issues that Reliance Energy Limited
and materials that are used in the Reliance Industries Limited
failure, examine various types of faults and their should be considered in establishing good manufacturing of transformers.
effect on transformers and learn how to operating practices and implementing an Renukoot Power Station
Learn how to calculate and specify critical Renusagar Power Station
diagnose them. effective transformer maintenance program. It design parameters, components and fittings,
Understand what are the various types of provides very practical guidance for Saurashtra Cement Works
how to choose appropriate transformer type, Sirpur Paper Mills Limited
tests, what is their purpose and their maintenance scheduling, operational and cooling system etc.
application in a fault finding process. testing procedures to achieve long service life Spectrum Power Limited
Understand transformer losses and TATA Power Limited
Learn how to interpret the test results to of power and distribution transformers. efficiency, how they impact on the total cost of
identify a probable cause of failure and make TATA Steels Limited
owning a transformer and how to evaluate the Vardhaman Steel Limited
informed decisions on the appropriate course
of action.
Learning outcomes: bidders based on this total cost. Vijayawada Thermal Power Plant
Learn about transformer construction, Understand the purpose and objective of a West Bengal Power Development Corporation
Discuss a number of case studies to learn transformer specification and what aspects of
how to practically apply the knowledge critical transformer parameters, operating Konaseema Thermal Power Station
conditions and how to control aging installation, transformer testing and service Kothagudem Thermal power Station
obtained during this course. conditions need to be specified
accelerators to ensure long life of Prai Power Station-Malaysia
transformers.
Understand underlying causes of Customer List-Partial
Transformer Testing and Oil transformer failures, how to investigate and Customer List-Partial Dedicated On-Site Workshops
Analysis. prevent failures through various testing
General Workshops Saudi Electric Company
From manufacturing to decommissioning, techniques and how to interpret test data. Shuweihat Theraml Power Plant-UAE
Explore various maintenance strategies, ABB
transformers undergo a variety of tests that Andhra Pradesh State Electricity Board Dubai Electricity & Water Authority
are appropriate for various stages of technical and organizational aspects of Bahrain Petroleum Refinery
maintenance and maintenance activities that Andhra Pradesh Power Transmission
transformer life cycle. Oil deteriorates with Corporation Limited Bahrain Aluminum Limited
time and the aging process may be accelerated would ensure an effective transformer Durgapur Steel Plant
maintenance program. AREVA
by a number of factors. The oil itself can be Atomic Power Station-Kalpakkam Madras Aluminum Limited
used as a diagnostic tool to monitor the Discuss testing procedures, various case National Aluminum Company Limited
studies and a typical maintenance schedule Badarpur Thermal Power Station
condition of transformer interior and allow Balasore Alloys Limited
through an interactive workshop.
timely corrective action to extend
transformer's life. This course discusses
Bhakra Beas Management Board
Bhutan Ferro Alloys Limited
Contact
various types of testing and their applications. Bhutan Power Corportion
It covers detailed testing procedures, what Transformer Design Bhutan Carbides and Chemicals Limited
Jagdish Sandhanshiv
kind of testing is available to monitor the state
Planning, Installation and Birla Cement Factory Mob : +91 9867976570
of oil and paper and how to interpret the test Carborandum Universal Limited
results in order to make a decision for Procurement. Chennai Petroleum Corporation
Email : jagdish@kcluster.com
appropriate corrective action. Through a Purchasing, operating and maintenance Chukkah Power Station Skype : jagyamanmad
number of case studies, it provides guidance decisions must be made in order to spend the Electro Steel Castings Limited
on what are the key parameters that should be least amount of money while still yielding the EMCO Transformers Limited
checked during testing and what kind of most performance of a unit. However the ESSAR Power Limited
KNOWLEDGE CLUSTER PVT LTD
results should be expected. lowest cost option up front often results in a ESSAR Steel Limited FB - 31, First Floor, Highland Corporate Centre,
Learning outcomes: highest cost option over time. Utilities have to GMR Power Plant Kapurbawadi, Thane West, India 400607
Understand the various types of tests, what better understand their options and GMR Ferro Alloys Limited www.kcluster.com