NAME : MER ANTHONY D.

DELA ROSA

DEGREE : Civil Engineer

AGE : 33

FIELD OF EXPERTISE : Civil Engr/Civil Inspector – Oil and Gas Construction


and Power Plant Construction (total years: 8.0 yrs)

ADDRESS : Aborlan, Palawan, Philippines

Email address : meranthonydelarosa@yahoo.com


Cel. No. : 0917-5844016

EDUCATIONAL BACKGROUND:

Bachelor of Science in Civil Engineering (Class 2006)


Palawan State University (PalSU)
Puerto Princesa City, Palawan, Philippines

GOVERNMENT EXAMINATION TAKEN:

Registered Civil Engineer (November 2006)


Licensure No. 0107011

OTHER SKILL:

Computer literate (MS Word, MS Excel, QMS Programs such as SMC (Site Management
& Control), NCIS (Nuclear Power Plant Construction Information System), NPCMS (Nuclear
Power Plant Construction Management System)

Driving

WORK EXPERIENCE:

HYUNDAI Engineering & Construction


Barakah Nuclear Power Plant, Abu Dhabi, UAE
Emirates Nuclear Energy Corporation (ENEC)
QA/QC Civil Engineer – Power Block Area
October 2012 to September 2015
Job Description
Rev. No. :
Department/Team Name : Quality
Position (or working section) : Civil Inspector
Individual Work Assignment
Categorization of work Details of work
Conduct Quality Inspection and Control Test Procedures for
Auxiliary Buildings and Related Structures using, Verification on
Quality Records/Documents
• CP-A1 Pre-Pouring Inspections - Conduct Quality Inspections on Concrete
Materials such as reinforcing bars, embed plates, sleeves, pipes, concrete
penetrations, construction openings and architectural openings,
miscellaneous steel inserts and anchorages, anchor bolts for equipment
foundations and columns, curb details inspections for slabs, beam pockets,
door openings and wall openings verifications, PVC water-stop, PVC
membrane and control tests (air pressure) for underground structures, BMS
bar-coupler installation and control tests verification, Rebar Heat
Bending/Cadwelding Control for onsite bending and cadwelding works,
verifications on location and elevation of concrete pouring block/CJ,
coordinates with electrical/ mechanical/ architectural/ construction group
for any deviations.

품질검사 • CP-A1 Concrete Pouring Inspections – Conducts Quality Inspections on


(Quality Inspection) Concrete Vibration and Consolidation, Verification on Suitability of
Concrete Placing Materials, Equipments and Methodology, Control on
Batch Ticket Receiving and Inspection, Conducts Visual Inspections on
Concrete Mix including Slump and Temperature, Coordinates any Quality
Findings to Architecture/Construction Group for any deviations
encountered.
• CP-A1 Post-Concrete Inspections – Conducts Quality Inspections on
Concrete Curing Materials such as curing paper, Verification on suitability
of Concrete Curing, Monitoring of Curing activities until release, Conducts
Crack Inspections, if any presence of early shrinkages and thermal-related
cracks, coordinates with Architectural/Construction Group for any
deviations encountered.
-Review on reference documents CP-Spec, QCP, WPP/QCI, PS, POR, FCR
-Control on non-conforming items (NCR, CAR)
-Witness/Verification on Personnel Approval for Certified Rebar Heat Bender, Cadwelder, Concrete
Repair Worker, BMS- bar coupler Installer, PVC Waterproofing Membrane Installer, Review on
Calibration Certificates of Material & Equipments, Installation of RED NCR tags and release upon
closure and acceptance on disposition.
CONTRACTING AND CONSTRUCTION ENTERPRISES, LTD. (CCE)
JUBAIL EXPORTS REFINERY PROJECT
Satorp’s JERP2 Package 2A/5A (Civil and Rtr Works)
Jubail, Saudi Arabia

PERIOD PROJECT POSITION

May 2010 up to May 2012 Jubail Exports Refinery Project QA/QC inspector Civil
Saudi Aramco Total Refining and
Petrochemical Company
(Satorp’s JERP2 Project)
Package 2A/5A (Civil and RTR Works)

CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY S.A.L. – QATAR


GAS TO LIQUID PROJECT – Ras Laffan Industrial City, Qatar 60972
Pearl Shell Gas to Liquid

PERIOD PROJECT POSITION

January 2008 to January 2010 Ras Laffan Industrial City QC inspector Civil
Gas to Liquid Project (GTL) GTL Phase 1
Qatar Shell Pearl GTL Project

EEI CORPORATION – Construction Division


CBNC HPP2 Expansion Project, Rio Tuba, Bataraza, Palawan, Philippines
#12 Manggahan St, Brgy Bagumbayan
Libis, Quezon City
1110 Philippines

PERIOD PROJECT POSITION

January 2006 to September 2007 Riotuba Nickel Mining Co. QC Engr / QC Inspector
CBNC HPP2 Project QC Batching Plant
JGC Temporary Facilities QC Materials Receiving
Riotuba, Bataraza, Palawan

PROJECT HIGHLIGHTS:

1. Satorp’s Jubail Exports Refinery Project

SAUDI ARAMCO TOTAL Refining and Petrochemical Company (SATORP), a company


that is 62.5% owned by Saudi Aramco and 37.5% owned by TOTAL signed on June 24,
2010, the finance documents for US$8.5 billion of senior project finance facilities that
have been secured for the Jubail refinery. The availability of the financing marks another
important step in the progress of this 400,000 barrels per day world-class, full conversion
refinery in Jubail, Saudi Arabia, which is scheduled to be operational in 2013. Finances
totalling US$8.5 billion were secured from multiple sources including US$4.01 billion from
the Public Investment Fund and Export Credit Agencies (covered and direct), and
US$4.49 billion from commercial financial institutions. The senior loan facilities have a
tenor of 16 years with an all in pricing of 1.85% (above LIBOR) for the US Dollar
commercial and Export Credit Agencies (ECA) covered loan facilities. The financing has
been very well received by a diverse group of local, regional and international banks, with
commitments received for over US$13.5 billion.When completed, the refinery will be one
of the most advanced refineries in the world and will process Arabian Heavy crude. Its
products will fulfill the most stringent specifications, to meet the rising demand for
environmentally-friendly fuels. The full-conversion refinery will maximize production of
diesel and jet fuels and will also produce 700,000 metric tons per year (t/y) of paraxylene,
140,000 t/y of benzene and 200,000 t/y of polymer-grade propylene. The synergies
between Saudi Aramco and TOTAL lie in the fact that both companies bring knowledge
and expertise to the joint venture company. Saudi Aramco’s crude oil supply is located
near Jubail, a world-class industrial area and TOTAL is an international oil company with
a fully integrated value chain and a global presence.

2. Ras Laffan Industrial City Gas to Liquid Project is a project in which natural gas is
converted into clean fuel and other valuable products. It is the worlds largest integrated
Gas to Liquid project and the largest energy project ever launched within the borders of
Qatar. The Pearl GTL project is being developed under a Development and Production
Sharing Agreement with the government of the State of Qatar. The agreement covers
offshore and onshore project development and operations, with Shell providing 100 per
cent of project funding. Upstream some 1.6 billion cubic feet of wellhead gas will be
produced, transported and processed per day to produce 120,000 barrels of oil
equivalent per day of condensate, liquefied petroleum gas and ethane. Downstream dry
gas will be used as feedstock to produce 140,000 barrels per day of clean, high quality
GTL fuels and products. The Pearl GTL project is expected to produce some 3 billion
barrels of oil equivalent.
Work includes concreting in large scale from foundation structures to beams, columns,
slabs, pavement, drainage ditches, pipe trenches, cable trenches, duct banks, piperack
structures, and other miscellaneous foundations.

3. RioTuba Nickel Mining HPP2 Project is an expansion project of the Coral Bay Nickel
Mining Company located at RioTuba, Bataraza, Palawan. The construction of this project
is composed primarily of large Foundation Structures, Buildings such as Diesel-Engine
Bldg, Switchgear Bldg, etc., Concrete pavement and Asphalt roads, drainage rip-rap,
drainage canals and slope protection structures, cable trenches, ditches, pipe trenches
and ductbanks, and major tanks such as pressure tanks, acid tanks, thickeners, cooling
towers, ponds and other neutralization basins. Vessels include autoclave which is the
heart of the mining process and many others. The construction of JGC (Japan Gas
Construction Phils.) Temporary Facilities, as the main contractor of the expansion project,
includes major earthworks for ductbanks and cable trenches, pipe trenches and ditches,
buildings include the Jr and Sr Camp, the JGC Material Science Office Building, the JGC
Warehouse and Generator-Set house.
DUTIES AND RESPONSIBILITIES:

(a) General Area of Responsibilities

Conduct random inspection and test to check compliance with project specification and
requirements and reporting of inspection and test result, and guide the Field Operation
Group in the quality and documentation requirements of the project

(b) Specific Responsibilities

1. Verification of hardware compliance with project requirements by conducting


(a) Random inspection at site
(b) Quality Control Test (Soil Test, and other Materials Test)

2. Direct interface with Project In-Charge for the implementation of Quality Control
disposition.

3. Generation of project’s quality records, collation and safekeeping.

4. Implementation of quality requirements of the project.

5. Conduct Quality Awareness Orientation to Field Operation Group.

6. Involved in many quality matters such as QCP, ITP, Method Statements, NCR
Reports, Observation Reports, etc.

HIGHLIGHTS OF PREVIOUS RESPONSIBILITIES:

1. Conducts inspection, evaluation, testing procedure and demonstrate the capabilities in the
following function

1.1 Conducts inspection, evaluation and test, setting up test including preparation
and set-up of related equipment.
1.2 Evaluating the validity and acceptance of inspection, examination and test
results.
1.3 Reports the inspection, examination and test results. Implement the above using
specific knowledge required in the following sub-category of inspection.
1.3.1 Civil Inspection 1.3.2 Structural Inspection
1.3.3 Architectural Inspection

2. Review the requirement of materials or activities for inspection in reference to:

2.1 Procurement document


2.2 Project drawings and technical specification including design changes.
2.3 Reference code and standards.
2.4 Applicable procedures and instructions
3. Prepares inspection checklist/plan base of the above indicates in the checklist/plans the quality
level of material or activity to be inspected.

4. Performs in-process or final inspection for the products or receiving inspection for incoming
materials.

5. Identifies discrepant items by attaching a “QC Hold Tag” to it.

6. Compares inspection results with applicable, after discussing the inspections, code, standard,
procedures, checklist and/or drawings.

7. Prepares QCIR as applicable, after discussing the inspection results with the action party.

8. Reviews and signs QCIR, or evaluates and determines the necessity to generate NCR.

9. Distributes QCIR to concerned parties.

10. Verifies action taken by the action party and initiate QCIR close-out

11.0 Removes QC Hold Tag(s) from the corresponding item items covered by QCIR.

12.0 File original QCIR for retrievability and forward original QCIR(s) in batches to Documentation
Control Section (DCS) for safekeeping

13.0 Conduct testing of the following

13.1 Sieve analysis of sand, gravel (coarse aggregates) 13.4 Slump Test
13.2 Laboratory compaction 13.5 Air Entrain Test
13.3 Field Density Test 13.6 Rebound Hammer Test
13.3.1 Sand Cone-Jar Method 13.7 Atterberg Limits
13.3.2 Troxler / Humboldt 13.8 Dry Film Thickness

14.0 Monitor Testing together with the third-parties in:

14.1 Cross-Hole Sonic-Logging Testing


14.2 Pile-Integrity Testing
14.3 Plate-Load Testing and Tension-Load Testing
14.4 Dynamic Cone Sounding

15.0 Conduct Quality Control Tests as required:

15.1 Air Pressure Tests for PVC Waterproofing Membrane


15.2 Concrete Surface Inspection and Crack Inspection
15.3 Grouting works inspection such as Flow Cone
15.4 Rebar Heat Bending Inspection
15.5 Cadwelding Works Inspection
15.6 BMS- Bar-Coupler Mechanical Splice Inspection
15.7 Concrete Repair Inspections
15.8 Personnel Qualification Tests and Control prior to approval on special works such as
Concrete Repair Worker, Rebar Heat Bender, Cadwelding Worker, BMS Worker and
others as required.

16.0 Make Quality Control Documentations/Dossiers as required including (Corrective Action /


Preventive Action Reports):

16.1 Inspection Checklists


16.2 Daily Inspection Reports / Quality Inspection Reports
16.3 Field Trouble Reports / Observation Reports
16.4 Nonconformance Reports, Log-Book Entry, Deficiency Reports
16.5 Material Inspection Reports
16.6 Civil / Architectural Inspection reports a required

17.0 Review on Quality-related documents and recommendations such as

17.1 Work-Plan Procedures, Civil / Architectural Procedures


17.2 Construction Package Specifications, Technical Specifications as reflected on
Project and Work-Plan Procedures
17.3 Material Specification / Procurement Specifications
17.4 Structural Analysis, Field Change Drawings and other applicable
drawings/procedures
PERSONAL DATA SHEET:

Date of Birth: October 21, 1982


Place of Birth: Iraan, Aborlan, Palawan
Permanent Address: Iraan, Aborlan, Palawan
Civil Status: Single
Height: 5’ 4”
Weight: 65 kgs
Sex: Male
Religion: Roman Catholic
Nationality: Filipino
Languages/Dialect: English/Filipino
Father’s Name: Virgilio Dela Rosa
Occupation: Retired Local Assessment Officer IV, LGU
Mother’s Name: Leonita Dela Rosa
Occupation: DepEd District Schools Supervisor Palawan

CHARACTER REFERENCES:

Engr. Cheolmin Lee,


cheolmin.lee@samsung.com
Samsung C & T
Hyundai-Samsung Joint Venture
ENEC’s Baraka Nuclear Power Plant Units 1 & 2, UAE
Auxiliary Buildings Group Quality Team Leader

Engr. Julio L. Paris


Contracting and Construction Enterprises, Ltd.
Satorp, Jubail Exports Refinery
Jubail2, Saudi Arabia
QA/QC Supervisor

Engr. Mohammed Hassan El Thahawy


Consolidated Contractors International Company S.A.L.
Pearl Shell GTL Project
Ras Laffan Industrial City, Qatar
QC Engr – GTL Phase 1

Engr. Probo S. Canada


EEI Corporation Construction Division
RioTuba, Bataraza, Palawan Project
CBNC HPP2 Project
QC Manager