Professional Documents
Culture Documents
DELA ROSA
AGE : 33
EDUCATIONAL BACKGROUND:
OTHER SKILL:
Computer literate (MS Word, MS Excel, QMS Programs such as SMC (Site Management
& Control), NCIS (Nuclear Power Plant Construction Information System), NPCMS (Nuclear
Power Plant Construction Management System)
Driving
WORK EXPERIENCE:
May 2010 up to May 2012 Jubail Exports Refinery Project QA/QC inspector Civil
Saudi Aramco Total Refining and
Petrochemical Company
(Satorp’s JERP2 Project)
Package 2A/5A (Civil and RTR Works)
January 2008 to January 2010 Ras Laffan Industrial City QC inspector Civil
Gas to Liquid Project (GTL) GTL Phase 1
Qatar Shell Pearl GTL Project
January 2006 to September 2007 Riotuba Nickel Mining Co. QC Engr / QC Inspector
CBNC HPP2 Project QC Batching Plant
JGC Temporary Facilities QC Materials Receiving
Riotuba, Bataraza, Palawan
PROJECT HIGHLIGHTS:
2. Ras Laffan Industrial City Gas to Liquid Project is a project in which natural gas is
converted into clean fuel and other valuable products. It is the worlds largest integrated
Gas to Liquid project and the largest energy project ever launched within the borders of
Qatar. The Pearl GTL project is being developed under a Development and Production
Sharing Agreement with the government of the State of Qatar. The agreement covers
offshore and onshore project development and operations, with Shell providing 100 per
cent of project funding. Upstream some 1.6 billion cubic feet of wellhead gas will be
produced, transported and processed per day to produce 120,000 barrels of oil
equivalent per day of condensate, liquefied petroleum gas and ethane. Downstream dry
gas will be used as feedstock to produce 140,000 barrels per day of clean, high quality
GTL fuels and products. The Pearl GTL project is expected to produce some 3 billion
barrels of oil equivalent.
Work includes concreting in large scale from foundation structures to beams, columns,
slabs, pavement, drainage ditches, pipe trenches, cable trenches, duct banks, piperack
structures, and other miscellaneous foundations.
3. RioTuba Nickel Mining HPP2 Project is an expansion project of the Coral Bay Nickel
Mining Company located at RioTuba, Bataraza, Palawan. The construction of this project
is composed primarily of large Foundation Structures, Buildings such as Diesel-Engine
Bldg, Switchgear Bldg, etc., Concrete pavement and Asphalt roads, drainage rip-rap,
drainage canals and slope protection structures, cable trenches, ditches, pipe trenches
and ductbanks, and major tanks such as pressure tanks, acid tanks, thickeners, cooling
towers, ponds and other neutralization basins. Vessels include autoclave which is the
heart of the mining process and many others. The construction of JGC (Japan Gas
Construction Phils.) Temporary Facilities, as the main contractor of the expansion project,
includes major earthworks for ductbanks and cable trenches, pipe trenches and ditches,
buildings include the Jr and Sr Camp, the JGC Material Science Office Building, the JGC
Warehouse and Generator-Set house.
DUTIES AND RESPONSIBILITIES:
Conduct random inspection and test to check compliance with project specification and
requirements and reporting of inspection and test result, and guide the Field Operation
Group in the quality and documentation requirements of the project
2. Direct interface with Project In-Charge for the implementation of Quality Control
disposition.
6. Involved in many quality matters such as QCP, ITP, Method Statements, NCR
Reports, Observation Reports, etc.
1. Conducts inspection, evaluation, testing procedure and demonstrate the capabilities in the
following function
1.1 Conducts inspection, evaluation and test, setting up test including preparation
and set-up of related equipment.
1.2 Evaluating the validity and acceptance of inspection, examination and test
results.
1.3 Reports the inspection, examination and test results. Implement the above using
specific knowledge required in the following sub-category of inspection.
1.3.1 Civil Inspection 1.3.2 Structural Inspection
1.3.3 Architectural Inspection
4. Performs in-process or final inspection for the products or receiving inspection for incoming
materials.
6. Compares inspection results with applicable, after discussing the inspections, code, standard,
procedures, checklist and/or drawings.
7. Prepares QCIR as applicable, after discussing the inspection results with the action party.
8. Reviews and signs QCIR, or evaluates and determines the necessity to generate NCR.
10. Verifies action taken by the action party and initiate QCIR close-out
11.0 Removes QC Hold Tag(s) from the corresponding item items covered by QCIR.
12.0 File original QCIR for retrievability and forward original QCIR(s) in batches to Documentation
Control Section (DCS) for safekeeping
13.1 Sieve analysis of sand, gravel (coarse aggregates) 13.4 Slump Test
13.2 Laboratory compaction 13.5 Air Entrain Test
13.3 Field Density Test 13.6 Rebound Hammer Test
13.3.1 Sand Cone-Jar Method 13.7 Atterberg Limits
13.3.2 Troxler / Humboldt 13.8 Dry Film Thickness
CHARACTER REFERENCES:
I hereby certify that the above information is true and correct to the best of my
knowledge and belief.
Mer Anthony D. Dela Rosa
Applicant