You are on page 1of 7

SHEET 3 OF 5

AIR COMPRESSOR PACKAGE DATA SHEET

CLIENT : PT PERUSAHAAN GAS NEGARA (PERSERO) TBK REV


PROJECT TITLE : SOUTH SUMATRA-WEST JAVA GAS PIPELINE PROJECT BY
CONTRACT PACKAGE NO.5, COMPRESSOR STATION CHECK
JOB NO. : C22H2G5018 / 05-1307 APP'D
DOC NO. : 005-20-R-DS-208 DATE

1 Proposal Purchase As Built


2 General
3 Service AIR COMPRESSOR Item No. 20-C-2310 A/B
4 Client PT Perusahaan Gas Negara (Persero) Tbk. Quantity 2 1 Working + 1 Stand By
5 Location COMPRESSOR STATION PO No
6 Manufacture Serial No
7 Compressor Type Rotary Screw Reciprocating Model No
8 Lubrication Type Oil Free Oil Lubricated Area Classification NON HAZARDOUS
9 Operation Mode Continuous Intermittent Parallel Indoor Outdoor
10 Operating Conditions & Requirements Site Condition / Utilities
11 Min 211 + x (#1) Saliferous Salt Laden
Inlet Flow Rate SCFM Air Quality
12 Max Corrosive
13 Suction Pressure 0 psig Altitude above sea level 203-269 ft
14 Inlet Temp 72 Min 80 Norm 93 Max 0
F Normal 80 o
F
15 Relative Humidity 81.5 Min 85 Norm 90.2 Max % Ambient Temperature Max 93 o
F
16 Disch. Pressure (#5) 90 Min 130 Norm 140 Max psig Min 72 o
F
17 Discharge Temp Norm 100 Max 0
F Require Tropicalization Yes No
18 Compressor Design Pressure 160 psig Require Winterization Yes No
19 Required Dew Point -40 o
F Pressure N/A psig
Cooling Water Supply
20 Required Oil Content Including Vapor 10 ppm (#2) Temperature N/A o
F
21 Design Temperature 150 o
F Pressure N/A psig
Cooling Water Return
22 Temperature N/A o
F
23 Cooling Water Flow Rate N/A GPM
24 Auxiliaris To Be Supplied Instruments And Control Requirements
25 Electric Motor Driver Diesel Engine Driver
26 Gear Unit/Accessories (#3) Guards Automatic operation (loading/unloading)
27 Inlet Filter Blow-Off/Silencer Manual start/stop (locally)
28 Inter Cooler/Air Cooled Air Dryer Pre-Filter Lead/lag operating modes
29 Liquid Separator Air Dryer Compressor start/stop indication send to control room
30 After Cooler/Air Cooled (#4) Air Dryer After Filter Compressor common fault alarm indication send to control room
31 Air Reservoir Safety Relief Valves at discharge line
32 Instrument Air Filter (Dual) Noise Abetament Shroud Pressure Indicator
33 Spreader Bar and Sling Assembly Temperature Indicator
34 Common Skid (Compressor Package/Dryer/Filter/Reservoir) Temperature switch High High (for Interlock and Alarm)
35 Other called for in General Notes at compressor discharge
36 Electric Motor Driver Pressure switch Hgh High (for Interlock and Alarm)
37 Power Supply 380 V 3 Ph 50 Hz at compressor discharge
38 Motor Rated Power (#1) KW Level indicator for lubricant
39 Enclosure Type TEFC Protection Rating IP 55 PSV with setting pressure 160 psig at each unit
40 Winding Configuration Delta Star Star Delta Pressure Differential Transmitter (for Interlock and alarm) for inlet air filter
41 Power (#1) KW
YES
42 Space Heater Voltage 110 V
43 NO
44 Power Factor Service Factor
45 Motor Type Squirel Cage Synchronous
46 Insulation Class F Temp. Rise Class B Instrument Area Classification Hazardous Non Hazardous
47 Rotation Viewing at Motor Fan CW CCW Instrument Protection Class IP 55
48 Notes
49 #1 To be decided by vendor. (x = Dryer regeneration flow)
50 #2 Max . Oil content including vapor at outlet compressor package 10 ppm
51 #3 Gear unit or belt or coupling for power transmission to be provided by vendor
52 #4 An after cooler, air cooled type shall be installed downstream of each compressor to cool the air become max. 100 °F
53 #5 Discharge Pressure at oulet battery limit as spefied in P&ID of Instrument and Utility Air System Dwg. No. 005-20-DG-322.
54 #6 Electrical requirement shall be refer to General Specification for Electrical Equipment in Package Unit Doc. No. 005-20-E-SP-209.
55
SHEET 4 OF 5

AIR COMPRESSOR PACKAGE DATA SHEET

CLIENT : PT PERUSAHAAN GAS NEGARA (PERSERO) TBK REV


PROJECT TITLE : SOUTH SUMATRA-WEST JAVA GAS PIPELINE PROJECT BY
CONTRACT PACKAGE NO.5, COMPRESSOR STATION CHECK
JOB NO. : C22H2G5018 / 05-1307 APP'D
DOC NO. : 005-20-R-DS-208 DATE

1 Performance and Design Features


2 Design Code / Standard Number of stage (#1) Speed (#1) RPM
3 Brake Horse Power (#1) Estimated noise level (#1) Overall efficiency (#1) %
4 Coupling Type (#1) Closed Coupled Flexible with spacer Non sparking guard
5 Material of Construction Casing CI Rotor(Screw) CS Shaft CS
6 (#7.) Coupling Coupling Guard Baseplate
7 Safety / Alarm / Shutdown Devices Shop Inspection
8 Initiating Condition Indication Alarm Shut Down Required Witnesed
9 Inlet Filter Diff Press H Shop Inspection Test
10 Discharge Air temp H HH Hydrostatic test
11 Discharge Press H,L HH Leak Test
12 Lube Oil Press Mechanical running test
13 Lube Oil Temp Performance test
14 Noise test
15 Vibration Test
16 Notes (Continued)
17 #7. Material of Construction of Air Comprerssor packaged to be detailed by vendor
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
SHEET 5 OF 5

AIR DRYER PACKAGE DATA SHEET

REKAYASA

CLIENT : PT PERUSAHAAN GAS NEGARA (PERSERO) TBK REV B C D 0


PROJECT TITLE : SOUTH SUMATRA-WEST JAVA GAS PIPELINE PROJECT BY TG TG TG
CONTRACT PACKAGE NO.5, COMPRESSOR STATION CHECK SA SA SA
JOB NO. : C22H2G5018 / 05-1307 APP'D SYF SYF SYF
DOC NO. : 005-20-R-DS-208 DATE Sep.19,'06 Nov.28,'06 Feb.09,'07 Feb.27,'07

1 Proposal Purchase As Built


2 ITEM NUMBER : 20-M-2330 A/B NO. REQUIRED : 2 SERVICE : AIR DRYER
3 SERIAL NO. : MODEL : TYPE : Adsorption type with
4 MANUFACTURER : heatless regeneration
5 OPERATING CONDITIONS
6 FLUID AIR OUTLET CONDITION (#2)
7 FLOW (scfm) IN 203.8 + x (#1) OUT 203.8 DEW POINT (oF) -40 TEMP. (oF) 100 max.
8 CONTROL AUTO. (#5) MANUAL PRESS. (psi) MIN. 80 max. 130
9 INLET CONDITION PRESS. DROP (psi) ALLOW 10 (#3) ACT.
10 PRESS. (psi) min. 90 max 140 INSTALLATION INDOOR OUTDOOR
11 TEMP. (oF) min. max. 100 AMB. TEMP. (oF) MIN. 72 MAX. 93
12 DESIGN PRES. (psi) : 160 DESIGN TEMP. (oF) 150 HAZARDOUS AREA CLASS.: NON HAZARDOUS
13 CONSTRUCTION
14 DESICCANT TYPE DESICCANT: Activated Alumina REFRIGERANT TYPE REFRIGERANT:
15 DESICCANT QUANTITY.(KG): (#6) /CHAMBER AIR COOLED WATER COOLED
16 REGENERATION CYCLE TIME (min): (#6) NO. OF COMPRESSOR
17 THERMAL SWING ELECTRIC STEAM TYPE OF COMPRESSOR
18 PRESSURE SWING, (HEATLESS) CONDENSER HEAT DUTY (Btu/h)
19 AIR FLOW (scfm) EVAPORATOR HEAT DUTY (Btu/h)
20 REGENERATION (#6) OTHERS -
21 BLOWER, TYPE: ROOTS CAP (SCFM)
22 ADSORPTION CHAMBER, QUANTITY: 2 PREFILTER, QUANTITY: 1 Working 1 Stand-by
23 TYPE: TWIN TOWERS REMOVED PARTICLE : WATER, OIL DROPLETS AND DUST
24 MATERIAL, CHAMBER: CS FILTRATION (micron): 0.6 EFF. : 99%
25 INTERNAL ELEMENT: (#6) TYPE : COALESCER DESIGN LIFE TIME (month) : 12
26 DIA. (mm): (#6) HEIGHT (mm): (#6) ACCESSORIES : DRAIN TRAP
27 DESIGN. PRESS (psi) 160 DESIGN. TEMP. (oF) 150 AFTER FILTER, QUANTITY: 1 Working 1 Stand-by
28 CORROSION ALLOWANCE (mm): (#6) FILTRATION (micron): (#2) EFF. : 99%
29 DES. CODE: ASME SECT. VIII DIV. 1 TYPE : (#2) DESIGN LIFE TIME (month) : 12
30 ACCESSORIES : DRAIN TRAP
31 ACCESSORIES OTHERS
32 AIR HEATER SILENCER AND FILTER BASEPLATE COMMON SEPARATE
33 RELIEF VALVES DESICCANT INIT. CHARGE WEIGHT (kg): (#6)
34 DRAIN TRAPS DRAIN VALVES MAX. MAINTENANCE WEIGHT (kg): (#6)
35 SWITCH-OVER VALVES REFRIGERANT SPACE REQD: L X W X H (m): (#6)
36 LOCAL CONTROL PANEL INSTRUMENTATION EXP. SOUND LEVEL (dBA @ 1 m): 85
37 DEW POINT INDICATOR CODE & STANDARD: ASME Sec.8 Div. 1
38 INTERNAL PIPING, MAT'L: CS ISO 8573-1 Class 1
39
40 INSTRUMENTS & CONTROL REQUIREMENTS SHOP INSPECTION
41 Automatic Regeneration cycle operation Required Witnessed
42 Running indication Hydrostatic Test
43 Indication lamp for each tower for operation or regeneration Leak Test
44 Connection terminals for running and common alarm signals of dryer Dryer switch test and fuction test
45 UTILITY CONDITION USER'S NOZZLE CONNECTION
46 ELECTRIC POWER NO. DESCRIPTION SIZE RATING FACING
PH HZ V KW POLES
47 SERVICE (inch) (Lb)
48 INSTRUMENT 1 50 220 1
49 MOTOR N/A 2
50 HEATER N/A 3
51 REMARKS :
52 #1. x = Dryer Regeneration Flow
53 #2. Air Quality Product shall be in accordance with ISO 8573-1, Class 1
54 #3. Pressure drop for total package including pre-filter and After filter.
55 #4. N/A
56 #5. Air Dryer shall be equipped with necessary control for automatic switch over between towers
57 #6. To be decided by Vendor
 

 
 

You might also like