Professional Documents
Culture Documents
Pump Division
Types: DMX/DMXD/DMXH/DMXDH
CENTRIFUGAL PUMPS
BALL/BALL CONFIGURATION
Single Suction
USER INSTRUCTIONS:
INSTALLATION, OPERATION, MAINTENANCE
User Instructions – 71569282 10/04 (E)
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 2
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 3
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 4
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 5
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 6
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Pumps have a temperature class as stated in the to make sure that seal chambers, auxiliary shaft seal
ATEX Ex rating on the nameplate. These are based systems and any heating and cooling systems are
on a maximum ambient of 40 °C (104 °F); refer to properly filled. If the operation of the system cannot
Flowserve for higher ambient temperatures. avoid this condition the fitting of an appropriate dry
run protection device is recommended (e.g. liquid
The temperature of the liquid handled influences the detection or a power monitor).
surface temperature on the pump. The maximum To avoid potential hazards from fugitive emissions of
permissible liquid temperature depends on the vapor or gas to atmosphere the surrounding area
temperature class and must not exceed the values in must be well ventilated.
the table that follows.
The temperature rise at the seals and bearings and 1.6.4.5 Preventing sparks
due to the minimum permitted flow rate is taken into
account in the temperatures stated. To prevent a potential hazard from mechanical
contact, the coupling guard must be non-sparking
Maximum Temperature limit of liquid and anti-static for Category 2.
Temperature
surface handled (* depending on
class to
prEN 13463-1 temperature material and construction
permitted variant - check which is lower) To avoid the potential hazard from random induced
T6 85 °C (185 °F) Consult Flowserve current generating a spark, the earth contact on the
T5 100 °C (212 °F) Consult Flowserve baseplate must be used.
T4 135 °C (275 °F) 115 °C (239 °F) *
T3 200 °C (392 °F) 180 °C (356 °F) * Avoid electrostatic charge: do not rub non-metallic
T2 300 °C (572 °F) 275 °C (527 °F) * surfaces with a dry cloth; ensure cloth is damp.
T1 450 °C (842 °F) 400 °C (752 °F) *
The coupling must be selected to comply with
The responsibility for compliance with the 94/9/EC and correct alignment must be maintained.
specified maximum liquid temperature is with the
plant operator. 1.6.4.6 Preventing leakage
ENSURE THE PUMP IS PROPERLY FILLED 1.6.4.7 Maintenance to avoid the hazard
AND VENTED AND DOES NOT RUN DRY
Ensure the pump and relevant suction and discharge CORRECT MAINTENANCE IS REQUIRED
pipeline system is totally filled with liquid at all times TO AVOID POTENTIAL HAZARDS WHICH GIVE A
during the pump operation, so that an explosive RISK OF EXPLOSION
atmosphere is prevented. In addition it is essential
Page 7
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
The responsibility for compliance with adversely affect the ambient conditions. Where
maintenance instructions is with the plant owner there is a risk from such tools or materials,
or operator. maintenance must be conducted in a safe area.
To avoid potential explosion hazards during It is recommended that a maintenance plan and
maintenance, the tools, cleaning and painting schedule be adopted. (See section 6, Maintenance).
materials used must not give rise to sparking or
1.8 Noise level The values shown have been derived from actual
noise test data and are based on the following
1.8.1 Pump noise levels conditions:
The following tables may be used to determine the
maximum expected sound pressure levels (SPL), a) Equipment is located in a free field above a
expressed in dBAs (dB), for reflecting plane in which the reduction in noise
DMX/DMXD/DMXH/DMXDH pumps. level in all directions is 6dB in each octave
band for each doubling of distance.
Page 8
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
1.8.2 Overall noise level 1.8.3 Combined noise levels for pump and
Tables side shows dBA levels for two stage and driver components
three or more stage pumps, based on the best When two or more sources produce noises that
efficiency point BEP at design RPM and required are sufficiently unrelated (so that interference
impeller diameter. effects do not occur) the total combined noise level
may be obtained by a simple addition of dB values
When the required condition flow falls outside the according to the below table.
range of 75% to 125% of BEP, a Part Load
Correction (PLC) must be added to the noise Difference between two Add to higher level to
levels as follows: levels to be Combined, Db obtain Combined level –
dB
Percent of BEP at required PLC DB 0 3
Impeller Diameter 1 2.5
74 to 62 % or 126 to 136 % +1 2 2
61 to 50 % or 137 to 150 % +2 4 1.5
49 to 38 % +3 6 1
37 to 25 % +4 9 0.5
10 0
Brake Horse Power at Best Efficiency.
dBA
Point. 1.9 Specific machine performance
2 Stage pump For performance parameters see 10.4 Customer
Data Sheet. When the contract requirement
250 to 350 87
specifies these to be incorporated into User
350 to 500 88
Instructions these are included here. Where
500 to 700 89
performance data has been supplied separately to
700 to 940 90 the purchaser these should be obtained and
940 to 1100 91 retained with these User Instructions if required.
1100 to 1300 92
1300 to 1500 93
Above 1500, contact Flowserve 94
Page 9
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
2 TRANSPORT AND STORAGE damage any auxiliary equipment and/or the paint
finish.
2.1 Consignment receipt and
2.1.3 Paint/rust preventive
unpacking Internal parts of the pump and bearing housings
Immediately after receipt of the equipment it are protected prior to shipment with a rust
must be checked against the delivery/shipping preventive such as Dasco guard 2408M. This can
documents for its completeness. Any shortage be removed with petroleum solvents.
must be reported immediately to Flowserve
and must be received in writing within one External non-machined surfaces are painted with
month of receipt of the equipment. Later one coat of applicable Flowserve grey.
claims cannot be accepted.
Parts ordered separately are protected with a rust
The shipping papers should be checked to preventive such as Dasco guard 2408M. This can
determine satisfactory arrival of any special tools, be removed with petroleum solvents.
loose parts, and/or spare parts, etc., which are
usually preserved and packed in a separate box
attached to the skid. 2.2 Handling
Boxes, crates, pallets or cartons may be unloaded
Each product has a unique serial number. Checks using forklift vehicles or slings dependent on their
that this number corresponds with that advised size and construction.
and always reference the serial number in
correspondence as well as when ordering spare 2.3 Lifting
parts or further accessories.
Page 10
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 11
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
guard against the possibility of seal leakage. When All equipment must be placed upon skids or blocks
reinstalling the seal, new “o” rings and gaskets to prevent contact with the ground and surface
must be used. contaminants. Equipment must be adequately
supported to prevent distortion and bending.
2.4.1 Pump inspection upon arrival
When the pump is received, it should be inspected 2.4.3.1 Rotor storage
for damage or other signs of rough handling. Any It is recommended that pump rotor be stored in the
damage if found should be reported to the carrier pump. Rotors that cannot be stored in the pump
immediately. must be supported close to impeller to eliminate
sag that may cause rotor to take a permanent set.
Inspect the preservative coating on the various Rotors may also be stored vertically.
parts. If necessary, renew the preservative in
areas where it has rubbed off or scraped. 2.4.3.2 Customer inspection
The stored equipment is to be placed on a periodic
Inspect all painted surfaces. If necessary, touch up inspection schedule by the customer.
the areas where paint has been chipped or
scraped.
The responsibility for setting up an
Inspect all covers over pump openings and piping inspection and maintenance schedule rests with
connections. If covers or seals for the covers are the customer and will be dependent upon the
damaged or loose, they are to be removed, and a class/type of storage provided. It will be expected
visual inspection made of the accessible interior that initially inspection would occur weekly, then
areas for accumulation of foreign materials or depending upon the inspection reports being
water. If necessary, clean and re-coat the interior favorable or unfavorable, inspection would
parts with preservative to restore the parts to the continue weekly, monthly, or quarterly, as may be
“as shipped” condition. Install or replace covers determined. Inspection reports must be kept on
and fasten secure. file.
b) The expenses involved in restoring the c) Pump coverings, plastics or tarps, are firmly in
equipment at time of operation will be place. Any holes or tears must be repaired to
proportionate to the class/type of storage prevent entrance of dirt or water.
provided.
d) Pump covers are periodically removed from
2.4.3 Storage preferred (dry) openings and interior accessible areas
If at all possible, the pump and its components inspected. If surface rusting has occurred,
should be stored indoors where they will be clean and repaint or re-coat with preservative.
protected from the elements. If it is not possible to
store the pump and its components indoors, e) If rusting occurs on exterior surfaces, clean
precautions must be taken to protect them from and repaint or re-coat with preservative.
the elements. Regardless of whether storage is
inside or outside, the storage area should be f) Loosen casing drain plugs to allow seepage of
vibration-free. All boxes that are marked for inside any accumulated moisture.
storage must be stored indoors. Coverings of
heavy gauge plastic sheets, canvas, waterproof g) Rotate pump rotor 1-1/4 revolutions at least
burlap or other suitable coverings should protect once a month to prevent rotor from taking a
the pump and its components from dirt, dust, rain, permanent set.
snow or other unfavorable conditions when stored
outdoors.
Make sure bearings have adequate
lubrication before turning rotor.
Page 12
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 13
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 14
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
3.1 Configurations
The DMX can have the following configurations:
3.3.2 Impellers
The series’ impellers are single suction, enclosed
type, and one-piece construction and are
dynamically balanced. They are fitted with
renewable impeller rings (front and back), which
are held in place by headless set- screws.
Page 15
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
3.3.9 Shaft
The high strength shaft is ground over its entire
length to close tolerances. The shaft is designed to
transmit the required power without vibration and
is stepped at each impeller fit for ease of assembly
and disassembly.
3.3.10 Bearings
The plain and thrust ball bearings are lubricated by
means of oil rings, which run on journal sleeves
and in the oil reservoir of the bearing housings.
Page 16
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
The installation/commissioning of this 24-Hour Test, MBT Test Method for Grout
equipment must be conducted in accordance with Performance
API Recommended Practices 686/PIP REIE 686 -
First Edition. Refer to API 610 - Eighth Edition -
Appendix `L` for baseplate grouting requirements. Minimum requirements for epoxy grout
(typical properties at 23oC (73oF))
Copies of API Recommended ‘Practices’ 686/PIP
REIE 686 - First Edition may be obtained from ASTM D-635, Fire Resistant
Page 17
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
d) Alignment Shaft/Coupling.
Page 18
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
These wedges should be about 102 mm (4 in.) to grouting, to insure the proper installation of all
152 mm (6 in.) long by 51 mm (2 in.) to 76 mm (3 grouting.
in.) wide and thick enough to allow for 32 mm (1-
1/4 in.) of grout under the edge of the baseplate. Build a dam around the foundation. It is a matter of
Place wedges as shown in sketch. personal preference whether the leveling wedges
under the baseplate should be removed after
grouting. If you do want to remove the wedges,
carefully mark their locations before pouring grout.
4.3 Grouting
Do not vibrate baseplate when grouting;
make sure baseplate is vented properly and all
The following information regarding areas indicated on General Arrangement drawing
grouting is only offered as a general guideline. are thoroughly filled with grout to prevent any
Flowserve requires that all grouting be installed in resonant problems.
accordance with specifications set forth in Chapter When the grout is thoroughly hardened, remove
5, Mounting Plate Grouting from API the dam and wedges, if desired, filling in the holes
Recommended Practices 686/PIP REIE 686, First they leave with grout.
Edition. It is recommended that the customer
consult a competent specialist skilled in the field of
Page 19
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 20
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
impractical to move the driver; therefore, the pump locations as in Step 2. Record on alignment
may have to be moved. data sheet - sheet 1, part 1 in the 90° Column
in the alignment data sheet in Alignment data
4.4.3.2 Measure angular misalignment sheet horizontal pumps.
Refer to alignment data sheet and examples.
d) Repeat Step 3 until measurements have been
taken at the four positions (0°, 90°, 180°,
Pump shaft should not be rotated 270°).
more than necessary when aligning shafts.
Damage could occur to internal wearing parts, e) Rotate both shafts to the starting position (12
which are lubricated by the pump liquid. o’clock markings at top center) and recheck
dimension recorded in Step 2.
The angular misalignment can best be determined
by the use of a hand-held inside micrometer, f) For 0°, 90°, 180°, 270° Columns, subtract the
marked “B” on sketch. All measurements should bottom from the top and left from right. Record
be taken at the same radial distance from the shaft in their respective blocks on Data Sheet.
centerline, as close as possible to the hub outside Watch sign notations.
diameter. The location of these measurements is
defined as the “D” dimension on the alignment g) Total the different numbers (reading across),
data sheet in Alignment data sheet horizontal divide by 4 and record the average_____.
pumps. Do not move the shafts axially while Record in “Open At _____” the shaft relative
rotating the shafts and taking measurements. Both angular position.
hubs must be rotated together to cancel possible
hub face runout. The relative measurement (top
minus bottom, right minus left) is the important The inside faces of the driver and pump
number. half hubs must be parallel within 0.0254 mm
(0.001 in.).
a) Mark both coupling hubs at 3,6,9 and 12
o’clock positions so they can be rotated 4.4.3.3 Measure offset misalignment
together and at 90° intervals. Offset misalignment is measured using a dial
indicator on the outside diameter of the coupling
hubs and rotating the hubs together to cancel rim
surface inaccuracies.
c) Rotate both shafts 90° in the direction of pump e) Rotate both shafts to the starting position (12
rotation. Measure gap dimensions at the four o’clock markings at top center) and verify
indicator returns to zero.
Page 21
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
The outside diameters of pump and e) Total the move requirements (watch move
driver coupling hubs must be aligned within 0.0762 direction). This will yield the required
mm (0.003 in.) TIR. horizontal move (right or left) and the vertical
move (raise or lower) required at each
4.4.3.4 Movement calculations mounting foot.
a) Sketch the relative driver shaft position in the
side and top views. These sketches will assist 4.4.4 Horizontal move
visualizing the required equipment move. The dial indicators shown below are required to
accurately measure the move in the horizontal
b) Alignment depends upon the relationship direction. Move the driver by bumping with soft
between D, L1 and L0. hammer/mallet or using the jack-screws (if
provided). The amount of horizontal relocation
Use the formula G X L to determine the required required is the total of the horizontal move
move. D calculation (bottom of Sheet 2 in Alignment data
sheet horizontal pumps).
D = Diameter of the circle at which
angular misalignment readings were taken (not
coupling diameter).
Page 22
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
The shims between the motor feet and mounting 4.4.8 Laser alignment
surface should be clean and dry. This is especially The use of laser alignment greatly simplifies the
critical for equipment that has been in service for alignment process. Because of equipment and
some time and need to be realigned. Water, dirt software differences, this will only describe laser
and rust may change the height of the shim pack alignment in general steps.
over a period of time. Shims should be made large a) Prior to alignment process the baseplate must
enough to support the weight of the motor on its be leveled.
mounting foot. Do not use many thin shims, as this
may result in a spongy mounting. b) Check for soft foot condition. Uneven base
height, dirty or corroded ft or other
irregularities
Page 23
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
coupling end of pump. The units that come under a) Fully torque the hold-down bolts in the driver
this classification must have the pump supports or end of pumps feet to torque values listed in the
feet dowelled to the baseplate at the coupling end. instruction manual (refer to pump sectional
This maintains the coupling gap at the desired drawing in section 8).
amount.
b) Install the dowel pins in the pump drive end
The pump feet at the opposite end are held from foot by reaming the foot and the baseplate for
moving vertically by the use of a self-locking nut. the tapered dowel provided.
The clearance between the base of the nut and
the top of the pump foot should be 0.051 mm c) Position the gib blocks to obtain a 0.25 mm
(0.002 in.). (0.010 in) clearance between the gib block and
the side of the non-drive end pump foot as
A “Gib Block” running parallel to the length of the noted on the attached figure. Drill and tap the
pump at each of the outboard feet controls the cap screw holes for the gib blocks.
horizontal movement. The "Gib Blocks" are bolted
and doweled to the baseplate at the time of
mounting at the factory. A 0.254 mm (0.010 in.)
gap is maintained between the "Gib Block" and
pump foot.
4.4.10 Gib block installation for hot Do not attempt any maintenance,
applications inspection, repair or cleaning in the vicinity of
Gib blocks are installed to control the direction of rotating equipment. Such action could result in
the growth while maintaining pump-driver coupling injury to operating personnel.
alignment. They are installed after baseplate has
been leveled and grouted, suction and discharge
piping connected, and final shaft coupling Before attempting any inspection or
alignment is completed. repair on the pump the driver controls must be
in the "off" position, locked and tagged to
Gib blocks are shipped loose and field installed at prevent restarting equipment and injury to
the site. The following procedure must be followed personnel performing service on the pump
for correct installation of gib blocks.
Page 24
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
PUMP TEMPERTURE
Open At
BOTTOM
Average
DIFF. (T-B)
HORIZONTAL
DIFF. (R-L)
* Right and Left side are determined when viewing the driver hub from the pump
OFFSET
ALIGNMENT
CHECK
BOTTOM
Driver Coupling Is (Circle Correct One):
VIEW OF DRIVER HALF COUPLING High Or Low And Right Or Left
HUB VIEWED FROM PUMP
Page 25
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
TOP
(FIXED) PUMP
BOTTOM AXIS
GV X L 1
Driver Inboard Pedestal Shift = ⎯⎯⎯⎯ = =
D
GVX L0
Driver outboard Pedestal Shift = ⎯⎯⎯⎯ = =
D
INBOARD DRIVER PEDESTAL SHIFT OUTBOARD DRIVER PEDESTAL SHIFT
OFFSET MOVE
ANGULAR MOVE
TOTAL
GΗX L1
Driver Inboard Pedestal Shift = ⎯⎯⎯⎯ = =
D
GHX Lο
Driver Outboard Pedestal Shift = ⎯⎯⎯⎯ = =
D
OFFSET MOVE
ANGULAR MOVE
TOTAL
SHEET 2 OF 2
Page 26
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
4.4.13 Example
ALIGNMENT DATA SHEET HORIZONTAL PUMPS SHEET 1 OF 2
TOP 375 378 370 391 VERTICAL ANGULAR MOVE CALCULATION MOVE DRIVER TO CORRECT ALIGNMENT
Open At BOTTOM
BOTTOM 377 382 376 395 G V X L1 .004X10 .004
DIFF. (T-B) -2 -4 -6 -4 -16 Average 4 Driver Inboard Pedestal Shift = ⎯⎯⎯⎯ =⎯⎯⎯⎯ = ⎯⎯⎯
D 10
*RIGHT SIDE 375 380 371 390 GVX L0 .004X55 .022
Driver outboard Pedestal Shift = ⎯⎯⎯⎯ = ⎯⎯⎯⎯ = ⎯⎯⎯
*LEFT SIDE 370 381 374 395 Open At LEFT D 10
INBOARD DRIVER PEDESTAL OUTBOARD DRIVER PEDESTAL
DIFF. (R-ο) -3 -1 -3 -5 -12 Average 3 SHIFT SHIFT
MILS DIRECTION MILS DIRECTION
* Right and Left side are determined when viewing the driver hub from the pump
PART 2 OFFSET ALIGNMENT CHECK OFFSET MOVE .005 RAISE .005 RAISE
ANGULAR
INDICATE 0.000 TOP RULES TO APPLY TO THE RESULTS BELOW: .004 LOWER .022 LOWER
MOVE
BY ARROW
DIRECTION OF When Indicator Mounted On The Driver Reads TOTAL .001 RAISE .017 LOWER
ROTATION
Negative = Driver Coupling Is High & Left HORIZONTAL ANGULAR MOVE CALCULATION MOVE DRIVER TO CORRECT ALIGNMENT
OFF SET
-0.003 ALIGNMENT +0.013 Positive = Driver Coupling Is Low & Right GΗX L1 .003X10 .003
CHECK Driver Inboard Pedestal Shift = ⎯⎯⎯⎯ = ⎯⎯⎯⎯ = ⎯⎯⎯
LEFT SIDE RIGHT SIDE D 10
Driver Coupling Is (Circle Correct One): GHX Lο .005X55 .016
Driver Outboard Pedestal Shift = ⎯⎯⎯⎯ = = ⎯⎯⎯
High Or Low And Right Or Left D 10
+0.016 BOTTOM INBOARD DRIVER PEDESTAL OUTBOARD DRIVER PEDESTAL
SHIFT SHIFT
Vertical Offset Bottom – Top 10 – 0 10 +5 MILS DIRECTION MILS DIRECTION
Misalignment = ⎯⎯⎯⎯⎯⎯ =⎯⎯⎯⎯ =⎯⎯⎯⎯⎯ =⎯⎯⎯⎯⎯ OFFSET MOVE .008 LEFT .008 LEFT
2 2 2 ANGULAR
Horizontal Offset Right – Left 13 – (-3) 16 +8 .003 LEFT .016 LEFT
MOVE
Misalignment = ⎯⎯⎯⎯⎯⎯ =⎯⎯⎯⎯ =⎯⎯⎯⎯⎯ =⎯⎯⎯⎯⎯
2 2 2 TOTAL .011 LEFT .024 LEFT
Page 27
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
4.5 Piping
Keep the suction pipe short and direct. Use a suction
pipe equal to or one size larger than the pump
The following information regarding suction nozzle. Keep the suction pipe free of all air
piping is only offered as a general guideline to the pockets.
customer. Flowserve requires that all piping and
related systems be designed/installed in accordance
with specifications set forth in Chapter 6, Piping from A spool piece should be installed in suction
API recommended practices 686/PIP REIE 686, First line so that the suction screen may be installed and
Edition. removed.
Page 28
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
that will totally prevent such binding; however, we At all times when using suction strainers, it is critical
strongly suggest that systems be cleaned and that the pressure drop across the strainer be
thoroughly flushed prior to connecting the pump to constantly monitored to ensure that the pump
the piping to minimize particles entering the pump. suction pressure does not fall below that required to
Starting and stopping of the pump should be prevent pump cavitation. Pressure (or vacuum)
MINIMIZED, as pumps are most susceptible to dirt gauges should be installed on both sides of the
during starts and stops. strainer so that the pressure drop across the strainer
can be monitored. During start-up of the system, the
In the event that binding on coastdown occurs, it is gauges should be monitored continuously. Consult
unlikely that the binding can be remedied by hand the plant engineer or system designer for the
rolling the rotor, and partial disassembly may be allowable pressure differential across the strainer
required to clean the affected parts. It should be prior to operating the pump. Pressure differential
noted that increased particle concentrations increase across the strainer and/or screen is typically no more
the probability of coastdown binding and seizures, as than 2 – 3 Psig. An increase in the differential
well as erosion damage. pressure between the two gauges indicates that the
strainer or screen is becoming clogged with dirt and
scale. Before the pressure drop becomes so severe
Excessive force used to try to free a that cavitation occurs, the pump should be shut
bound rotor may cause damage beyond minor clean- down and the strainer cleaned. Alarm settings to
up and repair of rotor parts. protect the pump from damaging cavitation and loss
of suction need to be supplied by the plant engineer
or system designer prior to operating the pump.
Generally, a pump should not be installed without
Typical alarm settings to protect the pump from
start-up strainer protection. The suction piping
damaging cavitation and loss of suction would be 5
should be thoroughly flushed before installing the
Psig differential pressures across the strainer
suction strainer and connecting the suction piping to
(screen). The suction piping should be arranged
the pump. The strainer should be installed in the
such that the ultimate strainer configuration
inlet piping near the pump, making certain that it is
(location) allows ready access for cleaning.
located where it may be readily serviced (cleaned).
Be sure, however, that the installed strainer will not
distort the flow to the pump suction nozzle. The strainer may be fitted with a finer screen to filter
the inlet flow. When this is done, 40 mesh screens
is typically used for start-up operation, at reduced
Do not install the strainer directly on the pump
flow rates. For final operation in a closed system,
suction nozzle. For a cone-type strainer, the down-
the suction strainers are normally removed after the
stream end of the cone should be no closer than four
system is cleaned. For critical pump applications,
(4) pipe diameters from the pump suction nozzle.
where continuous screening of suction flow is
Basket-type strainers typically introduce greater flow
desirable, and in open systems, 20-mesh screening
disturbances and should be installed at least six (6)
is typically used for permanent strainers. At all
pipe diameters from the pump suction nozzle.
times, when using screens and suction strainers, it is
critical that pressure drop across the screen and/or
The Flowserve standard for suction strainers strainer be constantly monitored to ensure that the
consists of conical-shaped steel plate with 1/8 in. pump suction pressure does not fall below that
perforations see the below picture. The open area of required to prevent cavitation.
the strainer should be a minimum of three times the
area of the pump suction.
When dirt and scale have been removed from the
system, as indicated by no further change in
pressure drop across the strainer with time, the start-
up strainer may be removed or the screen may be
replaced with one having larger openings. If a
permanent strainer will be used during normal
operation, the pressure differential needs to be
monitored on a continuous basis.
Page 29
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 30
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 31
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 32
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
In a majority of instances, ISO 68 (nominally equivalent to SAE 20 turbine type oil) will meet the above
specifications.
Page 33
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 34
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Do not wipe down in the vicinity of rotating a) Check suction and discharge pressure gauges.
parts, if unusual noise or vibrations occur,
secure the pump as soon as possible. b) Check pressure gauges on each side of suction
strainer.
The unit must not be operated unless c) Check for excessive leakage at Seal chamber
coupling guard is bolted in place. Failure to gland area. There should be no visible leakage
observe this could result in injury to operating to the naked eye.
personnel.
d) Check for unusual noises.
When pump is equipped with manifolded e) Check oil rings to ensure they are rotating
vent and drain lines, each line must be equipped
with an individual valve to prevent any liquid
from a high pressure line flowing into a low Eye protection required to perform this
pressure line. These valves must be kept in the action.
closed position during pump operation.
f) Check oil level in pump bearing housings.
Observe extreme caution when venting g) Check for adequate flow of cooling liquids.
and/or draining hazardous liquids. Wear
protective clothing in the presence of caustic, h) After unit has been operated a sufficient length
corrosive, volatile, flammable, or hot liquids. Do of time to reach normal operating temperature
not breathe toxic vapors. Do not allow sparking, and condition, the unit is to be shut down and a
flames, or hot surfacing in vicinity of the “hot” coupling alignment check must be made.
equipment. Refer to shaft /coupling alignment procedure.
The pump should not be operated Operation of the unit without appropriate
below the speed of 1500 RPM. lubrication can result in overheating of the
bearings, bearing failures, pump seizures and
a) Never operate the pump with suction valve actual breakdown of the equipment, exposing
closed. operating personnel to injury.
b) Never operate pump unless it is filled with liquid 5.9 Stopping and shutdown
and vented. a) If motor driven, de-energize driver circuit. If
turbine driven, stop turbine-driven pumps by
c) Never operate the pump unless a liquid source manually tripping the overspeed trip.
is available.
b) The pump should be shut down rapidly to protect
5.8.1 Operating checks the internal wearing parts, which are lubricated
by the liquid being pumped.
Page 35
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
c) Close the pump suction and discharge valve. The head of liquid necessary to force the required
flow into the pump is called the Net Positive Suction
d) Close valve in bypass line. Head. This value, more commonly called NPSH, is
measured above the vapor pressure of the liquid at
5.10 Hydraulic, mechanical and the pumping temperature.
electrical duty
These pumps are furnished for a particular service There are two kinds of NPSH: The NPSH required
condition. Changes in the operating system design by the pump, as shown on the pump curve, is the
may affect the pump’s performance adversely. This head needed to cover the losses in the pump
is especially true if the changes reduce the pressure suction. The second NPSH is that available in the
at the suction flange or if the liquid temperature is system, taking into account the friction loss in
increased. In case of doubt, contact the nearest suction piping, valves, fittings etc. In all cases the
Flowserve office. NPSH Available (measured above vapor pressure)
must exceed the NPSH Required in order to push
5.10.1 Specific gravity (SG) the liquid into the pump.
The capacity and total head in m (ft) of liquid
developed by a centrifugal pump are fixed for every Failure to have an adequate margin of NPSH
point on the curve and are always the same speed. available over NPSH required will cause a reduction
Neither capacity nor total head will be affected by a of pump performance and internal damage to the
change in the specific gravity of the liquid pumped. pump.
However, since the developed pressure in bar (psi)
and the brake Horse Power to drive the pump are a
function of the specific gravity of the liquid, both will
be affected in direct proportion by any change in
specific gravity. Therefore, a change in specific
gravity will affect the discharge gauge pressure. Any
changes should be noted, in that they may overload
the pump’s driver.
5.10.2 Viscosity
The pump is designed to deliver rated capacity at
rated head for a liquid with a particular viscosity.
Page 36
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
6 MAINTENANCE
When pump is handling "hot" liquid,
Your pump is a precision machine. Take every
extreme care must be taken to ensure safety of
precaution to avoid damage or slight burrs to the
personnel when attempting to drain pump. Hot
shaft bearing areas, as well as any other ground,
pumps must be allowed to cool before draining.
finished surface when dismantling your pump.
• If handling caustic liquids.
It should be understood that the information
contained in this manual does not relieve operating
When pump is handling "caustic" liquid,
and maintenance personnel of the responsibility of
extreme care must be taken to ensure safety of
exercising normal good judgment in operation and
personnel when attempting to drain pump.
care of the pump and its components.
Protective devices of suitable protective
materials must be worn when draining pump.
Before performing any disassembly, maintenance
and/or inspection on the unit, the following steps
• If on vacuum service.
should be taken and warnings observed.
Before attempting any maintenance work
a) Tag driver controls in the "off" position. on pumps in vacuum service, pumps must be
isolated from suction and discharge system then
carefully vented to return pressure in pump
Before attempting any inspection or repair
casing to atmospheric pressure.
on the pump, the driver controls must be in the
"off" position, locked and tagged to prevent
injury to personnel performing service on the 6.1 Maintenance schedule
pump.
Although your Flowserve pump has been designed
b) Isolating Pump for extended, trouble-free service, certain preventive
maintenance measures should be performed on a
regular basis to ensure optimum performance. A
Before attempting to disassemble pump, well-planned program of routine maintenance is the
pump must be isolated from system, by closing best assurance of dependable operation. The
suction and discharge system valves, drained of following preventive maintenance (PM) inspections
liquid and cooled, if pump is handling hot liquid. are suggested as a minimum, and may be
supplemented by the experience of the operating
c) Draining pump. personnel.
Page 37
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 38
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
g) Loosen and remove bearing locknut [3712] and h) Remove ball bearing [3011] using a puller that
lock-washer. will bring pressure against the inner bearing race
only.
h) Remove journal sleeve [2400]
i) Remove pump-side bearing end cover [3260]
and flinger [2540] from shaft.
Page 39
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Do not use cold chisel when bearing lining e) Remove channel rings [1500] from impeller back
supports shaft ring at each impeller. Channel rings are
horizontally split and are held together by
6.6.5 Removal of seal chamber parts shoulder screws and dowel pins.
To remove mechanical seal from pump:
a) Install setting plates/eccentric washer in place. Channel rings are precision machined as a
set, after being dowelled. They should be match
b) Loosen drive collar. marked and numbered for reassembly purposes. It is
suggested that the two halves be placed back
c) Remove gland bolting. together immediately.
d) Slide mechanical seal from shaft. f) Remove center bushing [1600] from center
(back to back) impellers. Center bushing is
Seal may be disassembled/inspected/reassembled horizontally split and held together by socket
per seal manufacturer’s drawing and instructions in head cap-screws [6570] and grooved pins
section 8 of this manual. [6812].
Page 40
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 41
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
on the ring to casing fit will help to fit the ring to the 6.8 Assembly of pump and seal
casing. When reassembling pump, all fasteners must be
tightened to the proper torque values. Refer to
6.7.2 Dynamic-balance impeller checking sectional drawing in section 8.
Whenever an impeller is tampered with, (i.e. new
impeller, wear rings installed etc.) the impeller must 6.8.1 Rebuilding rotor
be dynamically balanced before being reassembled
to shaft.
Before upstaging or destaging a
Dynamic balance shall be performed on a suitable pump (adding or removing impellers), contact
balancing machine by trained personnel. Impellers Flowserve Customer Service department for
shall be mounted on balance mandrels with all the instructions, to avoid permanent damage to the
keyways filled. pump rotor.
Two balance planes shall be used and located a) Install center stage impeller key [6700], into key
equidistance as possible from the center of gravity of way in shaft and pre-fit split rings [2531] to shaft.
the impeller. Split rings to fit snug in groove.
Metal shall be removed from the impellers during the b) All impeller bores and shaft outside diameters
balancing operation in accordance with the attached are to be dimensionally inspected.
sketches until the impeller is within acceptable
tolerance limit of unbalance.
Impeller-to-shaft fit must be minimum
of 0.0254 mm (0.001in.) to 0.0762 mm (0.003 in.)
interference fit.
U =4 W / N or .01 oz-in which ever is greater. e) Place casing ring [1500] on impeller front ring.
U = Unbalance per plane oz-in
W = Impeller weight per plane.
Usually 1/2 the total impeller weight. Put the ring before you place the new
N = Operational rotational speed RPM stage one impeller
Remove metal by grinding the side of the shroud f) Continue to assemble remaining inboard
walls. Do not exceed the minimum wall thickness impellers [2200] per steps a, c and e.
nor remove material from one concentrated area.
g) Assemble outboard impellers [2200] per steps a,
The final wall thickness shall not vary by more than c and e.
25% of the drawing thickness. The minimum wall
thickness which results of the balancing process h) Install throttling sleeve key [6700] to shaft and
cannot exceed 75% of the drawing thickness. pre-fit split rings [2531] in shaft to fit smug in
groove. Heat the throttling sleeve and slide onto
shaft far enough to expose split ring groove.
Page 42
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
6.8.3 Installing rotor in casing k) Install upper half of channel rings [1500] and
a) The Seal Chamber bushing [4132], throttle seat shoulder screws [6570].
bushing [1630], channel rings [1500] and center
bushing [1600] should be checked to make sure l) Rig upper half casing [1210] to an overhead
they seat in both the upper and lower half casing hoist. Refer to lifting equipment section.
and that the anti-rotating pins [2923] can be
properly located in the slot on the lower half Position upper half casing over lowers half and lower
casing parting flange. carefully, making sure all rings and bushings enter
their proper fit.
b) Install main parting flange gasket [4590]. Refer
to parting flange gasket. Install main parting flange grooved pins [6812] and
seat.
c) Place lower half of the center bushing [1600] into
the lower half casing [1210], making sure the Install main parting flange washers [2905] and nuts
anti-rotation pins are properly located in the slot [6580] and torque to the recommended value.
on the lower half casing parting flange.
d) Place the lower half of all channel rings [1500] in Make sure parting flange jack-screws
lower half casing, in the same sequence as they [6570], in lower half casing, are backed out far
were removed, making sure the anti-rotation enough so as not to protrude above parting flange
pins are properly located in the slot on the lower machined surface
half casing parting flange.
6.8.4 Check rotor vertical lift
It is necessary to check and record the vertical lift of
Channel rings are precision machined the rotor within the casing.
as a set, after being dowelled. Be sure they are
reassembled as a set. a) Place a dial indicator on the upper half casing
with the indicator tip resting on the top of the
e) Place casing rings [1500], throttle bushing [1630] shaft. Zero the indicator.
and Seal chamber bushings [4132] in their
proper positions on pump rotor. b) Using a bar and a block of wood under the shaft,
lift the shaft and record the movement. Take
f) Rig rotor [2000] to an overhead hoist. Refer to measurements at both ends of the pump.
lifting equipment section of this manual.
c) The minimum acceptable vertical movement is
g) Position rotor over lower half casing and position the minimum back ring clearance on the suction
bushings and casing rings such that the anti- end of the pump and the minimum throttling
rotation pins are facing in the up position such bushing clearance on the discharge end of the
that they can be easily rotated in the slot on the pump. For clearances, refer to the sectional
lower half casing parting flange. drawings included in section 8 of this manual.
Page 43
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
6.8.5 Check rotor axial float [6541] and bearing locknut [3712] and
a) Push the rotor toward the coupling end as far as tighten.
it will go.
e) Mark another line midway between the first two Do not set locking tab of lock-washer at
lines. This centerline represents the centering of this time. "Dummy bearing" will have to be removed
the impellers within their volutes. Masking tape
is to be left on shaft for use in centralize rotor • Carefully install bearing housing [3230] into
axially. position over the thrust ball bearing.
a) Assemble plain bearing: c) Using a dial indicator and the adjusting screws
• Assemble “Dummy Bearings” to shaft. Install [6570], adjust the horizontal and vertical position
journal sleeve [2400], bearing lock-washer
Page 44
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
of the shaft inside the seal chamber to within • If distance indicated is between 0.127 mm
0.0254 mm (0.001 in.) radially. (0.005 in.) to 0.254 mm (0.010 in.) no further
shim adjustment is required.
d) Repeat step c on thrust end, then recheck plain • If distance indicated is above 0.254 mm
end. Pump shaft should turn free with no (0.010 in.) remove inboard end cover [3260]
indication of binding or rubbing. This should be and remove amount of shims [3126], which
taken into account when making adjustments. will reduce axial end-play to 0.127 mm
(0.005 in.) to 0.254 mm (0.010 in.)
e) If rubs occur, adjust the rotor upwards in 0.025 • If distance indicated is below 0.127mm
mm (0.001 in.) increments. Check alignment at (0.005 in.), remove inboard end cover [3260]
both ends after each movement. After and add shims [3126], which will increase
adjustment, check for rubs. axial end-play to 0.127 mm (0.005 in.) to
0.254 mm (0.010 in.) (Shims may be cut for
f) When vertical and horizontal alignment is ease of assembly)
obtained, tighten bearing housing bolting-except
the two top bolts at the adjusting screws. Ream 6.8.9 Final plain bearing assembly
the dowel holes and install dowel pins [6810]. a) If pump is installed with mechanical seal, install
Loosen adjusting screws and tighten the two top completely assembled mechanical seals [4200]
bearing housing bolts. to shaft. Insert into seal chamber.
c) Push rotor outboard to ensure contact between d) Heat plain bearing [3011] and install on shaft
thrust ball bearing [3013] and bearing housing
[3230]. e) Install journal sleeve [2400], bearing lock-washer
[6541] and bearing locknut [3712] and tighten.
d) Read the distance the shaft moved on the dial
indicator. This is the amount of shims [3126] to f) Set locking tab of lock-washer.
be installed between thrust ball bearing [3013]
and shaft. g) Assemble bearing housing [3230] into position
over the plain ball bearing. Install dowel pins
6.8.8 Set thrust bearing end-play [6810] and snug down cap-screws
Page 45
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
b) Position plain bearing flingers [2540] h) Apply a layer of liquid gasket to the machined
approximately 1.02 mm (0.040 in) from end covers surface of end cover [3266]. Install end cover
and tighten set-screws [6570]. with cap-screws [6570]. Tighten to proper torque
value.
c) Remove thrust bearing housing [3230] from
pump. 6.8.12 Final assembly
a) Position bearing flingers [2540] approximately
d) Remove bearing locknut [3712], bearing lock- 1.02 mm (0.040 in.) away from end covers and
washer [6541], journal sleeve [2400] and "Dummy tightens the set-screws [6570]
Bearing" from pump shaft.
b) Using a strap wrench, rotate pump shaft to be
e) Remove tape from shaft at Seal chamber area sure rotor is properly aligned and does not bind.
and install thrust bearing and mechanical seal
[4200]. Tighten nuts [6580] of both mechanical seals Do not rotate pump shaft excessively.
per seal chamber section. Internal parts depend on the liquid being pumped for
lubrication
Do not tighten lock collar set-screws c) Install coupling key, pump half coupling,
at this time. coupling nut and set coupling nut set-screws.
(Refer to coupling removal section).
6.8.11 Final thrust bearing assembly
a) Position flinger [2540], end cover [3260], "O" ring d) Check coupling/shaft alignment as described
[4610] and end cover shims [3126] in their under shaft/coupling alignment and assemble
approximate position on pump shaft. coupling.
b) Install shaft shims [3126]. Make sure shims are e) Install coupling guard.
correctly seated against shaft shoulder.
f) Replace all auxiliary piping, instrumentation and
c) Heat thrust ball bearing [3013] and install on the pipe plugs.
shaft in the back-to-back position (stamping will g) Fill bearing housing oil reservoir. Refer to Pump
be face to face) as shown in sketch installing the lubricants section instructions.
bearings on the shaft.
h) Refer to Running or operation section for starting
procedure.
6.8.13 Parting flange gasket
a) Using proper recommended 0.397 mm (1/64 in.)
thick gasket material, locate and cut stud holes,
using upper half casing as a template.
Page 46
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 47
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 48
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
FAULT SYMPTOM
P u m p o v e r h e a ts a n d s e i z e s
⇓ Bearings have short life
⇓ Pump vibrates or is noisy
⇓ P u m p l o s e s p r i m e a ft e r s ta r t i n g
⇓ I n s u f f i c i e n t c a pa c i t y d e l i v e r e d
A. System troubles
z z Pump not primed.
Check complete filling. Vent and/or prime.
z z z z Pump or suction pipe not completely filled with
liquid.
z z z z Suction lift too high or level too low.
Check NPSHa>NPSHr, proper submergence,
z z z z Insufficient margin between suction pressure and losses at strainers/fittings.
vapor pressure.
z z z Excessive amount of air or gas in liquid. Check and purge pipes and system.
z z z Air or vapor pocket in suction line. Check suction line design for vapor pockets.
z z Air leaks into suction line. Check suction pipe is airtight.
z z Air leaks into pump through mechanical seal, Check and replace faulty parts.
sleeve joints, casing joint or pipe plugs. CONSULT FLOWSERVE.
z z z z Inlet of suction pipe insufficiently submerged. Check out system design.
z z z Speed too low. CONSULT FLOWSERVE.
z Speed too high. CONSULT FLOWSERVE.
z z Operation at very low capacity. Measure value and check minimum permitted.
Remedy or CONSULT FLOWSERVE.
z z z Suction pressure too low, Foreign material in Open suction valve, Check power supply to correct
suction line voltage, Dismantle suction line remove foreign
material
B. Mechanical troubles
z z z z z z Misalignment due to pipe strain. Check the flange connections and eliminate strains
using elastic couplings or a method permitted.
z z z z z z Misalignment due to improper pump/driver setup Check alignment and correct as necessary
Page 49
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
FAULT SYMPTOM
P u m p o v e r h e a ts a n d s e i z e s
⇓ Bearings have short life
⇓ Pump vibrates or is noisy
⇓ P u m p l o s e s p r i m e a ft e r s ta r t i n g
⇓ I n s u f f i c i e n t c a pa c i t y d e l i v e r e d
z z z z z Shaft bent (excessive runout) Check shaft runouts are within acceptable values.
CONSULT FLOWSERVE.
z z z z Rotating part rubbing on stationary part internally. Check and CONSULT FLOWSERVE, if necessary.
z z z z z Bearings worn Replace bearings.
z z z Wearing ring surfaces worn. Replace worn wear ring/surfaces.
z z z Mechanical seal improperly installed. Check alignment of faces or damaged parts and
assembly method used. Refer to mechanical seal
instructions
z z z z z Shaft running off centre because of worn bearings Check misalignment and correct if necessary. If
or misalignment. alignment satisfactory check bearings for excessive
wear.
z z z z z Impeller out of balance resulting in vibration.
z z z Abrasive solids in liquid pumped. Check and CONSULT FLOWSERVE.
z z Mechanical seal was run dry. Check mechanical seal condition and source of dry
running and repair.
z z z Excessive thrust caused by a mechanical failure Check wear condition of impeller, its clearances and
inside the pump. liquid passages.
z z Lack of lubrication for bearings. Check hours run since last change of lubricant,
Check oil level and add if necessary
z z Improper installation of bearings (damage during Check method of assembly, possible damage or
assembly, incorrect assembly, wrong type of state of cleanliness during assembly and type of
bearing etc). bearing used. Remedy or CONSULT
FLOWSERVE, if necessary.
z z Damaged bearings due to contamination. Check contamination source and replace damaged
bearings.
Page 50
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 51
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 52
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 53
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 54
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 55
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Page 56
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
9 CERTIFICATION Reference 5:
Certificates, determined from the contract ANSI B31.3 - Process Piping.
requirements will be provided with this manual.
Examples are certificates for CE marking and
ATEX marking. If required, copies of other
certificates sent separately to the Purchaser
should be obtained from Purchaser for retention
with the User Instructions. See section Noise
level, for details of typical noise certification.
10 OTHER RELEVANT
DOCUMENTATION AND MANUALS
Reference 2:
Pumping Manual, 9th edition, T.C. Dickenson,
Elsevier Advanced Technology, United Kingdom,
1995.
Reference 3:
Pump Handbook, 2nd edition, Igor J. Karassik et al,
McGraw-Hill Inc., New York, 1993.
Reference 4:
ANSI/HI 1.1-1.5
Centrifugal Pumps - Nomenclature, Definitions,
Application and Operation.
Page 57
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
Total Head:
Total weight:
Page 58
DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH
®
FLOWSERVE
REGIONAL SALES OFFICES:
Flowserve Corporation
2300 E Vernon Ave
Vernon, CA 90058
Page 59