You are on page 1of 2

JADWAL TRAINING TAHUN 2019 di JAKARTA

BKI ACADEMY - PT. BIRO KLASIFIKASI INDONESIA (Persero)

INVESTASI BULAN
NO. PROGRAM TRAINING DURASI
BASIC PROFESSIONAL BUSINESS JAN FEB MAR APR MEI JUN JUL AUG SEP OKT NOV DES
I KATEGORI MARITIM
A BIDANG SAFETY
1 Internal Auditor ISM Code 7,150,000 8,717,500 9,790,000 3 Hari 9-11 13-15 12-14 11-13 6-8
2 Designated Person Ashore ISM Code 7,700,000 9,267,500 10,340,000 3 Hari 13-15 10-12 10-12 9-11 11-13
3 Risk Assessment ISM Code 6,600,000 8,167,500 9,240,000 3 Hari 8-10 7-9 13-15
4 Marine Accident & Investigation 6,600,000 8,167,500 9,240,000 3 Hari 24-26 18-20 18-20
5 IMDG Code 6,600,000 8,167,500 9,240,000 3 Hari 16-18 8-10 4-6

B BIDANG SECURITY
6 Internal Auditor ISPS Code 6,600,000 8,167,500 9,240,000 3 Hari 6-8 8-10 1-3 2-4 4-6
7 CSO ISPS Code 6,600,000 8,167,500 9,240,000 3 Hari 20-22 7-9 5-7 7-9 2-4
8 PFSO ISPS Code 7,700,000 9,267,500 10,340,000 3 Hari 10-12 21-23 19-21 21-23 16-18

C BIDANG SURVEY
9 Marine Surveyor 9,900,000 12,512,500 14,300,000 5 Hari 4-8 8-12 15-19 9-13 4-8
10 New Building Supervision 8,800,000 11,412,500 13,200,000 5 Hari 25-29 22-26 25-29

D BIDANG CREWING
11 Marine Labour Convention 2006 7,150,000 8,717,500 9,790,000 3 Hari 22-24 25-27 9-11

E BIDANG ENVIRONMENT
12 Ballast Water Management 6,600,000 8,167,500 9,240,000 3 Hari 24-26 21-23 18-20
13 Marpol Oil Outflow 6,600,000 8,167,500 9,240,000 3 Hari 12-14 12-14 13-15

F BIDANG SHIP DESIGN


14 Intact Stability Assessment 6,600,000 8,167,500 9,240,000 3 Hari 4-6 1-3 4-6
15 Ship Handling & Maneuvering 6,600,000 8,167,500 9,240,000 3 Hari 8-10 5-7 9-11
16 Damage Stabilty Assessment 6,600,000 8,167,500 9,240,000 3 Hari 11-13 10-12 7-9

G BIDANG IMO MODEL COURSE


17 6.09 Training Of Trainer (TOT) 8,800,000 14,547,500 18,480,000 8 Hari 19-30 13-23 16-26
3.24 Security Awareness Training For Port
18 2 Hari
Facility Personal with Designated Security
Duties
3.25 *)
Security Awareness Training for all
19 1 Hari
Port Facility Personnel *)
3.11 Safety Investigation Into Marine
20 7,700,000 10,312,500 12,100,000 5 Hari 25-29 22-26 25-29
Casualties & Marine Incidents
3.27 Security Awareness Training For All
21 1 Hari
Seafarers *)

II KATEGORI KESELAMATAN & KESEHATAN


A KERJA
SERTIFIKASI KEMNAKER
22 Ahli K3 Umum 8,500,000 14,770,000 19,060,000 12 Hari 1-16 11-26
23 Ahli K3 Umum Weekend 9,000,000 16,315,000 21,320,000 12 Hari 6 Jul-11 Agt 5 Okt-10 Nov
24 Ahli K3 Pesawat Angkat dan Angkut 23,000,000 36,062,500 45,000,000 25 Hari 9 Apr-3 Mei 19 Agt-12 Sep 18 Nov-12 Des
25 Ahli K3 Elevator & Escavator 16,500,000 19,112,500 20,900,000 12 Hari 24-28 21-25
26 Ahli K3 Listrik 15,000,000 21,270,000 25,560,000 12 Hari 6-17 2-13
27 Ahli K3 Pesawat Uap & Bejana Tekan 23,000,000 36,062,500 45,000,000 25 Hari 17 Jun-11 Jul 14 Okt-7 Nov
28 Ahli K3 Pesawat Uap & Tangki Timbun 23,000,000 36,062,500 45,000,000 25 Hari 1-25 11 Nov-4 Des
29 Ahli K3 Pesawat Tenaga Produksi 23,000,000 36,062,500 45,000,000 25 Hari 24 Jun-18 Jul 26 Nov-20 Des
30 Ahli K3 Kebakaran Kelas D 4,950,000 6,517,500 7,590,000 3 Hari 8-10 11-13
31 Auditor SMK 3 5,500,000 7,590,000 9,020,000 4 Hari 13-16 23-26
32 Operator K3 Forklift 4,500,000 6,067,500 7,140,000 3 Hari 22-24 26-28 16-18
33 Operator K3 Crane (Kelas I/Kelas II/Kelas 6,500,000 8,067,500 9,140,000 3 Hari 22-24 5-7 5-7
34 III)
Operator K3 Alat Berat 8,250,000 10,340,000 11,770,000 4 Hari 23-26 2-5 1-4
35 Operator K3 Rigger 4,500,000 6,067,500 7,140,000 3 Hari 9-11 11-13
36 Working at Height 7,150,000 8,717,500 9,790,000 3 Hari 14-16 8-10
37 Working at Confined Space 7,150,000 9,762,500 11,550,000 5 Hari 15-19 25-29
38 P3K di Tempat Kerja 4,950,000 6,517,500 7,590,000 3 Hari 8-10 22-24
1
B SERTIFIKASI BNSP
39 Ahli K3 Muda 5,500,000 7,590,000 9,020,000 4 Hari 26-28 23-26 29-31 28-31
40 Ahli K3 Madya 7,150,000 9,762,500 11,550,000 5 Hari 20-24 12-16 18-22
41 Ahli K3 Utama 8,250,000 10,862,500 12,650,000 5 Hari 24-28 9-13 2-6
42 Auditor SMK3 5,500,000 7,590,000 9,020,000 4 Hari 13-16 19-22
43 HAZOPS 5,500,000 7,590,000 9,020,000 4 Hari 8-11 16-19 14-17
44 Petugas K3 Laboratorium 4,950,000 6,517,500 7,590,000 3 Hari 25-27 24-26 9-11
45 Petugas P3K 4,950,000 6,517,500 7,590,000 3 Hari 21-23 7-9 13-15
46 Operator K3 Migas 6,050,000 8,140,000 9,570,000 4 Hari 6-9 20-23 27-29
47 Pengawas K3 Migas 7,425,000 10,037,500 11,825,000 5 Hari 26-28 24-28 16-20 16-20
48 Pengawas Utama K3 Migas 8,800,000 11,412,500 13,200,000 5 Hari 13-17 26-30

C SERTIFIKASI OSH ACADEMY


49 Safety Manager 7,700,000 9,790,000 11,220,000 4 Hari 1-4 15-18
50 Safety Supervisor 6,875,000 8,442,500 9,515,000 3 Hari 16-18 8-11 19-21
51 Oil & Gas Safety Operation 5,500,000 7,067,500 8,140,000 3 Hari 20-22 28-30 3-5
52 Process Safety Management 6,050,000 7,617,500 8,690,000 3 Hari 22-24 18-20
53 Behavior Based Safety (BBS) 5,500,000 7,067,500 8,140,000 3 Hari 16-18 26-28

D SERTIFIKASI BRITISH SAFETY COUNCIL


NEBOSH International General Certificate
54 1,349 1,498 2,040 18-28 1-12 19-29 21-31 02-12
in Occupational Health and Safety 11 Hari
55 IOSH Managing Safely 369 780 620 4 Hari 11-13 05-07 16-18

III KATEGORI ENERGI


A BIDANG MIGAS
56 Welding Inspector 18,700,000 32,285,000 41,580,000 28 Hari 11 Mar-12 Apr 1 Jul-1 Agt 4 Nov-4 Des
57 Inspektur Instalasi 26,400,000 30,580,000 33,440,000 8 Hari 17-18 6-8
58 Inspektur Katup Pengaman & Pemutus 17,050,000 20,185,000 22,330,000 6 Hari 22-27 21-26
59 Segel
Inspektur Bejana Tekan 17,000,000 24,315,000 29,320,000 14 hari 18-31 9-22
60 Inspektur Tangki Penimbun 17,000,000 24,315,000 29,320,000 14 hari 19-27 9-17
61 Inspektur Pesawat Angkat 18,000,000 25,315,000 30,320,000 14 Hari 22 Apr- 8 Mei 3-11 18-26
62 Inspektur Peralatan Putar/Rotating 16,000,000 21,225,000 24,800,000 10 hari 22-28 9-15 1-9
63 EquipmentPlatform
Inspektur 18,000,000 23,225,000 26,800,000 10 Hari 27 Mar-8 Apr 20-28 1-8 13-21
64 Inspektur Kelistrikan 16,000,000 20,180,000 23,040,000 8 hari 25-31 25-30 17-23 10-16
65 Inspektur Pipa Penyalur 17,000,000 24,315,000 29,320,000 14 Hari 22 Apr- 8 Mei 16-22 14-22
66 Inspektur Sistem Alat Ukur Serah Terima 17,000,000 22,225,000 25,800,000 10 Hari 17-22 10-16 17-23
67 Inspektur RIG 19,000,000 22,135,000 24,280,000 6 Hari 26-28 27-29
68 Inspektur K3 15,400,000 17,490,000 18,920,000 4 Hari 27-29 3-5 18-20
69 Inspektur Lifting Equipment 14,500,000 17,635,000 19,780,000 6 Hari
70 Sertifikasi Peralatan di Lingkungan Migas 8,800,000 10,367,500 11,440,000 3 Hari 14-16 18-20
71 Inspeksi Teknik 7,150,000 8,717,500 9,790,000 3 Hari 19-21 13-15
Inspeksi Pengelasan untuk Non Welding
72 6,600,000 8,167,500 9,240,000 3 Hari 24-26 18-19
Inspector
73 Lifting Rigging/Juru Ikat Beban 6,600,000 8,167,500 9,240,000 3 Hari 23-25 13-15 16-18
74 Risk Assessment For Offshore Installations 9,900,000 11,990,000 13,420,000 4 Hari 19-22 16-19

B BIDANG MINERBA
75 Pengawas Operasional Pertama 9,900,000 11,990,000 13,420,000 4 Hari 20-23 20-23
76 Pertambangan
Pengawas (POP) Madya
Operasional 12,100,000 15,235,000 17,380,000 5 Hari 22-26 7-11
77 Pertambangan
Pengawas (POM) Utama
Operasional 14,300,000 17,435,000 19,580,000 6 Hari 1-6 1-6 1-6
78 Pertambangan
Petugas (POU)
Pengambil Contoh Uji Batubara 8,250,000 9,295,000 10,010,000 2 Hari 1-2 10-11
79 (Sampler)
Petugas Penguji Contoh Uji Batubara 9,350,000 10,395,000 11,110,000 2 Hari 9-10 12-13
80 (Analis) Verifikasi Teknis Batubara
Petugas 9,350,000 10,395,000 11,110,000 2 Hari 19-20 24-25 20-21
81 (Surveyor)
Petugas Verifikasi Administrasi Batubara 9,350,000 10,395,000 11,110,000 2 Hari 21-22 7-8 16-17
82 (Verifikator) Tambang Terbuka Jangka
Perencanaan 16,500,000 20,157,500 22,660,000 7 Hari 13-19 14-15
83 Panjang NQF 6Tambang Terbuka Jangka
Perencanaan 11,000,000 13,090,000 14,520,000 4 Hari 15-18 16-19
84 Panjang NQF 4Tambang Terbuka Jangka
Perencanaan 13,200,000 15,812,500 17,600,000 5 Hari 8-12 8-12 11-15
85 Panjang Penambangan
Operasi NQF 5 NQF 4 18,700,000 23,925,000 27,500,000 10 Hari 18-27 5-14 2-11
86 Operasi Penambangan NQF 5 19,800,000 25,025,000 28,600,000 10 Hari 15-24 4-13
87 Geologi/Eksplorasi NQF 4 15,400,000 18,535,000 20,680,000 6 Hari 22-27 20-26
88 Geologi/Eksplorasi NQF 5 16,500,000 20,157,500 22,660,000 7 Hari 18-24 19-25 16-22
Manajemen Perawatan Peralatan Tambang
89 13,200,000 15,812,500 17,600,000 5 Hari 25-29 1-5 22-26
NQF 4

90 Manajemen Perawatan Peralatan Tambang 11,000,000 13,090,000 14,520,000 4 Hari 23-26 23-26 5-8
NQF 5 Tyre
Manajemen Perawatan Peralatan Tambang
91 11,000,000 13,090,000 14,520,000 4 Hari 19-22 6-9 10-13
NQF 5 Welding
92 Pengolahan Hasil Tambang NQF 4 16,500,000 20,157,500 22,660,000 7 Hari 8-14 12-19
93 Pengolahan Hasil Tambang NQF 5 18,700,000 23,925,000 27,500,000 10 Hari 22-31 4-13
Keselamatan dan Kesehatan Kerja
94 13,200,000 15,812,500 17,600,000 5 Hari 27-31 9-13
Tambang NQF 6

IV KATEGORI SISTEM MANAJEMEN


A BIDANG ISO SERIES
ISO 9001:2015 - Quality Management
95 4,400,000 5,967,500 7,040,000 3 Hari 7-9 20-22
System (Understanding and Implementing)
ISO 14001:2015 - Environmental
96 4,400,000 5,967,500 7,040,000 3 Hari 10-12 2-4
Management System (Understanding and
Implementing)
ISO 31000:2009 - Risk Management
97 4,400,000 5,967,500 7,040,000 3 Hari
(Understanding and Implementing)
ISO 45001:2018 - OHS Management
98 4,400,000 5,967,500 7,040,000 3 Hari 26-28 22-24 19-21
System (Preparing for Migration from
OHSAS 18001 to ISO 45001)

Note
*) Untuk In-House Training
1 Tempat Pelaksanaan Pelatihan di Graha BKI Lantai 9, Jl. Yos Sudarso No. 38 Tanjung Priok Jakarta
2 Sebelum pelaksanaan training, tanggal pada jadwal training ini dapat berubah sewaktu-waktu tanpa pemberitahuan sebelumnya
3 Biaya sudah termasuk PPN 10%
4 Biaya sudah termasuk training module (PDF Format), training kit, lunch, 2 x cofee break dan certificate
5 Untuk paket basic adalah non residential, professional adalah twin share residential dan business adalah single occupancy residential di Hotel Bintang****
6 Untuk paket professional dan business biaya termasuk antar jemput hotel ke dan dari Graha BKI termasuk breakfast dan dinner
7 Informasi lebih lanjut dapat menghubungi BKI Academy PT. Biro Klasifikasi Indonesia (Persero) Telp. 021 4393 7409, email : info@bki.academy

You might also like