You are on page 1of 2

BAR BENDING SCHEDULE FOR FOOTING AT GGMS NOMAN PURA

Cut length of Total no


S/NO Particular location NO NO of bars
bar in ft of bars

1 footing size(5*5*1.5)
footing rings
long bars bottom
2
over lap bottom
over lap top
footing rings
3 long bars bottom
long bars top
footing rings
4 long bars bottom
long bars top
short bars bottom
short bars top
long bars bottom
long bars top
over lap top
over lap bottom
R/wall+building long bars bottom in
foooting bent area #1
long bars bottom in
bent area #2
long bars top in
bent area #1
long bars top in
bent area #2
short bars bottom
short bars top
R/wall+building long bars bottom
foooting width long bars top
Average=10 over lap bottom
over lap top
5 hooks
6 hooks
ING AT GGMS NOMAN PURA
Weight Total
Total length Dia of bars
Shape per ft in weight in
of bars in (ft) in inches
lbs lbs

TOTAL WEIGHT IN Lbs


WEIGHT IN TONNE