G1, 1921, Executive, Gautam Navlakha Apartment, Near Road No. 7, Near Kagal Nagar Market, Sonari Jamshedpur-831011 E-mail- safequality2015@gmail.com , Mobile: + 91-9905833654,+91-9204869735, 7004600530 Head Office: 10 -10 -82 Near Simhagiri Hospital Sairam Nagar New Gajuwaka Ward -64, Visakhapatnam (Urban), Visakhapatnam – 530 026
Scope of Work for Rain Water Harvesting
Sl Scope of Work Remarks
no 1 Geo physical Survey using resistivity method to explore Ground Water level
2 Ground Water potential Study inclosing possible yield ( satellite method)
3 Hydrological Study( satellite method & survey of surrounding) 4 Soil , mineral, Geological , geo-morphological study 5 Rain Water Study 6 Preparation of Drawing for the Rain Water Harvesting structure 7 Water Budget preparation with respect to the Rain water Harvesting Potential 8 One Sample Index of the report is given below for ready reference 9 Presentation to the Ground Water Directorate as and when required till approval for the Rain Water Harvesting Plan
INDEX
CHAPTER DESCRIPTION PAGE
I 1-13 INTRODUCTION II CHECK LIST TO BE FILLED BY 14-19 INDUSTRIES/INSTITUTIONS APPLYING FOR CONSTRUCTION OF RAIN WATER HARVESTING STRUCTURES/RECHARGE PIT FOR RECHARGE OF GROUND WATER III TOPOGRAPHICAL SURVEY OF THE PROPOSED 20-39 1
AREA OF RWH. GEOGRAPHICAL LOCATION OF THE
Page
SITE ,SOIL, MINERAL & LAND DETAILS
SEQ -SERVICES (SAFETY ENVIRONMENT & QUALITY SERVICES) G1, 1921, Executive, Gautam Navlakha Apartment, Near Road No. 7, Near Kagal Nagar Market, Sonari Jamshedpur-831011 E-mail- safequality2015@gmail.com , Mobile: + 91-9905833654,+91-9204869735, 7004600530 Head Office: 10 -10 -82 Near Simhagiri Hospital Sairam Nagar New Gajuwaka Ward -64, Visakhapatnam (Urban), Visakhapatnam – 530 026
IV HYDROGEOLOGICAL STUDY COVERING PRE & 40-79
POST-MONSOON WATER LEVEL, WATER LEVEL TREND, FRACTURE ORIENTATION
V CLIMATE & RAIN FALL STUDY 80-83
VI GEOPHYSICAL SURVEY 84-88
VII RAINWATER HARVESTING SCHEME 89-93
ANNEX I CALCULATION AND BASIS FOR THE RAINWATER 94
HARVESTING PLAN
ANNEX II LAYOUT PLAN WITH RAIN WATER HARVESTING 95
ANNEX III MANUFACTURING PROCESS FLOW DIGRAM 96-102 ANNEX IV LIST OF BLOCKS BASED ON DYNAMIC 103 GROUNDWATER RESOURCE ASSESSMENT ANNEX V UNDERGROUND WATER LEVEL REPORT AROUND 104-107 THE COMPANY PREMISES ANNEX VI COPY OF CTO 108-110