Scope of Work for Rain Water Harvesting

Sl Scope of Work Remarks


no
1 Geo physical Survey using resistivity method to explore Ground Water level

2 Ground Water potential Study inclosing possible yield ( satellite method)


3 Hydrological Study( satellite method & survey of surrounding)
4 Soil , mineral, Geological , geo-morphological study
5 Rain Water Study
6 Preparation of Drawing for the Rain Water Harvesting structure
7 Water Budget preparation with respect to the Rain water Harvesting Potential
8
One Sample Index of the report is given below for ready reference
9 Presentation to the Ground Water Directorate as and when required till
approval for the Rain Water Harvesting Plan

INDEX

CHAPTER DESCRIPTION PAGE


I 1-13
INTRODUCTION
II CHECK LIST TO BE FILLED BY 14-19
INDUSTRIES/INSTITUTIONS APPLYING FOR
CONSTRUCTION OF RAIN WATER HARVESTING
STRUCTURES/RECHARGE PIT FOR RECHARGE OF
GROUND WATER
III TOPOGRAPHICAL SURVEY OF THE PROPOSED 20-39
1

AREA OF RWH. GEOGRAPHICAL LOCATION OF THE


Page

SITE ,SOIL, MINERAL & LAND DETAILS


SEQ -SERVICES
(SAFETY ENVIRONMENT & QUALITY SERVICES)
G1, 1921, Executive, Gautam Navlakha Apartment, Near Road No. 7,
Near Kagal Nagar Market, Sonari Jamshedpur-831011
E-mail- safequality2015@gmail.com , Mobile: + 91-9905833654,+91-9204869735, 7004600530
Head Office: 10 -10 -82 Near Simhagiri Hospital Sairam Nagar New Gajuwaka Ward -64,
Visakhapatnam (Urban), Visakhapatnam – 530 026

IV HYDROGEOLOGICAL STUDY COVERING PRE & 40-79


POST-MONSOON WATER LEVEL, WATER LEVEL
TREND, FRACTURE ORIENTATION

V CLIMATE & RAIN FALL STUDY 80-83

VI GEOPHYSICAL SURVEY 84-88

VII RAINWATER HARVESTING SCHEME 89-93

ANNEX I CALCULATION AND BASIS FOR THE RAINWATER 94


HARVESTING PLAN

ANNEX II LAYOUT PLAN WITH RAIN WATER HARVESTING 95


ANNEX III MANUFACTURING PROCESS FLOW DIGRAM 96-102
ANNEX IV LIST OF BLOCKS BASED ON DYNAMIC 103
GROUNDWATER RESOURCE ASSESSMENT
ANNEX V UNDERGROUND WATER LEVEL REPORT AROUND 104-107
THE COMPANY PREMISES
ANNEX VI COPY OF CTO 108-110