You are on page 1of 95

I.

PEKERJAAN PERSIAPAN

I.1. PEK. BOUWPLANK


Panjang bangunan = ( 20.00 m + 2.00 m ) x
Lebar bangunan = ( 8.00 m + 2.00 m ) x

I.2. PAGAR PROYEK


Panjang bangunan = ( 20.00 m + 3.00 m ) x
Lebar bangunan = ( 8.00 m + 3.00 m ) x

II. PEKERJAAN STRUKTUR

A. PEKERJAAN TANAH
1 GALIAN TANAH PONDASI TAPAK (1,5x1,5x0,2)
Tinggi = 2.15 m
Lebar = 1.60
Jumlah = 24.00 ttk

Volume = 132.10 m3

2 GALIAN TANAH SLOOF 20/30


Tinggi = 0.30 m
Lebar = 0.30 m
Panjang = 124.00 m

Volume = 11.16 m3

3 URUG TANAH PEIL LANTAI PADAT


Lebar = 11.00 m
Panjang = 22.00 m
Tebal = 0.40 m

Volume = 96.80 m3

4 URUG PASIR BAWAH LANTAI TB=5 CM


Lebar = 11.00 m
Panjang = 22.00 m
Tebal = 0.05 m

Volume = 12.10 m3

5 URUG PASIR BAWAH PONDASI DAN SLOOF TB=5 CM


Dibawah pondasi ;
Lebar = 1.60 m
Tebal = 0.05 m
Jumlah = 24.00 ttk
Volume = 3.07 m3
Dibawah sloof ;
Lebar = 0.30 m
Panjang = 124.00 m
Tebal = 0.05 m
Volume 1.86 m3

Volume Total = 4.93 m3

B. PEKERJAAN PONDASI
1. PONDASI TAPAK (1,5x1,5x0,2)
Volume = 0.45 m3
Jumlah = 24.00 ttk

Volume Total = 10.80 m3

2. KOLOM PEDESTAL (30X30)


Tinggi = 2.20 m
Dimensi = 0.09 m2
Jumlah = 24.00 ttk

Volume Total = 4.75 m3

3. SLOOF 20/30
Panjang = 114.90 m'

Volume = 6.89 m3

4. PLASTIK SHEET
Lebar = 11.00 m
Panjang = 22.00 m

Volume = 242.00 m2

C. PEKERJAAN KONSTRUKSI BETON


C.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1. KOLOM 30X30
Tinggi = 4.00 m
Luas = 0.09 m2
Jumlah = 24.00 ttk

Volume = 8.64 m3

2. BALOK 30/40
Panjang arah x = 70.30 m'
b = 0.30 m
h = 0.40 m

Volume = 8.44 m3
3. BALOK 20/30
Panjang arah y = 41.20 m'
b = 0.20 m
h = 0.30 m

Volume = 2.47 m3

4. PELAT TB=12 CM
Luas
Blok I = 12.00 m2
Jumlah = 10.00 blok = 120.00 m2

Blok II = 4.00 m2
Jumlah = 1.00 blok = 4.00 m2

Blok III = 8.00 m2


Jumlah = 1.00 blok = 8.00 m2

Jumlah luasan = 132.00 m2


Tebal = 0.12 m

Volume = 15.84 m3

5. CANOPY TB=10 CM
Depan ;
Panjang = 12.00 m
Lebar = 0.70 m = 8.40 m2

Belakang ;
Panjang = 4.00 m
Lebar = 0.70 m = 2.80 m2

Jumlah luasan = 11.20 m2


Tebal = 0.08 m

Volume = 0.90 m3

6. RABAT BETON TB=6 CM


Panjang = 58.00 m
Lebar = 1.00 m
Tebal = 0.06 m

Volume = 3.48 m3

C.2 Lantai 2 (Elevasi 0,00 ~ +4,00)


1. KOLOM 30X30
Tinggi = 4.00 m
Luas = 0.09 m2
Jumlah = 24.00 ttk

Volume = 8.64 m3

2. DAK
Depan ;
Lebar = 2.00 m
Panjang = 20.00 m = 40.00 m2

Belakang ;
Lebar = 1.20 m
panjang = 20.00 m = 48.00 m2

Jumlah Luas = 88.00 m2


Volume = 8.80 m3

3. LISPLANK BETON
Panjang = 56.00 m'
Tinggi = 0.30 m'
Tebal = 0.08 m

Volume = 1.34 m3

4. RINGBALK
Panjang arah x = 0.80 m
Panjang arah y = 38.00 m'
Jumlah = 10.00 m'
48.00 m'

Volume = 2.88 m3

29. Plat beton tangga

Volume Lantai dasar = 6.44 m3

Panjang = 4.00 m
Tinggi = 2.00 m
= 4.47 m

1
III. PEKERJAAN ARSITEKTUR

2. Pas. Dinding
LANTAI 1

Tinggi = 3.88 m
Panjang arah x = 64.00 m'
Panjang arah y = 29.00 m'
Jumlah = 93.00 m'

Volume Lantai dasar = 360.84 m2

AREA KUSEN
J2 = 2.88 m2 x 5.00 = 14.40 m2
BV = 0.28 m2 x 4.00 = 1.12 m2
PVC = 1.60 m2 x 4.00 = 6.40 m2
P1 = 2.16 m2 x 2.00 = 4.32 m2
P2 = 4.32 m2 x 1.00 = 4.32 m2
Kaca Depan = 13.69 m2 x 2.00 = 27.38 m2
Jumlah = 57.94 m2

Volume Lantai dasar dikurangi vol dinding = 302.90 m2

LANTAI 2
Tinggi = 3.88 m
Panjang arah x = 48.00 m'
Panjang arah y = 18.00 m'
Jumlah = 66.00 m'

Tinggi = 0.80 m
Panjang arah x = 38.00 m'
Panjang arah y = 10.00 m'
Jumlah = 48.00 m'
Volume Lantai 2 = 114.00 m2

AREA KUSEN
J2 = 2.88 m2 x 10.00 = 28.80 m2
Kaca 50x50 = 1.85 m2 x 5.00 = 9.25 m2
Kaca Depan = 13.69 m2 x 2.00 = 27.38 m2
Jumlah = 65.43 m2

Volume Lantai dasar dikurangi vol dinding = 48.57 m2

10. PARTISI GYPSUM


Dinding Gypsum;
Panjang = 12.00 m'
Tinggi = 4.00 m
Volume = 48.00 m2

Area Kusen;
P2 = 4.32 m2 x 2.00 = 8.64 m2

Volume dinding partisi dikurangi kusen = 39.36 m2

PEKERJAAN LANTAI DAN DINDING

1. Pekerjaan Lantai keramik 60x60


LANTAI 1
Teras depan = 12.00 m2
Bangunan dalam = 192.00 m2
Tangga ;
Jumlah anak tangga = 15.00 anak tangga
lebar = 1.00 m
Optrade = 4.50 m2
Antrede = 3.00 m2
Bordes = 2.00 m2
Jumlah = 9.50 m2
Pengurangan ;
Toilet & Tangga = 32.67 m2

Volume Lantai 1 = 180.83 m2

LANTAI 2
Teras depan = - m2
Bangunan dalam = 192.00 m2
Tangga ;
Jumlah anak tangga = 15.00 anak tangga
lebar = 1.00 m
Optrade = 4.50 m2
Antrede = 3.00 m2
Bordes = 2.00 m2
Jumlah = 9.50 m2
Pengurangan ;
Toilet & Tangga = 32.67 m2

Volume Lantai 2 = 168.83 m2

Volume Lantai 3 = 168.83 m2

Volume Lantai 4 = 168.83 m2

PAS. PLINT KERAMIK

Volume Lantai 1 = 10.80 m2

Volume Lantai 2 = 10.80 m2

Volume Lantai 3 = 10.80 m2

Volume Lantai 4 = 10.80 m2

PAS. LANTAI KERAMIK KAMAR MANDI

Volume Lantai 1 = 9.72 m2

Volume Lantai 2 = 9.72 m2

Volume Lantai 3 = 9.72 m2

Volume Lantai 4 = 9.72 m2

PAS. KERAMIK DINDING KM/WC 20x25

LANTAI 1
Tinggi = 1.25
panjang = 6.00 m'
luas = 7.50 m2 - 1.13 =

Volume Lantai 1 = 30.00 m2

PEKERJAAN KUSEN
Pintu Lantai 1 = 2 = 3 = 4 = 1.00 unit

Jendela Lantai 2 = 3 = 4 = 12.00 unit

Rolling Dor = 3.00 unit (2,5*2,5)

PEKERJAAN PLAFON

LANTAI 1

Volume Lantai 1 = - m2

LIST PLAFOND

Panjang Lantai 1 = 161.15 m'

Panjang Lantai 2 = 161.15 m'

Panjang Lantai 3 = 161.15 m'

Panjang Lantai 4 = 161.15 m'

PEKERJAAN ATAP

Panjang = 7.00 m
Panjang miring = 3.93 m x
2.00 = 80.00 m'
2.00 = 32.00 m'
112.00 m'

2.00 = 120.00 m'


2.00 = 48.00 m'
168.00 m'
15
14
13

12
11
10
9
8
7
6
5

4
3
2
Optrede = 0.30 m
Antrede = 0.20 m
= 0.36 m
Panjang plat = 8.94 m Anak tangga = 0.03
Lebar = 1.00 m Lebar = 1.00
Tebal = 0.12 m Jumlah = 15.00
Volume plat = 1.07 m3 Volume Anak Tangga = 0.45
Jumlah = 2.15 m3

Plesteran dan Acian

m2
m2
m2
m2
m2
m2
m2

= 605.8 m2
m2
m2
m2
m2

= 97.14 m2

m2
### m2
3.4
m2
m
bh
m3
Pondasi Poer Plat ad. 1:2:3 (100x100x50)
1 M3 PEMBESIAN
Atas = d12 - 14
Bawah = d16 - 14

1 m3 beton plat
tebal = 0.50 m
lebar = 1.00 m
Panjang = 2.00 m
Check = 1.00 m3

arah lebar ;
Bawah D16 ;
panjang = 1.85 m' x 1.05 = 1.94 m'
jumlah = 15.29 bh x 1.94 = 29.69 m' = 46.91 kg

Atas D12 ;
panjang = 0.95 m' x 1.05 = 1.00 m'
jumlah = 15.29 bh x 1.00 = 15.25 m' = 13.57 kg

arah memanjang ;
Bawah D16 ;
panjang = 2.85 m' x 1.05 = 2.99 m'
jumlah = 8.14 bh x 2.99 = 24.37 m' = 38.50 kg

Atas D12 ;
panjang = 1.95 m' x 1.05 = 2.05 m'
jumlah = 8.14 bh x 2.05 = 16.67 m' = 14.84 kg

Jumlah D16 = 85.41 kg


Jumlah D12 = 28.41 kg
Jumlah = 113.82 kg

1 M3 BEKISTING DENGAN PAPAN


- Papan (dihitung 2 x pakai) 75 % =
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 28.00 bh
panjang = 8.40 m' + 0.000 m'
= 8.40 m' = 0.01 m3 = 1.05 btng
- Paku 1 - 3 2.08 kg kg

Pondasi Poer Plat ad. 1:2:3 (80x80x50)


1 M3 PEMBESIAN
Atas = d12 - 15
Bawah = d16 - 15

1 m3 beton plat
tebal = 0.50 m
lebar = 1.00 m
Panjang = 2.00 m
Check = 1.00 m3

arah lebar ;
Bawah D16 ;
panjang = 1.85 m' x 1.05 = 1.94 m'
jumlah = 15.29 bh x 1.94 = 29.69 m' = 46.91 kg

Atas D12 ;
panjang = 0.95 m' x 1.05 = 1.00 m'
jumlah = 15.29 bh x 1.00 = 15.25 m' = 13.57 kg

arah memanjang ;
Bawah D16 ;
panjang = 2.85 m' x 1.05 = 2.99 m'
jumlah = 8.14 bh x 2.99 = 24.37 m' = 38.50 kg

Atas D12 ;
panjang = 1.95 m' x 1.05 = 2.05 m'
jumlah = 8.14 bh x 2.05 = 16.67 m' = 14.84 kg

Jumlah D16 = 85.41 kg


Jumlah D12 = 28.41 kg
Jumlah = 113.82 kg

1 M3 BEKISTING DENGAN PAPAN


- Papan (dihitung 2 x pakai) 75 % =
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 28.00 bh
panjang = 8.40 m' + 0.000 m'
= 8.40 m' = 0.01 m3 = 1.05 btng
- Paku 1 - 3 2.08 kg kg

Pembuatan Sloof Beton 20/40 ad. 1:2:3


1 M3 PEMBESIAN
- Besi utama ; Atas = 3 d16
Tengah = 0 d12
Bawah = 3 d16
Ring ; d8-15

1 m3 beton sloof 20/40


Panjang = 12.50 m'
Vol = 1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D16 = 75.00 m' x 1.05 = 78.75 m' = 124.43 kg = ### btng
D12 = - m' x 1.05 = - m' = - kg =
Dlm 1 m3 beton sloof, jml besi ring ;
panjang ring = 1.05 m' x 1.00 = 1.05 m'
Jumlah ring = 63.50 bh' x 1.05 = 66.68 m' = 24.67 kg

Jumlah = 149.09 kg
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 % 5.00 m2
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 26.00 bh
panjang = 15.60 m' + 50.00 m'
= 65.60 m' = 0.11 m3 = 8.20 btng
- Paku 1 - 3 = 2.08 kg

Pembuatan sloof beton 15/20 ad. 1:2:3


1 M3 PEMBESIAN
- Besi utama ; Atas = 2 d12
Tengah = - -
Bawah = 2 d12
Ring ; d8-15

1 m3 beton sloof 15/20


Panjang = 33.33 m'
Vol = 1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D12 = 133.33 m' x 1.02 = 136.00 m' = 121.04 kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring = 0.50 m' x 1.02 = 0.51 m'
Jumlah ring = 167.67 bh' x 0.51 = 85.51 m' = 31.64 kg

Jumlah = 152.68 kg
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 % 8.33 m2
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 134.33 bh
panjang = 53.73 m' + 133.33 m'
= 187.07 m' = 0.33 m3 = 23.38 btng
Paku 1 - 3 2.08 kg

Pembuatan kolom 40x40 ad. 1:2:3 lantai 1


1 M3 PEMBESIAN
- Besi utama ; Atas = 4 d16
Tengah = 4 d16
Bawah = 4 d16
Ring ; d8-15

1 m3 beton kolom 40/40


Panjang = 6.25 m'
Vol = 1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D16 = 75.00 m' x 1.05 = 78.75 m' = 124.43 kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring = 1.40 m' x 1.05 = 1.47 m'
Jumlah ring = 42.67 bh' x 1.47 = 62.72 m' = 23.21 kg

Jumlah = 147.63 kg
1 M3 BEKISTING DENGAN MULTIPLEK
Multiplek (dihitung 2 x pakai) 50 % 5.00 m2
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 26.00 bh
panjang = 36.40 m' + 50.00 m'
= 86.40 m' = 0.15 m3 = 10.80 btng
Paku 1 - 3 2.08 kg

Pembuatan kolom 35x35 ad. 1:2:3 lantai 1


1 M3 PEMBESIAN
- Besi utama ; Atas = 4 d16
Tengah = 2 d16
Bawah = 4 d16
Ring ; d8-15

1 m3 beton kolom 35/35


Panjang = 8.16 m'
Vol = 1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D16 = 81.63 m' x 1.05 = 85.71 m' = 135.43 kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring = 1.20 m' x 1.05 = 1.26 m'
Jumlah ring = 55.42 bh' x 1.26 = 69.83 m' = 25.84 kg

Jumlah = 161.27 kg
1 M3 BEKISTING DENGAN MULTIPLEK
Multiplek (dihitung 2 x pakai) 50 % 5.71 m2
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 33.65 bh
panjang = 47.11 m' + 65.31 m'
= 112.42 m' = 0.20 m3 = 14.05 btng
Paku 1 - 3 2.08 kg

Pembuatan kolom 30x30 ad. 1:2:3 lantai 2 = lantai 3


1 M3 PEMBESIAN
- Besi utama ; Atas = 3 d16
Tengah = 2 d16
Bawah = 3 d16
Ring ; d8-15

1 m3 beton kolom 30/30


Panjang = 11.11 m'
Vol = 1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D16 = 88.89 m' x 1.05 = 93.33 m' = 147.47 kg

Dlm 1 m3 beton sloof, jml besi ring d8 ;


panjang ring = 1.05 m' x 1.00 = 1.05 m'
Jumlah ring = 75.07 bh' x 1.05 = 78.83 m' = 29.17 kg

Jumlah = 176.63 kg
1 M² BEKISTING DENGAN MULTIPLEK
Multiplek (dihitung 2 x pakai) 50 % 6.67 m2
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 45.44 bh
panjang = 54.53 m' + 88.89 m'
= 143.42 m' = 0.25 m3 = 17.93 btng
Paku 1 - 3 2.08 kg

Pembuatan kolom 15x15 ad. 1:2:3 lantai 3


1 M3 PEMBESIAN
- Besi utama ; Atas = 2 d10
Tengah =
Bawah = 2 d10
Ring ; d8-15
1 m3 beton kolom 15/15
Panjang = 44.44 m'
Vol = 1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D10 = 177.78 m' x 1.05 = 186.67 m' = 115.73 kg

Dlm 1 m3 beton sloof, jml besi ring d8 ;


panjang ring = 0.45 m' x 1 = 0.45 m'
Jumlah ring = 297.30 bh' x 0.45 = 133.78 m' = 49.50 kg

Jumlah = 165.23 kg
1 M² BEKISTING DENGAN MULTIPLEK
Multiplek (dihitung 4 x pakai) 25 % 3.33 m2
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 178.78 bh
panjang = 214.53 m' + 355.56 m'
= 570.09 m' = 1.00 m3 = 71.26 btng
Paku 1 - 3 2.08 kg

Pembuatan balok Induk 25x45 ad. 1:2:3


1 M3 PEMBESIAN
- Besi utama ; Atas = 5 d16
Tengah = 2 d12
Bawah = 3 d16
Ring ; d8-15

Panjang = 8.89 m'


Vol = 1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ; ###


D16 = 71.11 m' x 1.05 = 74.67 m' = 117.97 kg
D12 = 17.78 m' x 1.05 = 18.67 m' = 16.61 kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring = 1.25 m' x 1.00 = 1.25 m'
Jumlah ring = 51.79 bh' x 1.25 = 64.74 m' = 23.95 kg

Jumlah = 158.54 kg
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 % 5.11 m2
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 36.56 bh
panjang = 31.44 m' + 53.33 m'
= 84.77 m' = 0.15 m3 = 10.60 btng
- Paku 1 - 3 2.08 kg

Pembuatan balok 20x30 ad. 1:2:3


1 M3 PEMBESIAN
- Besi utama ; Atas = 3 d16
Tengah =
Bawah = 2 d16
Ring ; d8-15

1 m3 beton kolom 30/60


Panjang = 16.67 m'
Vol = 1.00 m3
Dlm 1 m3 beton sloof, jml besi utama ;
D16 = 83.33 m' x 1.05 = 87.50 m' = 138.25 kg
D12 = - m' x 1.05 = - m' = - kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring = 0.70 m' x 1.05 = 0.74 m'
Jumlah ring = 112.11 bh' x 0.74 = 82.40 m' = 30.49 kg

Jumlah = 168.74 kg
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 % 6.67 m2
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 67.67 bh
panjang = 85.26 m' + 6.00 m'
= 91.26 m' = 0.16 m3 = 11.41 btng
- Paku 1 - 3 2.08 kg

Pembuatan ring balok 15/20 ad. 1:2:3


1 M3 PEMBESIAN
- Besi utama ; Atas = 2 d12
Tengah = - -
Bawah = 2 d12
Ring ; d8-15

1 m3 beton ;
Panjang = 33.33 m'
Vol = 1.00 m3

Dlm 1 m3 beton jml besi utama ;


D12 = 133.33 m' x 1.05 = 140.000 m' = 124.60 kg

Dlm 1 m3 beton jml besi ring ;


panjang ring = 0.50 m' x 1.05 = 0.525 m'
Jumlah ring = 191.48 bh' x 0.525 = 100.525 m' = 37.19 kg

Jumlah = 161.79 kg
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 % = 6.667 m2
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah = 134.333 bh
panjang = 53.733 m' + 133.333 m'
= 187.067 m' = 0.327 m3 = 23.38 btng
- Paku 1 - 3 2.08 kg

Pembuatan plat lantai ad. 1:2:3, tb = 12 cm


- Besi Atas = d8 - 15 Rata-rata antara jarak 10 cm s.d 15 cm
Bawah = d8 - 15

1 m3 beton plat
tebal = 0.12 m
lebar = 1.00 m
Panjang = 8.33 m
Check = 1.00 m3

arah lebar
panjang = 1.00 m' x 1.00 = 1.00 m'
jumlah = 56.56 bh x 1.00 = 56.56 m' = 20.93 kg x 1 = 20.93

arah memanjang
panjang = 8.33 m' x 1.00 = 8.33 m'
jumlah = 7.67 bh x 8.33 = 63.89 m' = 23.64 kg x 1 = 23.64

Jumlah = 44.56 44.56


1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 % 4.17 m2
- Kaso 5/7 BS (dihitung 2x pakai) 50 % 0.10 m3
- Kayu gelam 50.00 btg
- Paku 1 - 3 4.00 kg

Pembuatan plat lantai ad. 1:2:3, tb = 10 cm


- Besi Atas = d8 - 15
Bawah = d8 - 15

1 m3 beton plat
tebal = 0.10 m
lebar = 1.00 m
Panjang = 10.00 m
Check = 1.00 m3

arah lebar
panjang = 1.00 m' x 1.00 = 1.00 m'
jumlah = 67.67 bh x 1.00 = 67.67 m' = 25.04 kg

arah memanjang
panjang = 10.00 m' x 1.00 = 10.00 m'
jumlah = 7.67 bh x 10.00 = 76.67 m' = 28.37 kg

Jumlah = 53.40 kg x 1 = 53.40


1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 % 5.00 m2
- Kaso 5/7 BS (dihitung 2x pakai) 50 % 0.10 m3
- Kayu gelam 50.00 btg
- Paku 1 - 3 4.00 kg

Pembuatan plat pet 8/30 ad. 1:2:3


1 M3 PEMBESIAN
1 m3 beton plat
tebal = 0.08 m
lebar = 0.30 m d8-15
Panjang = 41.67 m d8-15
Check = 1.00 m3

arah lebar ; d8
panjang = 0.30 m' x 1.05 = 0.32 m'
jumlah = 278.78 bh x 0.32 = 87.82 m' = 32.49 kg

arah memanjang ; d8
panjang = 41.67 m' x 1.05 = 43.75 m'
jumlah = 3.00 bh x 43.75 = 131.25 m' = 48.56 kg

Jumlah = 81.05 kg
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 75 % = 12.50 m2
- Kaso 5/7 BS (dihitung 2x pakai) 50 % 0.10 m3
- Kayu gelam 50.00 btg
- Paku 1 - 3 4.00 kg

Pembuatan plat tangga ad. 1:2:3


1 M3 PEMBESIAN
1 m3 beton plat
tebal = 0.120 m
lebar = 1 m
Panjang = 8.333 m
Check = 1 m3

arah lebar bawah, d8


panjang = 2.04 m' x 1.05 = 2.14 m'
jumlah = 42.67 bh x 2.14 = 91.39 m' = 33.82 kg

arah memanjang bawah, d12


panjang = 16.71 m' x 1.05 = 17.54 m'
jumlah = 6.00 bh x 17.54 = 105.25 m' = 93.67 kg

Jumlah = 127.49 kg

1 M3 BEKISTING DENGAN MULTIPLEK


- Multiplek (dihitung 2 x pakai) 75 % = 4.17 m2
- Kaso 5/7 BS (dihitung 2x pakai) 50 % 0.10 m3
- Kayu gelam 50.00 btg
- Paku 1 - 3 4.00 kg
kg

kg
REKAPITULASI ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN LABORATURIUM KOMPUTER
IPB DARMAGA BOGOR

JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp)

A. STANDAR

I. PEKERJAAN PERSIAPAN Rp 27,511,680.00

II. PEKERJAAN STRUKTUR Rp 389,641,377.44


A PEK. TANAH Rp 5,642,928.56
B PEK. PONDASI Rp 89,350,012.60
C PEK. KONSTRUKSI BETON Rp 294,648,436.28

III. PEKERJAAN ARSITEKTUR Rp 338,971,497.90


A PEK. DINDING Rp 113,027,992.10
B PEK. LANTAI Rp 36,722,310.00
C PEK. KUSEN LENGKAP Rp 72,175,150.00
D PEK. PENUTUP ATAP Rp 66,000,714.00
E PEK. PLAFOND Rp 27,058,392.00
F PEK. SANITAIR Rp 2,604,500.00
G PEK. PENGECATAN Rp 21,382,439.80

IV. PEKERJAAN MEKANIKAL Rp 42,863,606.00


A PEK. INSTALASI PLAMBING Rp 42,863,606.00

V. PEKERJAAN ELEKTRIKAL Rp 58,234,780.00


A PEK. LISTRIK Rp 48,584,780.00
B PEK. PENANGKAL PETIR Rp 9,650,000.00

SUB TOTAL : Rp 857,222,941.34

PPN 10% : Rp 85,722,294.13

TOTAL : Rp 942,945,235.48

DIBULATKAN : Rp 942,900,000.00

B. NON STANDAR

I TATA SUARA 3% x Rp 857,222,941.34 Rp 25,716,688.24


II TATA UDARA 10% x Rp 857,222,941.34 Rp 85,722,294.13
III PENINGKATAN MUTU 10% x Rp 857,222,941.34 Rp 85,722,294.13
IV TELEPON & PABX 4% x Rp 857,222,941.34 Rp 34,288,917.65
V SARANA & PRASARANA LINGKUNGAN 2% x Rp 857,222,941.34 Rp 17,144,458.83

SUB TOTAL : Rp 248,594,652.99

PPN 10% : Rp 24,859,465.30

TOTAL : Rp 273,454,118.29

DIBULATKAN : Rp 273,400,000.00

TOTAL Rp 1,216,300,000.00

TERBILANG : Satu milyar dua ratus enam belas juta tiga ratus ribu rupiah

f:\460742917.xls
f:\460742917.xls
HARGA
(Rp)

f:\460742917.xls
f:\460742917.xls
RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN LABORATURIUM KOMPUTER
IPB DARMAGA BOGOR

HARGA SAT. JUMLAH HARGA


No. PEKERJAAN SAT. VOLUME
(Rp) (Rp)

I. PEKERJAAN PERSIAPAN
1 Bouwplank M' 112.00 38,370.00 4,297,440.00
2 Pagar sementara seng gelombang T. 2 m M' 168.00 138,180.00 23,214,240.00
Sub Total I. 27,511,680.00

II. PEKERJAAN STRUKTUR

A PEK. TANAH
1 Galian tanah pondasi tapak m3 132.10 14,200.00 1,875,763.20
2 Galian tanah sloof m3 11.16 14,200.00 158,472.00
3 Urug tanah peil lantai padat m3 96.80 6,800.00 658,240.00
4 Urug pasir bawah lantai t. 5 cm m3 12.10 173,230.00 2,096,083.00
5 Urug pasir bawah pondasi & sloof t. 5 cm m3 4.93 173,230.00 854,370.36
Jumlah A 5,642,928.56
B PEK. PONDASI
1 Pondasi Tapak 1,5x1,5 m3 10.80 3,220,940.00 34,786,152.00
2 Kolom Pedestal 30x30 m3 4.75 5,124,050.00 24,349,485.60
3 Sloof 20/30 m3 6.89 4,312,500.00 29,730,375.00
4 Plastic sheet m2 242.00 2,000.00 484,000.00
Jumlah B 89,350,012.60
C PEK. KONSTRUKSI BETON
C.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Kolom 30x30 m3 8.64 5,124,050.00 44,271,792.00
2 Balok :
Balok 20x40 m3 8.44 4,483,280.00 37,820,950.08
Balok 20x30 m3 2.47 4,305,970.00 10,644,357.84
3 Plat lantai t. 12 cm (M6 - 1,5 lps) m3 15.84 2,335,460.00 36,993,686.40
4 Canopy tb. 8 cm m3 0.90 4,511,030.00 4,041,882.88
5 Rabat beton t. 6 cm m2 3.48 76,120.00 264,897.60
6 Tangga :
Plat tangga m3 4.23 4,538,340.00 19,209,885.55
Plat bordes m3 1.37 4,608,450.00 6,290,534.25
Balok bordes (20x30) m3 0.42 4,627,770.00 1,943,663.40
161,481,650.00

C.2 Lantai 2 (Elevasi +4,00 ~ +8,00)


1 Kolom 30x30 m3 8.64 4,559,260.00 39,392,006.40
2 Balok
Balok (20x40) m3 8.44 4,495,710.00 37,925,809.56
Balok (20x30) m3 2.47 5,230,810.00 12,930,562.32
3 Plat lantai dak 10 cm (M6 - 1,5 lps) m3 8.80 2,621,550.00 23,069,640.00
3 Ringbalk 20/30 m3 2.88 5,230,810.00 15,064,732.80
4 Lisplank beton 8/30 m3 1.34 3,559,550.00 4,784,035.20
133,166,786.28
Jumlah C 294,648,436.28
Sub Total II. 389,641,377.44

III. PEKERJAAN ARSITEKTUR

A PEK. DINDING
A.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Dinding hebel t 10 cm + MU 380 m2 302.90 99,070.00 30,008,303.00
2 Plesteran dinding MU 100 t. 10 mm m2 605.80 36,140.00 21,893,612.00
3 Acian MU 200 t. 3 mm m2 605.80 17,060.00 10,334,948.00
4 Keramik dinding 20/25 warna muda m2 30.00 102,960.00 3,088,800.00
5 Kolom Praktis 10x10 m' 64.00 83,000.00 5,312,000.00
6 Ring balok 10x15 m' 72.00 77,820.00 5,603,040.00
7 Balok lintel 10x15 m' 40.00 77,820.00 3,112,800.00
8 Finishing kolom (acian MU 200) m2 96.00 17,060.00 1,637,760.00
9 Finishing canopy (acian MU 200) m2 11.20 17,060.00 191,072.00
10 Partisi gypsumboard ex Elephant 9mm 2 muka
& rangka metak stud 64 t. 85 mm m2 39.36 110,110.00 4,333,929.60
11 Reiling tangga besi hollow m2 14.62 400,000.00 5,849,600.00
91,365,864.60

f:\460742917.xls Hal. 29
HARGA SAT. JUMLAH HARGA
No. PEKERJAAN SAT. VOLUME
(Rp) (Rp)
A.2 Lantai 2 (Elevasi +4,00 ~ +8,00)
1 Dinding hebel t 10 cm + MU 380 m2 48.57 100,210.00 4,867,199.70
2 Plesteran dinding MU 100 t. 10 mm m2 97.14 37,330.00 3,626,236.20
3 Acian MU 200 t. 3 mm m2 97.14 17,940.00 1,742,691.60
4 Balok lintel 10x15 m' 104.00 78,870.00 8,202,480.00
5 Finishing kolom (acian MU 200) m2 96.00 17,940.00 1,722,240.00
6 Finishing canopy (acian MU 200) m2 88.00 17,060.00 1,501,280.00
21,662,127.50
Jumlah A 113,027,992.10
B PEK. LANTAI
B.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Screeding t. 2 cm (MU 440) m2 148.00 44,110.00 6,528,280.00
2 Keramik 30/30 MU 450 & 408 m2 148.00 98,330.00 14,552,840.00
3 Kramik Tangga m2 7.80 98,330.00 766,974.00
4 Step Nossing m' 19.80 40,670.00 805,266.00
5 Waterproofing MU 600 m2 11.25 82,520.00 928,350.00
23,581,710.00
B.2 Lantai 2 (Elevasi +4,00 ~ +8,00)
1 Keramik 30/30 MU 450 & 408 m2 132.00 99,550.00 13,140,600.00
13,140,600.00
Jumlah B 36,722,310.00
C PEK. KUSEN LENGKAP
C.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 P-1 (PA) unit 2.00 1,359,620.00 2,719,240.00
2 P-2 (PA) unit 2.00 2,335,690.00 4,671,380.00
3 PK (PVC) unit 4.00 650,000.00 2,600,000.00
4 J2 (JA) unit 5.00 1,576,480.00 7,882,400.00
5 BV (JA) unit 4.00 344,070.00 1,376,280.00
6 J1 (Kusen 3,7x3,7) unit 2.00 8,000,000.00 16,000,000.00
35,249,300.00
C.2 Lantai 2 (Elevasi +4,00 ~ +8,00)
1 J2 (JA) unit 10.00 1,576,480.00 15,764,800.00
2 BV (JA) unit 15.00 344,070.00 5,161,050.00
3 J1 (Kusen 3,7x3,7) unit 2.00 8,000,000.00 16,000,000.00
36,925,850.00
Jumlah C 72,175,150.00

D PEK. PENUTUP ATAP


D.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Talang tegak d. 6" PVC AW + cat m' 32.00 155,450.00 4,974,400.00
2 Waterproofing MU 600 m2 11.25 82,520.00 928,350.00
3 Roofdrain d. 3" bh 4.00 200,000.00 800,000.00
6,702,750.00
D.2 Lantai 2 (Elevasi +4,00 ~ +8,00)
1 Rangka atap baja ringan m2 157.20 212,200.00 33,357,840.00
2 Genteng metal berpasir 41x110 cm m2 157.20 120,670.00 18,969,324.00
3 Nok metal berpasir P.110 cm L.5 cm T.6 cm m' 20.00 59,660.00 1,193,200.00
4 Talang tegak d. 6" PVC AW + cat m' 32.00 155,550.00 4,977,600.00
5 Roofdrain bh 4.00 200,000.00 800,000.00
59,297,964.00
Jumlah D 66,000,714.00
E PEK. PLAFOND
E.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Plafond gypsum board t. 9 mm rangka besi hollow m2 142.00 76,160.00 10,814,720.00
2 Plafond kalsiboard rangka besi hollow m2 6.00 77,550.00 465,300.00
3 Plafond beton expose (finishing) m2 11.20 17,060.00 191,072.00
4 List plafond gypsum m' 93.00 13,700.00 1,274,100.00
5 List plafond kayu m' 30.00 12,500.00 375,000.00
13,120,192.00
E.2 Lantai 2 (Elevasi +4,00 ~ +8,00)
1 Plafond gypsum board t. 9 mm rangka besi hollow m2 148.00 76,660.00 11,345,680.00
2 Plafond beton expose (finishing) m2 88.00 17,940.00 1,578,720.00
3 List plafond gypsum m' 74.00 13,700.00 1,013,800.00
13,938,200.00
Jumlah E 27,058,392.00

f:\460742917.xls Hal. 30
HARGA SAT. JUMLAH HARGA
No. PEKERJAAN SAT. VOLUME
(Rp) (Rp)
F PEK. SANITAIR
F.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Closet Jongkok Standar Putih Porseline Toto bh 5.00 304,700.00 1,523,500.00
2 Wastafel Lengkap TOTO LW 230 bh 1.00 1,081,000.00 1,081,000.00
Jumlah F 2,604,500.00
G PEK. PENGECATAN
G.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Cat dinding Vinilex (3x) m2 605.80 15,970.00 9,674,626.00
2 Cat dinding Partisi m2 78.72 15,970.00 1,257,158.40
3 Plitur daun pintu m2 21.60 33,400.00 721,440.00
4 Cat Plafond Gypsum m2 142.00 17,580.00 2,496,360.00
5 Cat plafond kalsiboard Vinilex (3x) m2 6.00 17,580.00 105,480.00
6 Cat plafond beton expose Vinilex (3x) m2 11.20 17,580.00 196,896.00
7 Cat list plafond gypsum m' 93.00 5,274.00 490,482.00
8 Cat list plafond kayu m' 30.00 3,058.00 91,740.00
15,034,182.40
G.2 Lantai 2 (Elevasi +4,00 ~ +8,00)
1 Cat dinding Vinilex (3x) m2 97.14 16,510.00 1,603,781.40
2 Cat Plafond Gypsum m2 148.00 18,450.00 2,730,600.00
3 Cat plafond beton expose Vinilex (3x) m2 88.00 18,450.00 1,623,600.00
4 Cat list plafond gypsum m' 74.00 5,274.00 390,276.00
6,348,257.40
Jumlah G 21,382,439.80

Sub Total III. 338,971,497.90


JUMLAH I s/d III 756,124,555.34

f:\460742917.xls Hal. 31
HARGA SAT. JML. HARGA
No. PEKERJAAN SAT. VOLUME
(Rp) (Rp)

IV. PEKERJAAN MEKANIKAL

A PEK. INSTALASI PLAMBING

1 Peralatan utama
a. Jet Pump Kap. 250 W (Sanyo) unit 1.00 3,500,000.00 3,500,000.00
b. Pengeboran + Instalasi lot 1.00 5,000,000.00 5,000,000.00
Kedalaman +/- 20 m
c. Tanki Atas (Cylinder) unit 2.00 1,250,000.00 2,500,000.00
Kap. 1 m3
d. Automatic Water Level Control (Radar) set 1.00 150,000.00 150,000.00
e. Biofil BF08 lot 1.00 6,050,000.00 6,050,000.00
Jumlah 1 17,200,000.00
2 Instalasi
2.1 Lantai Dasar
a. Pemipaan Air Bersih
- Pipa PVC AW
dia. 1" m 56.00 14,780.00 827,680.00
dia. 3/4" m 6.00 10,140.00 60,840.00
dia. 1/2" m 32.00 7,780.00 248,960.00
- Fitting lot 1.00 113,748.00 113,748.00
- Valves
Gate Valve dia. 1" bh 2.00 100,800.00 201,600.00
Kran Tembok dia. 1/2" bh 4.00 75,000.00 300,000.00
b. Pemipaan Air Kotor, Bekas & Vent
- Pipa PVC AW
dia. 4" m 16.00 89,990.00 1,439,840.00
dia. 2" m 20.00 31,850.00 637,000.00
dia. 1" m 12.00 14,780.00 177,360.00
- Fitting lot 1.00 225,420.00 225,420.00
- Floor Drain (FD) SAN EI / Setara
dia. 2" bh 6.00 125,000.00 750,000.00
4,982,448.00
2.2 Lantai Atas
a. Pemipaan Air Bersih
- Pipa PVC AW
dia. 1" m 53.00 14,780.00 783,340.00
dia. 3/4" m 10.00 10,140.00 101,400.00
dia. 1/2" m 56.00 7,780.00 435,680.00
- Fitting lot 1.00 132,042.00 132,042.00
- Valves
Gate Valve dia. 1" bh 2.00 100,800.00 201,600.00
b. Pemipaan Air Kotor, Bekas & Vent
- Pipa PVC AW
dia. 4" m 40.00 89,990.00 3,599,600.00
dia. 3" m 12.00 64,320.00 771,840.00
dia. 2" m 16.00 31,850.00 509,600.00
dia. 1" m 16.00 14,780.00 236,480.00
- Fitting lot 1.00 511,752.00 511,752.00
- Floor Drain (FD)
dia. 2" bh 6.00 125,000.00 750,000.00
- Clean Out (CO)
dia. 2" bh 4.00 65,000.00 260,000.00
8,293,334.00
2.3 Atap
a. Pemipaan Air Hujan
- Pipa PVC AW
dia. 4" m 64.00 89,990.00 5,759,360.00
dia. 3" m 64.00 64,320.00 4,116,480.00
- Fitting lot 1.00 987,584.00 987,584.00
- Roof Drain (RD)
dia. 4" bh 6.00 85,000.00 510,000.00
dia. 3" bh 4.00 70,000.00 280,000.00

- Bak Kontrol
Uk. 400x400 mm bh 4.00 150,000.00 600,000.00
- Galian dan urugan kembali m' 64.00 2,100.00 134,400.00
12,387,824.00
Jumlah 2 25,663,606.00

f:\460742917.xls Hal. 32
HARGA SAT. JML. HARGA
No. PEKERJAAN SAT. VOLUME
(Rp) (Rp)

JUMLAH IV. 42,863,606.00

f:\460742917.xls Hal. 33
HARGA SAT. JML. HARGA
No. PEKERJAAN SAT. VOLUME
(Rp) (Rp)

V. PEKERJAAN ELEKTRIKAL

A PEK. LISTRIK

A.1 PANEL PENERANGAN unit 1.00


1 MCB 35 A, 3P, 6kA 1.00 83,000.00 83,000.00
2 MCB 10A, 1P, 4,5kA 7.00 65,500.00 458,500.00
3 MCB 6A, 1P, 4,5kA 7.00 65,500.00 458,500.00
4 Lampu Indikator 3.00 80,000.00 240,000.00
5 Box Panel Plat 1.00 450,000.00 450,000.00
6 Pentanahan dan Accessories 1.00 2,500,000.00 2,500,000.00
4,190,000.00
A.2 KABEL FEEDER + KABEL BC
1 Dari kWh M
Panel Distribusi Daya (PD-D)
- NYY 3 x 6 mm2 m 20.00 21,500.00 430,000.00
430,000.00
A.3 INSTALASI DAN ARMATURE
1 Lantai Dasar
a. Lampu Baret TL-E 20 W bh 28.00 279,510.00 7,826,280.00
b. Lampu TL 1 x 36 W V Shape bh 18.00 247,800.00 4,460,400.00
c. Saklar tunggal bh 9.00 20,870.00 187,830.00
d. Saklar ganda bh 23.00 23,400.00 538,200.00
e. Stop Kontak bh 16.00 20,980.00 335,680.00
f. Instalasi penerangan titik 46.00 156,110.00 7,181,060.00
g. Instalasi stop kontak titik 16.00 168,530.00 2,696,480.00
23,225,930.00
2 Lantai Dua
a. Lampu Baret TL-E 20 W bh 19.00 279,510.00 5,310,690.00
b. Lampu TL 1 x 36 W V Shape bh 22.00 247,800.00 5,451,600.00
d. Saklar tunggal bh 7.00 20,870.00 146,090.00
e. Saklar ganda bh 17.00 23,400.00 397,800.00
f. Stop Kontak bh 16.00 20,980.00 335,680.00
g. Instalasi penerangan titik 41.00 156,110.00 6,400,510.00
h. Instalasi stop kontak titik 16.00 168,530.00 2,696,480.00
20,738,850.00
43,964,780.00

Jumlah A 48,584,780.00

B PEK. PENANGKAL PETIR


(System Conventional)

1 Splitzen dia. 1" bh 6.00 250,000.00 1,500,000.00


Dengan Tiang 1 meter (Pipa Galvanis)
Lengkap dengan Peralatan Bantu
2 Kabel BC 50 mm2 dan Peralatan Bantu m 80.00 65,000.00 5,200,000.00
3 Pentanahan lengkap dengan : lot 1.00 2,500,000.00 2,500,000.00
a. Grounding System 1x Cooper Rod 5/8"
dengan Panjang 6 meter Maks. 2 Ohm
b. Bak Kontrol 40 x 40 x 40 cm
c. Material Bantu
4 Instalasi dan Material Bantu lot 1.00 450,000.00 450,000.00
Jumlah B 9,650,000.00

JUMLAH V. 58,234,780.00

f:\460742917.xls Hal. 34
DAFTAR HARGA SATUAN PEKERJAAN
KAB. BOGOR TAHUN ANGGARAN 2008

HARGA
No. PEKERJAAN
(Rp)
A. PEK. SIPIL & ARSITEK
1 M2 Pembersihan lahan 5,750.00
2 M' Bouwplank 38,370.00
3 M' Pagar proyek 138,180.00
4 M3 Galian tanah max kedalaman 1 m' 14,200.00
5 M3 Galian tanah max kedalaman 2 m' 18,640.00
6 M3 Urugan tanah padat (urugan kembali) 6,800.00
7 M3 Pemadatan tanah 17,750.00
8 M3 Urugan pasir 173,230.00
9 M3 Pondasi batu kosong (anstamping batu) 248,940.00
10 M3 Pas. Batu belah 1pc:4ps 525,220.00
11 M3 Lantai kerja t. 5 cm/beton tumbuk 1pc:3ps:5kr 593,820.00
12 M2 Screeding t. 2 cm (MU 440) 44,110.00
M2 Screeding t. 2 cm (MU 440) (Lt. 2) 44,290.00
13 M3 Beton site mix K-175 898,720.00
M3 Beton site mix K-175 (Lt. 2) 920,410.00
14 M3 Beton site mix K-225 960,360.00
M3 Beton site mix K-225 (Lt. 2) 982,050.00
15 M3 Readymix K-225 856,050.00
M3 Readymix K-225 (Lt. 2) 864,150.00
16 M3 Readymix K-300 905,050.00
M3 Readymix K-300 (Lt. 2) 913,150.00
17 Kg Besi beton < d 12 16,850.00
Kg Besi beton < d 12 (Lt. 2) 16,890.00
18 Kg Besi beton > D 13 17,270.00
Kg Besi beton > D 13 (Lt. 2) 17,310.00
19 M2 Wire Mesh M-8 (1,5 lapis) 137,020.00
M2 Wire Mesh M-8 (1,5 lapis) (Lt. 2) 137,420.00
20 M2 Wire Mesh M-6 (1,5 lapis) 77,070.00
M2 Wire Mesh M-6 (1,5 lapis) (Lt. 2) 77,290.00
21 M2 Wire Mesh M-4 (1 lapis) 22,760.00
M2 Wire Mesh M-4 (1 lapis) (Lt. 2) 22,830.00
22 M' Pipa Hitam t. 3,6 mm; D 2" (medium) 49,550.00
23 M' Pipa Hitam t. 3,6 mm; D 2,5" (medium) 61,570.00
24 Kg Baja Profil 21,430.00
25 M2 Bekisting multiplex 9 mm 94,580.00
M2 Bekisting multiplex 9 mm (Lt. 2) 96,680.00
26 M' Sloof praktis 10/15 100,280.00
27 M3 Sloof type S-1 20/40 4,496,360.00
28 M3 Sloof type S-2 20/30 4,312,500.00
29 M3 Sloof type S-3 20/30 4,312,500.00
30 M3 Pondasi tapak type P-1 (4,4x2,4) 2,872,340.00
31 M3 Pondasi tapak type P-2 (2,4x2,4) 3,154,900.00
32 M3 Pondasi tapak type P-3 (2,0x2,0) 2,699,550.00
33 M3 Pondasi tapak type P-4 (1,5x1,5) 3,220,940.00
34 M3 Pondasi tapak type P-5 (1,0x1,0) 4,193,120.00
35 M2 Rabat beton t. 6 cm 76,120.00
36 M' Kolom Praktis 10x10 83,000.00
M' Kolom Praktis 10x10 (Lt. 2) 83,770.00
37 M3 Kolom K1-1 (40x40) 3,614,520.00
M3 Kolom K1-2 (40x40) 3,290,920.00
38 M3 Kolom K2-1 (30x30) 5,124,050.00
M3 Kolom K2-2 (30x30) 4,559,260.00
39 M' Balok lintel 10x15 77,820.00

f:\460742917.xls Hal. 35
HARGA
No. PEKERJAAN
(Rp)
M' Balok lintel 10x15 (Lt.2) 78,870.00
40 M3 Balok B1 (30x60) 4,422,150.00
41 M3 Balok B2 (30x60) 2,972,870.00
42 M3 Balok B3 (25x55) 4,729,910.00
43 M3 Balok B4 (25x50) 4,267,510.00
44 M3 Balok B5 (20x40) 5,327,140.00
45 M3 Balok B6 (20x40) 4,362,110.00
46 M3 Balok B7 (20x40) 4,483,280.00
47 M3 Balok B8 (20x40) 4,141,410.00
48 M3 Balok B9 (20x40) 3,799,530.00
49 M3 Balok B10 (20x30) 4,305,970.00
M3 Balok B10 (20x30) (Lt. 2) 4,318,100.00
50 M3 Balok B11 (20x30 + 8x70) 3,149,520.00
51 M3 Balok B12 (20x30) 3,682,810.00
52 M3 Balok B13 (25x60) (Lt. 2) 3,359,780.00
53 M3 Balok B14 (25x60) (Lt. 2) 3,724,860.00
54 M3 Balok B15 (20x40) (Lt. 2) 4,495,710.00
55 M3 Balok B16 (20x40) (Lt. 2) 4,324,580.00
56 M3 Balok B17 (20x30) (Lt. 2) 5,230,810.00
57 M3 Balok B18 (20x30) (Lt. 2) 4,774,450.00
58 M3 Balok bordes (20x30) 4,627,770.00
59 M3 RB1 (20x25) (Lt. 2) 4,787,430.00
60 M3 RB2 (20x25) (Lt. 2) 4,442,400.00
61 M3 Plat tangga 4,538,340.00
62 M3 Plat bordes 4,608,450.00
63 M3 Plat lantai S1 t. 12 cm (M6) 2,335,460.00
M3 Plat lantai S1 t. 12 cm (M6) (Lt. 2) 2,362,900.00
64 M3 Plat lantai S2 t. 10 cm (M4) 2,078,450.00
65 M3 Plat lantai S3 t. 10 cm (M6) 2,621,550.00
66 M3 Plat canopy type A (1,85x0,75x0,08) 4,511,030.00
M3 Plat canopy type A (1,85x0,75x0,08) (Lt. 2) 4,565,110.00
67 M3 Plat canopy type B (2,85x0,75x0,08) 4,511,030.00
68 M3 Plat canopy type C (0,75x0,75x0,08) 4,511,030.00
M3 Plat canopy type C (0,75x0,75x0,08) (Lt. 2) 4,565,110.00
69 M3 Plat canopy type D (3,70x0,75x0,08) 4,511,030.00
M3 Plat canopy type D (3,70x0,75x0,08) (Lt. 2) 4,565,110.00
70 M3 Plat canopy type E (1,70x0,40x0,08) 2,325,540.00
M3 Plat canopy type E (1,70x0,40x0,08) (Lt. 2) 2,362,650.00
71 M2 Rangka atap baja ringan 212,200.00
72 M2 Genteng metal berpasir 41x110 cm 119,730.00
M2 Genteng metal berpasir 41x110 cm (Lt. 2) 120,670.00
73 M' Nok metal berpasir P.110 cm L.5 cm T.6 cm 58,320.00
M' Nok metal berpasir P.110 cm L.5 cm T.6 cm (Lt. 2) 59,660.00
74 M2 Plafond gypsum board t. 9 mm rangka besi hollow 76,160.00
M2 Plafond gypsum board t. 9 mm rangka besi hollow (Lt. 2) 76,660.00
75 M2 Plafond kalsiboard rangka besi hollow 77,550.00
M2 Plafond kalsiboard rangka besi hollow (Lt. 2) 78,040.00
76 M2 Keramik 20/20 MU 450 & 408 (Lt. 1) 90,530.00
M2 Keramik 20/20 MU 450 & 408 (Lt. 2) 91,750.00
77 M2 Keramik dinding 20/25 warna muda 102,960.00
M2 Keramik dinding 20/25 warna muda (Lt. 2) 105,090.00
78 M2 Keramik dinding 20/25 warna tua 104,760.00
M2 Keramik dinding 20/25 warna tua (Lt. 2) 106,890.00
79 M2 Keramik 30/30 MU 450 & 408 (Lt. 1) 98,330.00
M2 Keramik 30/30 MU 450 & 408 (Lt. 2) 99,550.00
80 M2 Pas. Batako PC pres 10x20x40 ad 1:4 63,660.00
81 M2 Dinding hebel t 10 cm + MU 380 99,070.00
M2 Dinding hebel t 10 cm + MU 380 (Lt. 2) 100,210.00

f:\460742917.xls Hal. 36
HARGA
No. PEKERJAAN
(Rp)
82 M2 Plesteran dinding MU 100 t. 10 mm 36,140.00
M2 Plesteran dinding MU 100 t. 10 mm (Lt. 2) 37,330.00
83 M2 Acian MU 200 t. 3 mm 17,060.00
M2 Acian MU 200 t. 3 mm (Lt. 2) 17,940.00
84 M2 Waterproofing MU 600 82,520.00
M2 Waterproofing MU 600 (Lt. 2) 83,710.00
85 M2 Pengecatan dinding Cat Vinilex 15,970.00
M2 Pengecatan dinding Cat Vinilex (Lt. 2) 16,510.00
86 M2 Pengecatan plafond (3x) Cat Vinilex 17,580.00
M2 Pengecatan plafond (3x) Cat Vinilex (Lt. 2) 18,450.00
87 M2 Pengecatan kayu (3x) berikut meni 30,580.00
M2 Pengecatan kayu (3x) berikut meni (Lt. 2) 31,180.00
88 M2 Pelaburan Bidang Kayu dengan Politur 33,400.00
M2 Pelaburan Bidang Kayu dengan Politur (Lt. 2) 33,690.00
89 M2 Pengecatan meni besi 10,690.00
90 M2 Pengecatan besi 44,480.00
M2 Pengecatan besi (Lt. 2) 46,420.00
91 M' Listplank metal 30 cm (Lt. 2) 114,730.00
92 Un P-1 (PA) 1,359,620.00
93 Un P-1' (PA) 1,137,230.00
94 Un P-2 (PA) 2,335,690.00
95 Un J1 (JA) 1,005,960.00
96 Un J2 (JA) 1,576,480.00
97 Un BV (JA) 344,070.00
98 Un BV-1 (JA) 197,210.00

B. PEK. MEKANIKAL
1 1 M¹ Pas. Pipa PVC d. 1/2" (AW) Wavin 7,780.00
2 1 M¹ Pas. Pipa PVC d. 3/4" (AW) Wavin 10,140.00
3 1 M¹ Pas. Pipa PVC d. 1" (AW) Wavin 14,780.00
5 1 M¹ Pas. Pipa PVC d. 1 1/2" (AW) Wavin 23,730.00
6 1 M¹ Pas. Pipa PVC d. 2" (AW) Wavin 31,850.00
7 1 M¹ Pas. Pipa PVC d. 2 1/2" (AW) Wavin 46,680.00
8 1 M¹ Pas. Pipa PVC d. 3" (AW) Wavin 64,320.00
9 1 M¹ Pas. Pipa PVC d. 4" (AW) Wavin 89,990.00

C. PEK. ELEKTRIKAL
1 1 Ttk Pas. Instalasi penerangan 156,110.00
2 1 Ttk Pas. Instalasi stop kontak 168,530.00
3 1 Ttk Stop Kontak 20,980.00
4 1 Ttk Saklar tunggal 20,870.00
5 1 Ttk Saklar ganda 23,400.00
6 1 Bh TL 2 x 36 W V Shape 398,930.00
7 1 Bh Lampu Baret TL-E 20 W 279,510.00
8 1 Bh Dwn Light PCL 13 W 235,040.00

f:\460742917.xls Hal. 37
DAFTAR HARGA MATERIAL
TAHUN ANGARAN 2008

HARGA SATUAN
No. BAHAN BANGUNAN SATUAN
(Rp)

1 Atap :
Genteng metal berpasir 41x110 cm 99,900.00 m2
Nok metal berpasir P.110 cm L.5 cm T.6 cm 42,350.00 m'
Flashing metal 110x10 cm Primaroof 45,980.00 m'
Listplank dan talang Zam t=0,8mm powdercoating 200,000.00 m'
Kalsiplank uk. 3000x300x12 mm 58,900.00 lbr
2 Bata, bata ringan, batu & pasir :
Bata merah bakar kelas I 680.00 bh
Bata merah bakar kelas II 550.00 bh
Batako 9x19x39 cm / PSPM 2,500.00 bh
Hebel t. 10x20x60 8,590.00 bh
Batu Pecah Mesin 2/3 166,200.00 m3
Batu Pecah Mesin 10-15 cm 158,400.00 m3
Batu Belah Pondasi 137,600.00 m3
Batu koral beton kali (sirtu) 101,500.00 m3
Split pecah mesin 2/3 166,200.00 m3
Split pecah mesin 1/2 183,400.00 m3
Pasir beton 207,000.00 m3
Pasir pasang 197,000.00 m3
Pasir urug 136,400.00 m3
Tanah merah 59,000.00 m3
Paving blok 6 cm (1 m2 = 36 Bh) (Abu) 33,000.00 m2
3 Besi, kawat & paku :
Besi beton U-24 rata-rata KS 15,200.00 kg
Besi beton U-39/U-32 rata-rata KS 15,600.00 kg
Besi baja 17,000.00 kg
Besi Strip 16,000.00 kg
Kawat beton 23,500.00 kg
Kawat harmonika 15,900.00 m2
Paku 1 s/d 3 cm 21,650.00 kg
Paku 5 s/d 7 cm 18,500.00 kg
Paku 8 s/d 12 cm 18,500.00 kg
Paku skrup 275.00 bh
Pipa hitam D. 2" (medium) 205,700.00 btg
Pipa hitam D. 2 1/2" (medium) 253,100.00 btg
4 Cat
Cat besi glotex 37,150.00 kg
Cat kayu glotex 37,150.00 kg
Cat Vinilex 18,200.00 kg
Cat dasar 18,200.00 kg
Dempul kayu cap kucing 24,300.00 kg
Plamir tembok 12,200.00 kg
Plamir kayu 18,500.00 kg
Politur 35,100.00 Ltr
Politur jadi 52,900.00 Ltr
Meni kayu/besi 25,500.00 kg
Kuas 3" 13,600.00 bh
Rol cat tembok 27,800.00 bh
Amplas 2,600.00 lbr
Terpentin 15,600.00 lt
Tiner A 20,300.00 lt
5 Kayu :
Kayu balok borneo super 3,250,000.00 m3
Kayu balok kamper medan (kruing) 5,169,000.00 m3
Kayu terentang 1,550,000.00 m3
Dolken Kayu Ø 8-10 / 400 cm 20,900.00 btg

f:\460742917.xls Hal. 38
HARGA SATUAN
No. BAHAN BANGUNAN SATUAN
(Rp)
Multiplek 9 mm 120x240 134,500.00 lbr
6 Keramik :
Keramik 20x20 (KM) KW 1 DN Putih Polos 50,700.00 m2
Keramik 20x25 dinding setara IKAD (Muda) 50,500.00 m2
Keramik 20x25 dinding setara IKAD (Tua) 52,300.00 m2
Keramik 30x30 KW 1 DN Corak / Warna / Anti Slip 58,500.00 m2
7 Kusen alumunium, jendela, pintu & accessories :
Kusen alumunium 3" color setara INDAL 70,000.00 m'
Allumunium Profil Daun jendela 3" color 71,700.00 m'
Allumunium Profil Daun Pintu 3" color 71,200.00 m'
Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan 323,600.00 m2
Sealent 2,230.00 m'
Kunci 2 Slaag Lengkap Mayer 121,100.00 bh
Grendel pintu / jendela 5 cm 7,500.00 bh
Hak Kait Angin jendela Biasa Goose Bulat 11,500.00 bh
Engsel pintu Cavell (4") 29,600.00 bh
Engsel Jendela Unilon Standar Belluci (Silver) 24,200.00 bh
Kaca polos 3 mm 50,374.59 m2
Kaca polos 5 mm 69,300.00 m2
8 Lem :
Lem paralon 5,600.00 bh
Lem putih (Fox) 26,900.00 kg
9 Elektrikal
Stop Kontak Setara Broco 15,900.00 bh
Saklar tunggal Setara Broco 16,500.00 bh
Saklar seri Setara Broco 18,500.00 bh
Lampu TL 2 x 36 W V Shape 379,940.00 bh
Lampu Baret TL-E 20 W 266,200.00 bh
Lampu Dwn Light PCL 13 W 223,850.00 bh
10 Partisi :
Gypsumboard ex Elephant 9mm 2 muka + 110,110.00 m2
rangka Metal Stud 64 t. 85mm (terpasang)
11 Pipa :
Pipa GIP medium A d. 1 1/2" 359,200.00 bt
Pipa GIP medium A d. 1 1/4" 312,400.00 bt
Pipa GIP medium A d. 1" 230,300.00 bt
Pipa GIP medium A d. 1/2" 112,700.00 bt
Pipa GIP Medium A d. 2" 497,900.00 bt
Pipa GIP Medium A d. 2 1/2" 633,200.00 bt
Pipa GIP medium A d. 3/4" 158,000.00 bt
Pipa GIP medium A d. 3" 877,900.00 bt
Pipa GIP medium A d. 4" 1,262,900.00 bt
Pipa PVC d. 1 1/2" (AW) Wavin 53,900.00 bt
Pipa PVC d. 1 1/4" (AW) Wavin 37,800.00 bt
Pipa PVC d. 1" (AW) Wavin 26,000.00 bt
Pipa PVC d. 1/2" (AW) Wavin 14,100.00 bt
Pipa PVC d. 2 1/2" (AW) Wavin 87,600.00 bt
Pipa PVC d. 2" (AW) Wavin 52,000.00 bt
Pipa PVC d. 3" (AW) Wavin 127,200.00 bt
Pipa PVC d. 3/4" (AW) Wavin 19,500.00 bt
Pipa PVC d. 4" (AW) Wavin 175,500.00 bt
Pipa PVC d. 5" (AW) Wavin 313,100.00 bt
Pipa PVC d. 6" (AW) Wavin 418,600.00 bt
12 Plastic sheet 2,000.00 m2
13 Plafond :
Gypsum board (120x240x9) mm 62,200.00 lbr
Kalsiboard (120x240x6) mm 66,000.00 lbr
Hollow 40x40 jincromate 20,200.00 btg
Hollow 20x40 jincromate 16,200.00 btg
Paku skrup 370.00 bh
Ramset/dinabolt 4,800.00 bh
Cotton plaster 10,100.00 bh

f:\460742917.xls Hal. 39
HARGA SATUAN
No. BAHAN BANGUNAN SATUAN
(Rp)
Coumpond 64,300.00 zak
Profil alumunium T 7,700.00 m'
Acustic 60x120x15 mm 60,300.00 lbr
Kawat seng polos/hanger 188,400.00 kg
List plafond gypsum 13,700.00 m'
List plafond kayu 12,500.00 m2
14 Rangka atap baja ringan 212,200.00
Trusses ZAM-75 t=0.8 Rangka Utama 25,000.00 m'
Trusses ZAM-75 t=0.5 Rangka Utama 16,000.00 m'
Reng 16 - DB Roof Battens t=0.48 mm 8,000.00 m'
Foot Plate t=1.22 mm 5,000.00 m'
PLD - Diafragma Plate 1,500.00 bh
WIND Bracing 1,200.00 m'
Tensioner (Pengaku Tali Angin) 5,000.00 bh
Baut Besar 200.00 Pcs
Baut Kecil 95.00 Pcs
Dynabolt 7,500.00 Pcs
15 Readymix :
Readymix K-225 735,000.00 m3
Readymix K-250 742,250.00 m3
Readymix K-300 784,000.00 m3
16 Semen :
PC (50 kg) 60,000.00 zak
PC 1,200.00 kg
MU 380 - pas. Bata ringan/10 m2 (40 kg) 134,200.00 zak
MU 100 - plesteran/2,4 m2 (40 kg) 55,000.00 zak
MU 200 - acian plesteran/20 m2 (40 kg) 145,200.00 zak
MU 440 - perata lantai/1,2 m2 (40 kg) 50,600.00 zak
MU 450 - perekat keramik/8 m2 (40 kg) 182,600.00 zak
MU 400 - perekat keramik dinding/5 m2 (25 kg) 126,500.00 zak
MU 600 - pelapis kedap air/1,5 m2 (3 kg) 103,950.00 zak
MU 408 - pengisi nad/3 m2 (1 kg) 10,450.00 zak
16 Sanitair :
Closet Jongkok Standar Putih Porseline Toto 304,700.00 Bh
Washtafel TOTO LW 230 lengkap 1,081,000.00 Bh
Cermin 390,000.00 Bh
Urinoar TOTO warna standard lengkap 1,837,200.00 Bh
Penyekat porslin urinoar TOTO 500,900.00 Bh
Kran bebek San-Ei 1/2" 152,600.00 Bh
Kitchenzink stainless non standard Franke (1 lubang) 1,188,900.00 Bh
17 Seng :
Seng BJLS 30 lembar 90 cm ( 1 rol 50 m') 25,500.00 m'
Seng gelombang BJLS 30 / 3 x (0.3 mm) 60,600.00 lbr
Seng Plat Fumira T. 90 (0.25) / m 33,000.00 lbr
18 Solar 5,500.00 ltr
19 Sun screen Panellux ex Prometama rangka stringer 726,000.00 unit
zincalum SL-1 (45o) terpasang
20 Wire mesh (2,10 x 5,4 m) :
MK 8 1,002,650.00 lbr
MK 7 767,580.00 lbr
MK 6 563,970.00 lbr
MK 5 395,450.00 lbr
MK 4 249,810.00 lbr

f:\460742917.xls Hal. 40
DAFTAR HARGA UPAH
TAHUN ANGARAN 2008

HARGA SATUAN
No. KLASIFIKASI PEKERJA SATUAN
(Rp)

1 Mandor 55,000.00 orang


2 Kepala tukang besi beton 45,000.00 orang
3 Tukang besi beton terampil 40,000.00 orang
4 Tukang besi beton setengah terampil 35,000.00 orang
5 Kepala tukang besi profil 45,000.00 orang
6 Tukang besi profil terampil 40,000.00 orang
7 Kepala tukang batu 45,000.00 orang
8 Tukang batu terampil 40,000.00 orang
9 Tukang batu setengah terampil 35,000.00 orang
10 Kepala tukang kayu 45,000.00 orang
11 Tukang kayu terampil 40,000.00 orang
12 Tukang kayu setengah terampil 35,000.00 orang
13 Kepala tukang cat 45,000.00 orang
14 Tukang cat terampil 40,000.00 orang
15 Tukang cat setengah terampil 35,000.00 orang
16 Pekerja terampil 38,500.00 orang
17 Pekerja setengah terampil 35,000.00 orang
18 Pekerja 30,000.00 orang

f:\460742917.xls Hal. 41
ANALISA HARGA SATUAN PEKERJAAN
KAB. BOGOR TAHUN ANGGARAN 2008

A.
No.
1

10

f:\460742917.xls Hal. 42
1

f:\460742917.xls Hal. 43
1

11

12

13

14

15

f:\460742917.xls Hal. 44
1

16

17

18

19

20

f:\460742917.xls Hal. 45
1

f:\460742917.xls Hal. 46
1

21

22

23

24

25

26

f:\460742917.xls Hal. 47
1

f:\460742917.xls Hal. 48
1
27

28

29

30

31

32

33

34

35

36

f:\460742917.xls Hal. 49
1

f:\460742917.xls Hal. 50
1

37

38

39

40

41

42

f:\460742917.xls Hal. 51
1

f:\460742917.xls Hal. 52
1

43

44

45

46

47

48

49

50

f:\460742917.xls Hal. 53
1

f:\460742917.xls Hal. 54
1
51

52

53

54

55

56

57

58

59

60

f:\460742917.xls Hal. 55
1

f:\460742917.xls Hal. 56
1
61

62

63

64

65

66

67

68

f:\460742917.xls Hal. 57
1

69

70

f:\460742917.xls Hal. 58
1

71

72

73

74

75

f:\460742917.xls Hal. 59
1

76

77

78

f:\460742917.xls Hal. 60
1

79

80

81

82

83

f:\460742917.xls Hal. 61
1

84

85

f:\460742917.xls Hal. 62
1
86

87

88

89

90

f:\460742917.xls Hal. 63
1

f:\460742917.xls Hal. 64
1

91

92

93

94

95

96

97

f:\460742917.xls Hal. 65
1

98

f:\460742917.xls Hal. 66
ANALISA HARGA SATUAN PEKERJAAN
KAB. BOGOR TAHUN ANGGARAN 2008

PEK. SIPIL & ARSITEK


HARGA SAT. JUMLAH
URAIAN PEKERJAAN VOLUME SAT.
(Rp) (Rp)
2 3 4 5 6 = 3x6

1 M2 Pembersihan lahan
Pekerja 0.1000 orang 30,000.00 3,000.00
Mandor 0.0500 orang 55,000.00 2,750.00
Jumlah 5,750.00
Dibulatkan 5,750.00
1 M' Bouwplank
Kayu balok borneo super 0.0100 m3 3,250,000.00 32,500.00
Paku 5 s/d 7 cm 0.0390 kg 18,500.00 721.50
Ongkos pasang 0.1550 m' 33,221.50 5,149.33
Jumlah 38,370.83
Dibulatkan 38,370.00
1 M' Pagar proyek
Seng gelombang BJLS 30 / 3 x (0.3 mm) 1.0000 lbr 60,600.00 60,600.00
Kayu balok borneo super 0.0210 m3 3,250,000.00 68,250.00
Paku 5 s/d 7 cm 0.2000 kg 18,500.00 3,700.00
Cat besi glotex - kg 37,150.00 -
Tukang kayu terampil 0.1310 orang 40,000.00 5,240.00
Pekerja 0.0131 orang 30,000.00 393.00
Jumlah 138,183.00
Dibulatkan 138,180.00
1 M3 Galian tanah max kedalaman 1 m'
Pekerja 0.4000 orang 30,000 12,000.00
Mandor 0.0400 orang 55,000 2,200.00
Jumlah 14,200.00
Dibulatkan 14,200.00
1 M3 Galian tanah max kedalaman 2 m'
Pekerja 0.5260 orang 30,000.00 15,780.00
Mandor 0.0520 orang 55,000.00 2,860.00
Jumlah 18,640.00
Dibulatkan 18,640.00
1 M3 Urugan tanah padat (urugan kembali)
Pekerja 0.1920 orang 30,000.00 5,760.00
Mandor 0.0190 orang 55,000.00 1,045.00
Jumlah 6,805.00
Dibulatkan 6,800.00
1 M3 Pemadatan tanah
Pekerja 0.5000 orang 30,000.00 15,000.00
Mandor 0.0500 orang 55,000.00 2,750.00
Jumlah 17,750.00
Dibulatkan 17,750.00
1 M3 Urugan pasir
Pasir urug 1.2000 m3 136,400.00 163,680.00
Pekerja 0.3000 orang 30,000.00 9,000.00
Mandor 0.0100 orang 55,000.00 550.00
Jumlah 173,230.00
Dibulatkan 173,230.00
1 M3 Pondasi batu kosong (anstamping batu)
Batu Belah Pondasi 1.2000 m3 137,600.00 165,120.00
Pasir urug 0.3000 m3 136,400.00 40,920.00
Pekerja 0.7800 orang 30,000.00 23,400.00
Tukang batu terampil 0.3900 orang 40,000.00 15,600.00
Kepala tukang batu 0.0390 orang 45,000.00 1,755.00
Mandor 0.0390 orang 55,000.00 2,145.00
Jumlah 248,940.00
Dibulatkan 248,940.00
1 M3 Pas. Batu belah 1pc:4ps
Batu Belah Pondasi 1.1000 m³ 137,600.00 151,360.00
PC 163.0000 kg 1,200.00 195,600.00
Pasir pasang 0.5200 m³ 197,000.00 102,440.00
Pekerja 1.5000 org 30,000.00 45,000.00

f:\460742917.xls Hal. 67
2 3 4 5 6 = 3x6
Tukang batu terampil 0.6000 org 40,000.00 24,000.00

f:\460742917.xls Hal. 68
2 3 4 5 6 = 3x6
Kepala tukang batu 0.0600 org 45,000.00 2,700.00
Mandor 0.0750 org 55,000.00 4,125.00
Jumlah 525,225.00
Dibulatkan 525,220.00
1 M3 Lantai kerja t. 5 cm/beton tumbuk 1pc:3ps:5kr
PC 218.0000 kg 1,200.00 261,600.00
Pasir beton 0.5200 m3 207,000.00 107,640.00
Split pecah mesin 1/2 0.8700 m3 183,400.00 159,558.00
Pekerja 1.6500 orang 30,000.00 49,500.00
Tukang batu terampil 0.2500 orang 40,000.00 10,000.00
Kepala tukang batu 0.0250 orang 45,000.00 1,125.00
Mandor 0.0800 orang 55,000.00 4,400.00
Jumlah 593,823.00
Dibulatkan 593,820.00
1 M2 Screeding t. 2 cm (MU 440)
MU 440 - perata lantai/1,2 m2 (40 kg) 0.8333 zak 50,600.00 42,166.67
Pekerja 0.0495 orang 30,000.00 1,485.00
Tukang batu terampil 0.0075 orang 40,000.00 300.00
Kepala tukang batu 0.0008 orang 45,000.00 33.75
Mandor 0.0024 orang 55,000.00 132.00
Jumlah 44,117.42
Dibulatkan 44,110.00
1 M2 Screeding t. 2 cm (MU 440) (Lt. 2)
Material 1.0000 m2 42,166.67 42,166.67
Upah kerja 1.0900 m2 1,950.75 2,126.32
Jumlah 44,292.98
Dibulatkan 44,290.00
1 M3 Beton site mix K-175
PC (50 kg) 6.8000 zak 60,000.00 408,000.00
Batu Pecah Mesin 2/3 0.8300 m3 166,200.00 137,946.00
Pasir beton 0.5400 m3 207,000.00 111,780.00
Pekerja 6.0000 orang 30,000.00 180,000.00
Tukang batu terampil 1.0000 orang 40,000.00 40,000.00
Kepala tukang batu 0.1000 orang 45,000.00 4,500.00
Mandor 0.3000 orang 55,000.00 16,500.00
Jumlah 898,726.00
Dibulatkan 898,720.00
1 M3 Beton site mix K-175 (Lt. 2)
Material 1.0000 m3 657,726.00 657,726.00
Upah kerja 1.0900 m3 241,000.00 262,690.00
Jumlah 920,416.00
Dibulatkan 920,410.00
1 M3 Beton site mix K-225
PC 388.0000 kg 1,200.00 465,600.00
Pasir beton 0.6500 m3 207,000.00 134,550.00
Split pecah mesin 1/2 0.6500 m3 183,400.00 119,210.00
Pekerja 6.0000 orang 30,000.00 180,000.00
Tukang batu terampil 1.0000 orang 40,000.00 40,000.00
Kepala tukang batu 0.1000 orang 45,000.00 4,500.00
Mandor 0.3000 orang 55,000.00 16,500.00
Jumlah 960,360.00
Dibulatkan 960,360.00
1 M3 Beton site mix K-225 (Lt. 2)
Material 1.0000 m3 719,360.00 719,360.00
Upah kerja 1.0900 m3 241,000.00 262,690.00
Jumlah 982,050.00
Dibulatkan 982,050.00
1 M3 Readymix K-225
Readymix K-225 1.0000 m3 735,000.00 735,000.00
Concrete pump 1.0000 m3 30,000.00 30,000.00
Vibrator 1.0000 m3 1,000.00 1,000.00
Pekerja 2.5000 orang 30,000.00 75,000.00
Tukang batu terampil 0.2500 orang 40,000.00 10,000.00
Kepala tukang batu 0.1000 orang 45,000.00 4,500.00
Mandor 0.0100 orang 55,000.00 550.00
Jumlah 856,050.00
Dibulatkan 856,050.00

f:\460742917.xls Hal. 69
2 3 4 5 6 = 3x6
1 M3 Readymix K-225 (Lt. 2)
Material 1.0000 m3 735,000.00 735,000.00

Alat kerja 1.0000 m3 31,000.00 31,000.00


Upah kerja 1.0900 m3 90,050.00 98,154.50
Jumlah 864,154.50
Dibulatkan 864,150.00
1 M3 Readymix K-300
Readymix K-300 1.0000 m3 784,000.00 784,000.00
Concrete pump 1.0000 m3 30,000.00 30,000.00
Vibrator 1.0000 m3 1,000.00 1,000.00
Pekerja 2.5000 orang 30,000.00 75,000.00
Tukang batu terampil 0.2500 orang 40,000.00 10,000.00
Kepala tukang batu 0.1000 orang 45,000.00 4,500.00
Mandor 0.0100 orang 55,000.00 550.00
Jumlah 905,050.00
Dibulatkan 905,050.00
1 M3 Readymix K-300 (Lt. 2)
Material 1.0000 m3 784,000.00 784,000.00
Alat kerja 1.0000 m3 31,000.00 31,000.00
Upah kerja 1.0900 m3 90,050.00 98,154.50
Jumlah 913,154.50
Dibulatkan 913,150.00
1 Kg Besi beton < d 12
Besi beton U-24 rata-rata KS 1.0500 kg 15,200.00 15,960.00
Kawat beton 0.0150 kg 23,500.00 352.50
Pekerja 0.0070 orang 30,000.00 210.00
Tukang besi beton terampil 0.0070 orang 40,000.00 280.00
Kepala tukang besi profil 0.0007 orang 45,000.00 31.50
Mandor 0.0003 orang 55,000.00 16.50
Jumlah 16,850.50
Dibulatkan 16,850.00
1 Kg Besi beton < d 12 (Lt. 2)
Material 1.0000 kg 16,312.50 16,312.50
Upah kerja 1.0900 kg 538.00 586.42
Jumlah 16,898.92
Dibulatkan 16,890.00
1 Kg Besi beton > D 13
Besi beton U-39/U-32 rata-rata KS 1.0500 kg 15,600.00 16,380.00
Kawat beton 0.0150 kg 23,500.00 352.50
Pekerja 0.0070 orang 30,000.00 210.00
Tukang besi beton terampil 0.0070 orang 40,000.00 280.00
Kepala tukang besi profil 0.0007 orang 45,000.00 31.50
Mandor 0.0003 orang 55,000.00 16.50
Jumlah 17,270.50
Dibulatkan 17,270.00
1 Kg Besi beton > D 13 (Lt. 2)
Material 1.0000 kg 16,732.50 16,732.50
Upah kerja 1.0900 kg 538.00 586.42
Jumlah 17,318.92
Dibulatkan 17,310.00
1 M2 Wire Mesh M-8 (1,5 lapis)
MK 8 0.1323 lbr 1,002,650.00 132,625.66
Pekerja 0.0572 orang 30,000.00 1,717.07
Tukang besi beton terampil 0.0572 orang 40,000.00 2,289.42
Kepala tukang besi profil 0.0057 orang 45,000.00 257.56
Mandor 0.0025 orang 55,000.00 134.91
Jumlah 137,024.62
Dibulatkan 137,020.00
1 M2 Wire Mesh M-8 (1,5 lapis) (Lt. 2)
Material 1.0000 m2 132,625.66 132,625.66
Upah kerja 1.0900 m2 4,398.96 4,794.86
Jumlah 137,420.52
Dibulatkan 137,420.00
1 M2 Wire Mesh M-6 (1,5 lapis)
MK 6 0.1323 m2 563,970.00 74,599.21
Pekerja 0.0322 orang 30,000.00 965.16

f:\460742917.xls Hal. 70
2 3 4 5 6 = 3x6
Tukang besi beton terampil 0.0322 orang 40,000.00 1,286.88
Kepala tukang besi profil 0.0032 orang 45,000.00 144.77
Mandor 0.0014 orang 55,000.00 75.83
Jumlah 77,071.85
Dibulatkan 77,070.00

f:\460742917.xls Hal. 71
2 3 4 5 6 = 3x6
1 M2 Wire Mesh M-6 (1,5 lapis) (Lt. 2)
Material 1.0000 m2 74,599.21 74,599.21
Upah kerja 1.0900 m2 2,472.65 2,695.19
Jumlah 77,294.39
Dibulatkan 77,290.00
1 M2 Wire Mesh M-4 (1 lapis)
MK 4 0.0882 lbr 249,810.00 22,029.10
Pekerja 0.0096 orang 30,000.00 286.86
Tukang besi beton terampil 0.0096 orang 40,000.00 382.48
Kepala tukang besi profil 0.0010 orang 45,000.00 43.03
Mandor 0.0004 orang 55,000.00 22.54
Jumlah 22,764.01
Dibulatkan 22,760.00
1 M2 Wire Mesh M-4 (1 lapis) (Lt. 2)
Material 1.0000 m2 22,029.10 22,029.10
Upah kerja 1.0900 m2 734.91 801.05
Jumlah 22,830.15
Dibulatkan 22,830.00
1 M2 Wire Mesh M-4 (1 lapis) (Lt. 3)
Material 1.0000 m2 22,029.10 22,029.10
Upah kerja 1.1200 m2 734.91 823.10
Jumlah 22,852.20
Dibulatkan 22,850.00
1 M' Pipa Hitam t. 3,6 mm; D 2" (medium)
Pipa hitam D. 2" (medium) 0.1833 btg 205,700.00 37,711.67
Tukang besi profil terampil 0.0305 orang 40,000.00 1,221.60
Pekerja 0.3054 orang 30,000.00 9,162.00
Kepala tukang besi profil 0.0305 orang 45,000.00 1,374.30
Mandor 0.0015 orang 55,000.00 83.99
Jumlah 49,553.55
Dibulatkan 49,550.00
1 M' Pipa Hitam t. 3,6 mm; D 2,5" (medium)
Pipa hitam D. 2 1/2" (medium) 0.1833 btg 253,100.00 46,401.67
Tukang besi profil terampil 0.0391 orang 40,000.00 1,564.80
Pekerja 0.3912 orang 30,000.00 11,736.00
Kepala tukang besi profil 0.0391 orang 45,000.00 1,760.40
Mandor 0.0020 orang 55,000.00 107.58
Jumlah 61,570.45
Dibulatkan 61,570.00
1 Kg Baja Profil
Besi baja 1.1000 kg 17,000.00 18,700.00
Meni kayu/besi 0.0800 kg 5,100.00 408.00
Tukang besi profil terampil 0.0060 orang 40,000.00 240.00
Pekerja 0.0600 orang 30,000.00 1,800.00
Kepala tukang besi profil 0.0060 orang 45,000.00 270.00
Mandor 0.0003 orang 55,000.00 16.50
Jumlah 21,434.50
Dibulatkan 21,430.00
1 M2 Bekisting multiplex 9 mm
Kaso 5/7 (2x pakai) 50% 0.0170 m3 3,250,000.00 27,625.00
Multiplek 9 mm 120x240 0.3470 lbr 134,500.00 35,003.63
Paku 1 s/d 3 cm 0.4000 kg 21,650.00 8,660.00
Pekerja 0.1200 orang 30,000.00 3,600.00
Tukang kayu terampil 0.1500 orang 40,000.00 6,000.00
Kepala tukang kayu 0.1500 orang 45,000.00 6,750.00
Mandor 0.0500 orang 55,000.00 2,750.00
Tukang kayu setengah terampil 0.1200 orang 35,000.00 4,200.00
Jumlah 94,588.63
Dibulatkan 94,580.00
1 M2 Bekisting multiplex 9 mm (Lt. 2)
Material 1.0000 m2 71,288.63 71,288.63
Upah kerja 1.0900 m2 23,300.00 25,397.00
Jumlah 96,685.63
Dibulatkan 96,680.00
1 M' Sloof praktis 10/15
Beton site mix K-175 0.0150 m3 898,720.00 13,480.80
Besi beton d. 8 mm 0.9875 kg 16,850.00 16,639.38
Besi beton d. 10 mm 2.4800 kg 16,850.00 41,788.00

f:\460742917.xls Hal. 72
2 3 4 5 6 = 3x6
Bekisting multiplex 9 mm 0.3000 m2 94,580.00 28,374.00
Jumlah 100,282.18
Dibulatkan 100,280.00

f:\460742917.xls Hal. 73
2 3 4 5 6 = 3x6
1 M3 Sloof type S-1 20/40
Readymix K-300 1.0000 m3 905,050.0 905,050.00
Besi beton D. 16 mm 118.5000 kg 17,270.00 2,046,495.00
Besi beton d. 8 mm 35.5500 kg 16,850.00 599,017.50
Bekisting multiplex 9 mm 10.0000 m2 94,580.00 945,800.00
Jumlah 4,496,362.50
Dibulatkan 4,496,360.00
1 M3 Sloof type S-2 20/30
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton D. 13 mm 104.0000 kg 17,270.00 1,796,080.00
Besi beton d. 8 mm 39.5000 kg 16,850.00 665,575.00
Bekisting multiplex 9 mm 10.0000 m2 94,580.00 945,800.00
Jumlah 4,312,505.00
Dibulatkan 4,312,500.00
1 M3 Sloof type S-3 20/30
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton D. 13 mm 104.0000 kg 17,270.00 1,796,080.00
Besi beton d. 8 mm 39.5000 kg 16,850.00 665,575.00
Bekisting multiplex 9 mm 10.0000 m2 94,580.00 945,800.00
Jumlah 4,312,505.00
Dibulatkan 4,312,500.00
1 M3 Pondasi tapak type P-1 (4,4x2,4)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton D. 13 mm 43.3333 kg 17,270.00 748,366.67
Besi beton D. 16 mm 65.8333 kg 17,270.00 1,136,941.67
Pas. Batako PC pres 10x20x40 ad 1:4 1.2879 m2 63,660.00 81,986.36
Jumlah 2,872,344.70
Dibulatkan 2,872,340.00
1 M3 Pondasi tapak type P-2 (2,4x2,4)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton D. 13 mm 49.1111 kg 17,270.00 848,148.89
Besi beton D. 16 mm 74.6111 kg 17,270.00 1,288,533.89
Pas. Batako PC pres 10x20x40 ad 1:4 1.7778 m2 63,660.00 113,173.33
Jumlah 3,154,906.11
Dibulatkan 3,154,900.00
1 M3 Pondasi tapak type P-3 (2,0x2,0)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton D. 13 mm 53.2381 kg 17,270.00 919,421.90
Besi beton d. 12 mm 45.4571 kg 16,850.00 765,952.86
Pas. Batako PC pres 10x20x40 ad 1:4 1.7143 m2 63,660.00 109,131.43
Jumlah 2,699,556.19
Dibulatkan 2,699,550.00
1 M3 Pondasi tapak type P-4 (1,5x1,5)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton D. 13 mm 67.7926 kg 17,270.00 1,170,778.07
Besi beton d. 12 mm 57.8844 kg 16,850.00 975,352.89
Pas. Batako PC pres 10x20x40 ad 1:4 2.6667 m2 63,660.00 169,760.00
Jumlah 3,220,940.96
Dibulatkan 3,220,940.00
1 M3 Pondasi tapak type P-5 (1,0x1,0)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton d. 10 mm 108.6476 kg 16,850.00 1,830,712.38
Besi beton d. 8 mm 69.2190 kg 16,850.00 1,166,340.95
Pas. Batako PC pres 10x20x40 ad 1:4 4.5714 m2 63,660.00 291,017.14
Jumlah 4,193,120.48
Dibulatkan 4,193,120.00
1 M2 Rabat beton t. 6 cm
Readymix K-225 0.0600 m3 856,050.00 51,363.00
Wire Mesh M-4 (1 lapis) 1.0000 m2 22,760.00 22,760.00
Plastic sheet 1.0000 m2 2,000.00 2,000.00
Jumlah 76,123.00
Dibulatkan 76,120.00
1 M' Kolom Praktis 10x10
Beton site mix K-175 0.0100 m3 898,720.00 8,987.20
Besi beton d. 8 mm 0.7900 kg 16,850.00 13,311.50
Besi beton d. 10 mm 2.4800 kg 16,850.00 41,788.00
Bekisting multiplex 9 mm 0.2000 m2 94,580.00 18,916.00

f:\460742917.xls Hal. 74
2 3 4 5 6 = 3x6
Jumlah 83,002.70
Dibulatkan 83,000.00

f:\460742917.xls Hal. 75
2 3 4 5 6 = 3x6
1 M' Kolom Praktis 10x10 (Lt. 2)
Beton site mix K-175 (Lt. 2) 0.0100 m3 920,410.00 9,204.10
Besi beton d. 8 mm 0.7900 kg 16,890.00 13,343.10
Besi beton d. 10 mm 2.4800 kg 16,890.00 41,887.20
Bekisting multiplex 9 mm (Lt. 2) 0.2000 m2 96,680.00 19,336.00
Jumlah 83,770.40
Dibulatkan 83,770.00
1 M3 Kolom K1-1 (40x40)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton d. D. 16 mm 79.0000 kg 17,270.00 1,364,330.00
Besi beton d. 8 mm 23.7000 kg 16,850.00 399,345.00
Bekisting multiplex 9 mm 10.0000 m2 94,580.00 945,800.00
Jumlah 3,614,525.00
Dibulatkan 3,614,520.00
1 M3 Kolom K1-2 (40x40)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton d. D. 16 mm 59.2500 kg 16,890.00 1,000,732.50
Besi beton d. 8 mm 23.7000 kg 17,310.00 410,247.00
Bekisting multiplex 9 mm (Lt. 2) 10.0000 m2 96,680.00 966,800.00
Jumlah 3,290,929.50
Dibulatkan 3,290,920.00
1 M3 Kolom K2-1 (30x30)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton d. D. 16 mm 140.4444 kg 17,270.00 2,425,475.56
Besi beton d. 8 mm 31.6000 kg 16,850.00 532,460.00
Bekisting multiplex 9 mm 13.3333 m2 94,580.00 1,261,066.67
Jumlah 5,124,052.22
Dibulatkan 5,124,050.00
1 M3 Kolom K2-2 (30x30)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton d. D. 16 mm 105.3333 kg 17,310.00 1,823,320.00
Besi beton d. 8 mm 31.6000 kg 16,890.00 533,724.00
Bekisting multiplex 9 mm (Lt. 2) 13.3333 m2 96,680.00 1,289,066.67
Jumlah 4,559,260.67
Dibulatkan 4,559,260.00
1 M' Balok lintel 10x15
Beton site mix K-175 0.0150 m3 898,720.00 13,480.80
Besi beton d. 8 mm 0.5550 kg 16,850.00 9,351.75
Besi beton d. 10 mm 1.5800 kg 16,850.00 26,623.00
Bekisting multiplex 9 mm 0.3000 m2 94,580.00 28,374.00
Jumlah 77,829.55
Dibulatkan 77,820.00
1 M' Balok lintel 10x15 (Lt.2)
Beton site mix K-175 (Lt. 2) 0.0150 m3 920,410.00 13,806.15
Besi beton d. 8 mm 0.5550 kg 16,890.00 9,373.95
Besi beton d. 10 mm 1.5800 kg 16,890.00 26,686.20
Bekisting multiplex 9 mm (Lt. 2) 0.3000 m2 96,680.00 29,004.00
Jumlah 78,870.30
Dibulatkan 78,870.00
1 M3 Balok B1 (30x60)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 19 mm 117.6944 kg 17,310.00 2,037,290.83
Besi beton d. 12 mm 9.8667 kg 16,890.00 166,648.00
Besi beton d. 10 mm 37.2000 kg 16,890.00 628,308.00
Bekisting multiplex 9 mm (Lt. 2) 7.0000 m2 96,680.00 676,760.00
Jumlah 4,422,156.83
Dibulatkan 4,422,150.00
1 M3 Balok B2 (30x60)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00
Besi beton D. 19 mm 86.7222 kg 17,310.00 1,501,161.67
Besi beton d. 12 mm 9.8667 kg 16,890.00 166,648.00
Besi beton d. 10 mm 37.2000 kg 16,890.00 628,308.00
Bekisting multiplex 9 mm (Lt. 2) 7.0000 m2 96,680.00 676,760.00
Jumlah 2,972,877.67
Dibulatkan 2,972,870.00
1 M3 Balok B3 (25x55)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00

f:\460742917.xls Hal. 76
2 3 4 5 6 = 3x6
Besi beton D. 19 mm 113.5273 kg 17,310.00 1,965,157.09
Besi beton d. 12 mm 12.9164 kg 16,890.00 218,157.38

f:\460742917.xls Hal. 77
2 3 4 5 6 = 3x6
Besi beton d. 10 mm 50.5018 kg 16,890.00 852,975.71
Bekisting multiplex 9 mm (Lt. 2) 8.0727 m2 96,680.00 780,471.27
Jumlah 4,729,911.45
Dibulatkan 4,729,910.00
1 M3 Balok B4 (25x50)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 19 mm 107.0400 kg 17,310.00 1,852,862.40
Besi beton d. 12 mm 14.2080 kg 16,890.00 239,973.12
Besi beton d. 8 mm 28.4400 kg 16,890.00 480,351.60
Bekisting multiplex 9 mm (Lt. 2) 8.0800 m2 96,680.00 781,174.40
Jumlah 4,267,511.52
Dibulatkan 4,267,510.00
1 M3 Balok B5 (20x40)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 19 mm 167.2500 kg 17,310.00 2,895,097.50
Besi beton d. 8 mm 35.5500 kg 16,890.00 600,439.50
Bekisting multiplex 9 mm (Lt. 2) 9.5000 m2 96,680.00 918,460.00
Jumlah 5,327,147.00
Dibulatkan 5,327,140.00
1 M3 Balok B6 (20x40)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 19 mm 111.5000 kg 17,310.00 1,930,065.00
Besi beton d. 8 mm 35.5500 kg 16,890.00 600,439.50
Bekisting multiplex 9 mm (Lt. 2) 9.5000 m2 96,680.00 918,460.00
Jumlah 4,362,114.50
Dibulatkan 4,362,110.00
1 M3 Balok B7 (20x40)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 16 mm 118.5000 kg 17,310.00 2,051,235.00
Besi beton d. 8 mm 35.5500 kg 16,890.00 600,439.50
Bekisting multiplex 9 mm (Lt. 2) 9.5000 m2 96,680.00 918,460.00
Jumlah 4,483,284.50
Dibulatkan 4,483,280.00
1 M3 Balok B8 (20x40)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 16 mm 98.7500 kg 17,310.00 1,709,362.50
Besi beton d. 8 mm 35.5500 kg 16,890.00 600,439.50
Bekisting multiplex 9 mm (Lt. 2) 9.5000 m2 96,680.00 918,460.00
Jumlah 4,141,412.00
Dibulatkan 4,141,410.00
1 M3 Balok B9 (20x40)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 16 mm 79.0000 kg 17,310.00 1,367,490.00
Besi beton d. 8 mm 35.5500 kg 16,890.00 600,439.50
Bekisting multiplex 9 mm (Lt. 2) 9.5000 m2 96,680.00 918,460.00
Jumlah 3,799,539.50
Dibulatkan 3,799,530.00
1 M3 Balok B10 (20x30)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 16 mm 105.3333 kg 17,310.00 1,823,320.00
Besi beton d. 8 mm 39.5000 kg 16,890.00 667,155.00
Bekisting multiplex 9 mm (Lt. 2) 9.3333 m2 96,680.00 902,346.67
Jumlah 4,305,971.67
Dibulatkan 4,305,970.00
1 M3 Balok B10 (20x30) (Lt. 2)
Readymix K-300 (Lt. 3) 1.0000 m3 915,850.00 915,850.00
Besi beton D. 16 mm 105.3333 kg 17,330.00 1,825,426.67
Besi beton d. 8 mm 39.5000 kg 16,910.00 667,945.00
Bekisting multiplex 9 mm (Lt. 3) 9.3333 m2 97,380.00 908,880.00
Jumlah 4,318,101.67
Dibulatkan 4,318,100.00
1 M3 Balok B11 (20x30 + 8x70)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 16 mm 57.9333 kg 17,310.00 1,002,826.00
Besi beton d. 8 mm 26.8600 kg 16,890.00 453,665.40
Bekisting multiplex 9 mm (Lt. 2) 8.0667 m2 96,680.00 779,885.33
Jumlah 3,149,526.73

f:\460742917.xls Hal. 78
2 3 4 5 6 = 3x6
Dibulatkan 3,149,520.00

f:\460742917.xls Hal. 79
2 3 4 5 6 = 3x6
1 M3 Balok B12 (20x30)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 13 mm 69.3333 kg 17,310.00 1,200,160.00
Besi beton d. 8 mm 39.5000 kg 16,890.00 667,155.00
Bekisting multiplex 9 mm (Lt. 2) 9.3333 m2 96,680.00 902,346.67
Jumlah 3,682,811.67
Dibulatkan 3,682,810.00
1 M3 Balok B13 (25x60) (Lt. 2)
Readymix K-300 (Lt. 3) 1.0000 m3 915,850.00 915,850.00
Besi beton D. 16 mm 57.9333 kg 17,330.00 1,003,984.67
Besi beton D. 12 mm 11.8400 kg 16,910.00 200,214.40
Besi beton d. 8 mm 26.8600 kg 16,910.00 454,202.60
Bekisting multiplex 9 mm (Lt. 3) 8.0667 m2 97,380.00 785,532.00
Jumlah 3,359,783.67
Dibulatkan 3,359,780.00
1 M3 Balok B14 (25x60) (Lt. 2)
Readymix K-300 (Lt. 3) 1.0000 m3 915,850.00 915,850.00
Besi beton D. 16 mm 79.0000 kg 17,330.00 1,369,070.00
Besi beton D. 12 mm 11.8400 kg 16,910.00 200,214.40
Besi beton d. 8 mm 26.8600 kg 16,910.00 454,202.60
Bekisting multiplex 9 mm (Lt. 3) 8.0667 m2 97,380.00 785,532.00
Jumlah 3,724,869.00
Dibulatkan 3,724,860.00
1 M3 Balok B15 (20x40) (Lt. 2)
Readymix K-300 (Lt. 3) 1.0000 m3 915,850.00 915,850.00
Besi beton D. 16 mm 118.5000 kg 17,330.00 2,053,605.00
Besi beton d. 8 mm 35.5500 kg 16,910.00 601,150.50
Bekisting multiplex 9 mm (Lt. 3) 9.5000 m2 97,380.00 925,110.00
Jumlah 4,495,715.50
Dibulatkan 4,495,710.00
1 M3 Balok B16 (20x40) (Lt. 2)
Readymix K-300 (Lt. 3) 1.0000 m3 915,850.00 915,850.00
Besi beton D. 16 mm 108.6250 kg 17,330.00 1,882,471.25
Besi beton d. 8 mm 35.5500 kg 16,910.00 601,150.50
Bekisting multiplex 9 mm (Lt. 3) 9.5000 m2 97,380.00 925,110.00
Jumlah 4,324,581.75
Dibulatkan 4,324,580.00
1 M3 Balok B17 (20x30) (Lt. 2)
Readymix K-300 (Lt. 3) 1.0000 m3 915,850.00 915,850.00
Besi beton D. 16 mm 158.0000 kg 17,330.00 2,738,140.00
Besi beton d. 8 mm 39.5000 kg 16,910.00 667,945.00
Bekisting multiplex 9 mm (Lt. 3) 9.3333 m2 97,380.00 908,880.00
Jumlah 5,230,815.00
Dibulatkan 5,230,810.00
1 M3 Balok B18 (20x30) (Lt. 2)
Readymix K-300 (Lt. 3) 1.0000 m3 915,850.00 915,850.00
Besi beton D. 16 mm 131.6667 kg 17,330.00 2,281,783.33
Besi beton d. 8 mm 39.5000 kg 16,910.00 667,945.00
Bekisting multiplex 9 mm (Lt. 3) 9.3333 m2 97,380.00 908,880.00
Jumlah 4,774,458.33
Dibulatkan 4,774,450.00
1 M3 Balok bordes (20x30)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton D. 13 mm 104.0000 kg 17,270.00 1,796,080.00
Besi beton d. 8 mm 39.5000 kg 16,850.00 665,575.00
Bekisting multiplex 9 mm 13.3333 m2 94,580.00 1,261,066.67
Jumlah 4,627,771.67
Dibulatkan 4,627,770.00
1 M3 RB1 (20x25) (Lt. 2)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Besi beton D. 13 mm 104.0000 kg 17,310.00 1,800,240.00
Besi beton d. 8 mm 42.6600 kg 16,890.00 720,527.40
Bekisting multiplex 9 mm (Lt. 2) 14.0000 m2 96,680.00 1,353,520.00
Jumlah 4,787,437.40
Dibulatkan 4,787,430.00
1 M3 RB2 (20x25) (Lt. 2)
Readymix K-300 (Lt. 3) 1.0000 m3 915,850.00 915,850.00
Besi beton D. 13 mm 83.2000 kg 17,330.00 1,441,856.00
Besi beton d. 8 mm 42.6600 kg 16,910.00 721,380.60

f:\460742917.xls Hal. 80
2 3 4 5 6 = 3x6
Bekisting multiplex 9 mm (Lt. 3) 14.0000 m2 97,380.00 1,363,320.00
Jumlah 4,442,406.60
Dibulatkan 4,442,400.00

f:\460742917.xls Hal. 81
2 3 4 5 6 = 3x6
1 M3 Plat tangga
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Besi beton D. 13 mm 97.0667 kg 17,270.00 1,676,341.33
Besi beton d. 12 mm 82.8800 m3 16,850.00 1,396,528.00
Besi beton d. 8 mm 15.8000 kg 16,850.00 266,230.00
Bekisting multiplex 9 mm 3.1106 m2 94,580.00 294,199.48
Jumlah 4,538,348.82
Dibulatkan 4,538,340.00
1 M3 Plat bordes
Readymix K-300 1.0000 kg 905,050.00 905,050.00
Besi beton D. 13 mm 97.0667 kg 17,270.00 1,676,341.33
Besi beton d. 12 mm 82.8800 kg 16,850.00 1,396,528.00
Bekisting multiplex 9 mm 6.6667 kg 94,580.00 630,533.33
Jumlah 4,608,452.67
Dibulatkan 4,608,450.00
1 M3 Plat lantai S1 t. 12 cm (M6)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Bekisting multiplex 9 mm 8.3333 m2 94,580.00 788,166.67
Wire Mesh M-6 (1,5 lapis) 8.3333 m2 77,070.00 642,250.00
Jumlah 2,335,466.67
Dibulatkan 2,335,460.00
1 M3 Plat lantai S1 t. 12 cm (M6) (Lt. 2)
Readymix K-300 (Lt. 2) 1.0000 m3 913,150.00 913,150.00
Bekisting multiplex 9 mm (Lt. 2) 8.3333 m2 96,680.00 805,666.67
Wire Mesh M-6 (1,5 lapis) (Lt. 2) 8.3333 m2 77,290.00 644,083.33
Jumlah 2,362,900.00
Dibulatkan 2,362,900.00
1 M3 Plat lantai S2 t. 10 cm (M4)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Bekisting multiplex 9 mm 10.0000 m2 94,580.00 945,800.00
Wire Mesh M-4 (1 lapis) 10.0000 m2 22,760.00 227,600.00
Jumlah 2,078,450.00
Dibulatkan 2,078,450.00
1 M3 Plat lantai S3 t. 10 cm (M6)
Readymix K-300 1.0000 m3 905,050.00 905,050.00
Bekisting multiplex 9 mm 10.0000 m2 94,580.00 945,800.00
Wire Mesh M-6 (1,5 lapis) 10.0000 m2 77,070.00 770,700.00
Jumlah 2,621,550.00
Dibulatkan 2,621,550.00
1 M3 Plat canopy type A (1,85x0,75x0,08)
Beton site mix K-225 1.0000 m3 960,360.00 960,360.00
Besi beton d. 12 mm 39.4667 kg 16,850.00 665,013.33
Besi beton d. 10 mm 81.9778 kg 16,850.00 1,381,325.56
Besi beton d. 8 mm 17.5556 kg 16,850.00 295,811.11
Bekisting multiplex 9 mm 12.7778 m2 94,580.00 1,208,522.22
Jumlah 4,511,032.22
Dibulatkan 4,511,030.00
1 M3 Plat canopy type A (1,85x0,75x0,08) (Lt. 2)
Beton site mix K-225 (Lt. 2) 1.0000 m3 982,050.00 982,050.00
Besi beton d. 12 mm 39.4667 kg 16,890.00 666,592.00
Besi beton d. 10 mm 81.9778 kg 16,890.00 1,384,604.67
Besi beton d. 8 mm 17.5556 kg 16,890.00 296,513.33
Bekisting multiplex 9 mm (Lt. 2) 12.7778 m2 96,680.00 1,235,355.56
Jumlah 4,565,115.56
Dibulatkan 4,565,110.00
1 M3 Plat canopy type B (2,85x0,75x0,08)
Beton site mix K-225 1.0000 m3 960,360.00 960,360.00
Besi beton d. 12 mm 39.4667 kg 16,850.00 665,013.33
Besi beton d. 10 mm 81.9778 kg 16,850.00 1,381,325.56
Besi beton d. 8 mm 17.5556 kg 16,850.00 295,811.11
Bekisting multiplex 9 mm 12.7778 m2 94,580.00 1,208,522.22
Jumlah 4,511,032.22
Dibulatkan 4,511,030.00
1 M3 Plat canopy type C (0,75x0,75x0,08)
Beton site mix K-225 1.0000 m3 960,360.00 960,360.00
Besi beton d. 12 mm 39.4667 kg 16,850.00 665,013.33
Besi beton d. 10 mm 81.9778 kg 16,850.00 1,381,325.56
Besi beton d. 8 mm 17.5556 kg 16,850.00 295,811.11

f:\460742917.xls Hal. 82
2 3 4 5 6 = 3x6
Bekisting multiplex 9 mm 12.7778 m2 94,580.00 1,208,522.22
Jumlah 4,511,032.22
Dibulatkan 4,511,030.00
1 M3 Plat canopy type C (0,75x0,75x0,08) (Lt. 2)
Beton site mix K-225 1.0000 m3 982,050.00 982,050.00
Besi beton d. 12 mm 39.4667 kg 16,890.00 666,592.00
Besi beton d. 10 mm 81.9778 kg 16,890.00 1,384,604.67
Besi beton d. 8 mm 17.5556 kg 16,890.00 296,513.33
Bekisting multiplex 9 mm 12.7778 m2 96,680.00 1,235,355.56
Jumlah 4,565,115.56
Dibulatkan 4,565,110.00
1 M3 Plat canopy type D (3,70x0,75x0,08)
Beton site mix K-225 1.0000 m3 960,360.00 960,360.00
Besi beton d. 12 mm 39.4667 kg 16,850.00 665,013.33
Besi beton d. 10 mm 81.9778 kg 16,850.00 1,381,325.56
Besi beton d. 8 mm 17.5556 kg 16,850.00 295,811.11
Bekisting multiplex 9 mm 12.7778 m2 94,580.00 1,208,522.22
Jumlah 4,511,032.22
Dibulatkan 4,511,030.00
1 M3 Plat canopy type D (3,70x0,75x0,08) (Lt. 2)
Beton site mix K-225 1.0000 m3 982,050.00 982,050.00
Besi beton d. 12 mm 39.4667 kg 16,890.00 666,592.00
Besi beton d. 10 mm 81.9778 kg 16,890.00 1,384,604.67
Besi beton d. 8 mm 17.5556 kg 16,890.00 296,513.33
Bekisting multiplex 9 mm 12.7778 m2 96,680.00 1,235,355.56
Jumlah 4,565,115.56
Dibulatkan 4,565,110.00
1 M3 Plat canopy type E (1,70x0,40x0,08)
Beton site mix K-225 1.0000 m3 960,360.00 960,360.00
Besi beton d. 12 mm 7.6883 kg 16,850.00 129,548.05
Besi beton d. 10 mm 29.1883 kg 16,850.00 491,823.05
Besi beton d. 8 mm 7.6948 kg 16,850.00 129,657.47
Bekisting multiplex 9 mm 6.4935 m2 94,580.00 614,155.84
Jumlah 2,325,544.42
Dibulatkan 2,325,540.00
1 M3 Plat canopy type E (1,70x0,40x0,08) (Lt. 2)
Beton site mix K-225 1.0000 m3 982,050.00 982,050.00
Besi beton d. 12 mm 7.6883 kg 16,890.00 129,855.58
Besi beton d. 10 mm 29.1883 kg 16,890.00 492,990.58
Besi beton d. 8 mm 7.6948 kg 16,890.00 129,965.26
Bekisting multiplex 9 mm 6.4935 m2 96,680.00 627,792.21
Jumlah 2,362,653.64
Dibulatkan 2,362,650.00
1M³ LISPLANK Tb. 8/30 CM
Beton Ready mix K - 225 1.0000 m3 982,050.00 982,050.00
Besi Beton U.24 81.0541 kg 16,890.00 1,369,002.90
Pas. bekisting multiplek 9 mm 12.5000 m2 96,680.00 1,208,500.00

f:\460742917.xls Hal. 83
2 3 4 5 6 = 3x6
Jumlah 3,559,552.90
Dibulatkan 3,559,550.00
1 M2 Rangka atap baja ringan
Trusses ZAM-75 t=0.8 Rangka Utama 1.9850 m' 25,000.00 49,625.00
Trusses ZAM-75 t=0.5 Rangka Utama 2.8500 m' 16,000.00 45,600.00
Reng 16 - DB Roof Battens t=0.48 mm 5.1750 m' 8,000.00 41,400.00
Foot Plate t=1.22 mm 0.3250 m' 5,000.00 1,625.00
PLD - Diafragma Plate 14.0000 bh 1,500.00 21,000.00
WIND Bracing 0.7150 m' 1,200.00 858.00
Tensioner (Pengaku Tali Angin) 0.2500 bh 5,000.00 1,250.00
Baut Besar 54.0000 Pcs 200.00 10,800.00
Baut Kecil 80.0000 Pcs 95.00 7,600.00
Dynabolt 0.8750 Pcs 7,500.00 6,562.50
Tukang besi profil terampil 0.0250 org 40,000.00 1,000.00
Kepala tukang besi profil 0.3074 org 45,000.00 13,833.00
Pekerja 0.3500 org 30,000.00 10,500.00
Mandor 0.0100 org 55,000.00 550.00
Jumlah 212,203.50
Dibulatkan 212,200.00
1 M2 Genteng metal berpasir 41x110 cm
Genteng metal berpasir 41x110 cm 1.0500 m2 99,900.00 104,895.00
Paku 1 s/d 3 cm 0.2000 kg 21,650.00 4,330.00
Pekerja 0.2000 orang 30,000.00 6,000.00
Tukang kayu terampil 0.1000 orang 40,000.00 4,000.00
Kepala tukang kayu 0.0100 orang 45,000.00 450.00
Mandor 0.0010 orang 55,000.00 55.00
Jumlah 119,730.00
Dibulatkan 119,730.00
1 M2 Genteng metal berpasir 41x110 cm (Lt. 2)
Material 1.0000 m2 109,225.00 109,225.00
Upah kerja 1.0900 m2 10,505.00 11,450.45
Jumlah 120,675.45
Dibulatkan 120,670.00
1 M' Nok metal berpasir P.110 cm L.5 cm T.6 cm
Nok metal berpasir P.110 cm L.5 cm T.6 cm 1.0000 m' 42,350.00 42,350.00
Paku 1 s/d 3 cm 0.0500 kg 21,650.00 1,082.50
Pekerja 0.2500 orang 30,000.00 7,500.00
Tukang kayu terampil 0.1500 orang 40,000.00 6,000.00
Kepala tukang kayu 0.0150 orang 45,000.00 675.00
Mandor 0.0130 orang 55,000.00 715.00
Jumlah 58,322.50
Dibulatkan 58,320.00
1 M' Nok metal berpasir P.110 cm L.5 cm T.6 cm (Lt. 2)
Material 1.0000 m' 43,432.50 43,432.50
Upah kerja 1.0900 m' 14,890.00 16,230.10
Jumlah 59,662.60
Dibulatkan 59,660.00
1 M2 Plafond gypsum board t. 9 mm rangka besi hollow
Hollow 40x40 jincromate 0.4150 btg 20,200.00 8,383.00
Hollow 20x40 jincromate 0.1500 btg 16,200.00 2,430.00
Gypsum board (120x240x9) mm 0.3640 lbr 62,200.00 22,640.80
Paku skrup 25.0000 bh 370.00 9,250.00
Ramset/dinabolt 4.0000 bh 4,800.00 19,200.00
Cotton plaster 0.0720 bh 10,100.00 727.20
Coumpond 0.1250 zak 64,300.00 8,037.50
Pekerja 0.1000 orang 30,000.00 3,000.00
Tukang kayu terampil 0.0500 orang 40,000.00 2,000.00
Kepala tukang kayu 0.0050 orang 45,000.00 225.00
Mandor 0.0050 orang 55,000.00 275.00
Jumlah 76,168.50
Dibulatkan 76,160.00
1 M2 Plafond gypsum board t. 9 mm rangka besi hollow (Lt. 2)
Material 1.0000 m2 70,668.50 70,668.50
Upah kerja 1.0900 m2 5,500.00 5,995.00
Jumlah 76,663.50
Dibulatkan 76,660.00
1 M2 Plafond kalsiboard rangka besi hollow
Hollow 40x40 jincromate 0.4150 btg 20,200.00 8,383.00
Hollow 20x40 jincromate 0.1500 btg 16,200.00 2,430.00

f:\460742917.xls Hal. 84
2 3 4 5 6 = 3x6
Kalsiboard (120x240x6) mm 0.3640 lbr 66,000.00 24,024.00
Paku skrup 25.0000 bh 370.00 9,250.00
Ramset/dinabolt 4.0000 bh 4,800.00 19,200.00
Cotton plaster 0.0720 bh 10,100.00 727.20
Coumpond 0.1250 zak 64,300.00 8,037.50
Pekerja 0.1000 orang 30,000.00 3,000.00
Tukang kayu terampil 0.0500 orang 40,000.00 2,000.00
Kepala tukang kayu 0.0050 orang 45,000.00 225.00
Mandor 0.0050 orang 55,000.00 275.00
Jumlah 77,551.70
Dibulatkan 77,550.00
1 M2 Plafond kalsiboard rangka besi hollow (Lt. 2)
Material 1.0000 m2 72,051.70 72,051.70
Upah kerja 1.0900 m2 5,500.00 5,995.00
Jumlah 78,046.70
Dibulatkan 78,040.00
1 M2 Keramik 20/20 MU 450 & 408 (Lt. 1)
Keramik 20x20 (KM) KW 1 DN Putih Polos 1.0000 m2 50,700.00 50,700.00
MU 450 - perekat keramik/8 m2 (40 kg) 0.1250 zak 182,600.00 22,825.00
MU 408 - pengisi nad/3 m2 (1 kg) 0.3333 zak 10,450.00 3,483.33
Pekerja 0.2500 orang 30,000.00 7,500.00
Tukang batu terampil 0.1200 orang 40,000.00 4,800.00
Kepala tukang batu 0.0120 orang 45,000.00 540.00
Mandor 0.0125 orang 55,000.00 687.50
Jumlah 90,535.83
Dibulatkan 90,530.00
1 M2 Keramik 20/20 MU 450 & 408 (Lt. 2)
Material 1.0000 m2 77,008.33 77,008.33
Upah kerja 1.0900 m2 13,527.50 14,744.98
Jumlah 91,753.31
Dibulatkan 91,750.00
1 M2 Keramik 20/20 MU 450 & 408 (Lt. 3)
Material 1.0000 m2 77,008.33 77,008.33
Upah kerja 1.1200 m2 13,527.50 15,150.80
Jumlah 92,159.13
Dibulatkan 92,150.00
1 M2 Keramik dinding 20/25 warna muda
Keramik 20x25 dinding setara IKAD (Muda) 1.0000 m2 50,500.00 50,500.00
MU 400 - perekat keramik dinding/5 m2 (25 kg) 0.2000 zak 126,500.00 25,300.00
MU 408 - pengisi nad/3 m2 (1 kg) 0.3333 zak 10,450.00 3,483.33
Pekerja 0.1875 orang 30,000.00 5,625.00
Tukang batu terampil 0.3750 orang 40,000.00 15,000.00
Kepala tukang batu 0.0450 orang 45,000.00 2,025.00
Mandor 0.0188 orang 55,000.00 1,034.00
Jumlah 102,967.33
Dibulatkan 102,960.00
1 M2 Keramik dinding 20/25 warna muda (Lt. 2)
Material 1.0000 m2 79,283.33 79,283.33
Upah kerja 1.0900 m2 23,684.00 25,815.56
Jumlah 105,098.89
Dibulatkan 105,090.00
1 M2 Keramik dinding 20/25 warna muda (Lt. 3)
Material 1.0000 m2 79,283.33 79,283.33
Upah kerja 1.1200 m2 23,684.00 26,526.08
Jumlah 105,809.41
Dibulatkan 105,800.00
1 M2 Keramik dinding 20/25 warna tua
Keramik 20x25 dinding setara IKAD (Tua) 1.0000 m2 52,300.00 52,300.00
MU 400 - perekat keramik dinding/5 m2 (25 kg) 0.2000 zak 126,500.00 25,300.00
MU 408 - pengisi nad/3 m2 (1 kg) 0.3333 zak 10,450.00 3,483.33
Pekerja 0.1875 orang 30,000.00 5,625.00
Tukang batu terampil 0.3750 orang 40,000.00 15,000.00
Kepala tukang batu 0.0450 orang 45,000.00 2,025.00
Mandor 0.0188 orang 55,000.00 1,034.00
Jumlah 104,767.33
Dibulatkan 104,760.00
1 M2 Keramik dinding 20/25 warna tua (Lt. 2)
Material 1.0000 m2 81,083.33 81,083.33
Upah kerja 1.0900 m2 23,684.00 25,815.56
Jumlah 106,898.89

f:\460742917.xls Hal. 85
2 3 4 5 6 = 3x6
Dibulatkan 106,890.00
1 M2 Keramik dinding 20/25 warna tua (Lt. 3)
Material 1.0000 m2 81,083.33 81,083.33
Upah kerja 1.1200 m2 23,684.00 26,526.08
Jumlah 107,609.41
Dibulatkan 107,600.00
1 M2 Keramik 30/30 MU 450 & 408 (Lt. 1)
Keramik 30x30 KW 1 DN Corak / Warna / Anti Slip 11.0000 Bh 5,318.18 58,500.00
MU 450 - perekat keramik/8 m2 (40 kg) 0.1250 zak 182600.00 22,825.00
MU 408 - pengisi nad/3 m2 (1 kg) 0.3333 zak 10,450.00 3,483.33
Pekerja 0.2500 org 30,000.00 7,500.00
Tukang batu terampil 0.1200 org 40,000.00 4,800.00
Kepala tukang batu 0.0120 org 45,000.00 540.00
Mandor 0.0125 org 55,000.00 687.50
Jumlah 98,335.83
Dibulatkan 98,330.00
1 M2 Keramik 30/30 MU 450 & 408 (Lt. 2)
Material 1.0000 m2 84,808.33 84,808.33
Upah kerja 1.0900 m2 13,527.50 14,744.98
Jumlah 99,553.31
Dibulatkan 99,550.00
1 M2 Keramik 30/30 MU 450 & 408 (Lt. 3)
Material 1.0000 m2 84,808.33 84,808.33
Upah kerja 1.1200 m2 13,527.50 15,150.80
Jumlah 99,959.13
Dibulatkan 99,950.00
1 M2 Pas. Batako PC pres 10x20x40 ad 1:4
PC 10.8500 kg 1,200.00 13,020.00
Pasir pasang 0.0279 m3 197,000.00 5,496.30
Batako 9x19x39 cm / PSPM 13.0000 Bh 2,500.00 32,500.00
Pekerja 0.2720 orang 30,000.00 8,160.00
Tukang batu terampil 0.0850 orang 40,000.00 3,400.00
Kepala tukang batu 0.0085 orang 45,000.00 382.50
Mandor 0.0128 orang 55,000.00 701.25
Jumlah 63,660.05
Dibulatkan 63,660.00
1 M2 Dinding hebel t 10 cm + MU 380
Hebel t. 10x20x60 8.5000 bh 8,590.00 73,015.00
MU 380 - pas. Bata ringan/10 m2 (40 kg) 0.1000 zak 134,200.00 13,420.00
Pekerja 0.2720 orang 30,000.00 8,160.00
Tukang batu terampil 0.0850 orang 40,000.00 3,400.00
Kepala tukang batu 0.0085 orang 45,000.00 382.50
Mandor 0.0128 orang 55,000.00 701.25
Jumlah 99,078.75
Dibulatkan 99,070.00
1 M2 Dinding hebel t 10 cm + MU 380 (Lt. 2)
Material 1.0000 m2 86,435.00 86,435.00
Upah kerja 1.0900 m2 12,643.75 13,781.69
Jumlah 100,216.69
Dibulatkan 100,210.00
1 M2 Plesteran dinding MU 100 t. 10 mm
MU 100 - plesteran/2,4 m2 (40 kg) 0.4167 kg 55,000.00 22,916.67
Pekerja 0.2000 orang 30,000.00 6,000.00
Tukang batu terampil 0.1500 orang 40,000.00 6,000.00
Kepala tukang batu 0.0150 orang 45,000.00 675.00
Mandor 0.0100 orang 55,000.00 550.00
Jumlah 36,141.67
Dibulatkan 36,140.00
1 M2 Plesteran dinding MU 100 t. 10 mm (Lt. 2)
Material 1.0000 m2 22,916.67 22,916.67
Upah Kerja 1.0900 m2 13,225.00 14,415.25
Jumlah 37,331.92
Dibulatkan 37,330.00
1 M2 Acian MU 200 t. 3 mm
MU 200 - acian plesteran/20 m2 (40 kg) 0.0500 kg 145,200.00 7,260.00
Pekerja setengah terampil 0.1430 orang 35,000.00 5,005.00
Tukang batu setengah terampil 0.1070 orang 35,000.00 3,745.00
Kepala Tukang 0.0105 orang 45,000.00 472.50
Mandor 0.0105 orang 55,000.00 577.50

f:\460742917.xls Hal. 86
2 3 4 5 6 = 3x6
Jumlah 17,060.00
Dibulatkan 17,060.00
1 M2 Acian MU 200 t. 3 mm (Lt. 2)
Material 1.0000 m2 7,260.00 7,260.00
Upah kerja 1.0900 m2 9,800.00 10,682.00
Jumlah 17,942.00
Dibulatkan 17,940.00
1 M2 Waterproofing MU 600
MU 600 - pelapis kedap air/1,5 m2 (3 kg) 0.6667 zak 103,950.00 69,300.00
Pekerja 0.2000 orang 30,000.00 6,000.00
Tukang batu terampil 0.1500 orang 40,000.00 6,000.00
Kepala tukang batu 0.0150 orang 45,000.00 675.00
Mandor 0.0100 orang 55,000.00 550.00
Jumlah 82,525.00
Dibulatkan 82,520.00
1 M2 Waterproofing MU 600 (Lt. 2)
Material 1.0000 m2 69,300.00 69,300.00
Upah kerja 1.0900 m2 13,225.00 14,415.25
Jumlah 83,715.25
Dibulatkan 83,710.00
1 M2 Pengecatan dinding Cat Vinilex
Plamir tembok 0.1000 kg 12,200.00 1,220.00
Cat dasar 0.1000 kg 18,200.00 1,820.00
Cat Vinilex 0.2600 kg 18,200.00 4,732.00
Amplas 0.5000 lbr 2,600.00 1,300.00
Rol cat tembok 0.0100 bh 27,800.00 278.00
Pekerja 0.1000 orang 30,000.00 3,000.00
Tukang cat terampil 0.0630 orang 40,000.00 2,520.00
Kepala tukang cat 0.0063 orang 45,000.00 283.50
Mandor 0.0025 orang 55,000.00 137.50
Steger werk 0.0450 lot 15,291.00 688.10
Jumlah 15,979.10
Dibulatkan 15,970.00
1 M2 Pengecatan dinding Cat Vinilex (Lt. 2)
Material + alat bantu 1.0000 m2 10,038.10 10,038.10
Upah kerja 1.0900 m2 5,941.00 6,475.69
Jumlah 16,513.79
Dibulatkan 16,510.00

f:\460742917.xls Hal. 87
2 3 4 5 6 = 3x6
1 M2 Pengecatan plafond (3x) Cat Vinilex
Cat Vinilex 0.2000 kg 18,200.00 3,640.00
Plamir tembok 0.1600 kg 12,200.00 1,952.00
Rol cat tembok 0.0100 bh 27,800.00 278.00
Amplas 0.5000 lbr 2,600.00 1,300.00
Pekerja setengah terampil 0.1000 orang 35,000.00 3,500.00
Tukang cat setengah terampil 0.1500 orang 35,000.00 5,250.00
Kepala tukang cat 0.0150 orang 45,000.00 675.00
Mandor 0.0050 orang 55,000.00 275.00
Steger werk 0.0425 Ls 16,870.00 716.98
Jumlah 17,586.98
Dibulatkan 17,580.00
1 M2 Pengecatan plafond (3x) Cat Vinilex (Lt. 2)
Material + alat bantu 1.0000 m2 7,886.98 7,886.98
Upah kerja 1.0900 m2 9,700.00 10,573.00
Jumlah 18,459.98
Dibulatkan 18,450.00
1 M2 Pengecatan kayu (3x) berikut meni
Meni kayu/besi 0.2000 kg 25,500.00 5,100.00
Plamir kayu 0.1500 kg 18,500.00 2,775.00
Cat dasar 0.1700 kg 18,200.00 3,094.00
Cat kayu glotex 0.3500 kg 37,150.00 13,002.50
Pekerja 0.0700 orang 30,000.00 2,100.00
Tukang cat terampil 0.1050 orang 40,000.00 4,200.00
Kepala tukang cat 0.0040 orang 45,000.00 180.00
Mandor 0.0025 orang 55,000.00 137.50
Jumlah 30,589.00
Dibulatkan 30,580.00
1 M2 Pengecatan kayu (3x) berikut meni (Lt. 2)
Material 1.0000 m2 23,971.50 23,971.50
Upah kerja 1.0900 m2 6,617.50 7,213.08
Jumlah 31,184.58
Dibulatkan 31,180.00
1 M2 Pelaburan Bidang Kayu dengan Politur
Politur 0.1500 Ltr 35,100.00 5,265.00
Politur jadi 0.3720 Ltr 52,900.00 19,678.80
Amplas 2.0000 lbr 2,600.00 5,200.00
Pekerja - orang 30,000.00 -
Tukang cat terampil 0.0600 orang 40,000.00 2,400.00
Kepala tukang cat 0.0160 orang 45,000.00 720.00
Mandor 0.0025 orang 55,000.00 137.50
Jumlah 33,401.30
Dibulatkan 33,400.00
1 M2 Pelaburan Bidang Kayu dengan Politur (Lt. 2)
Material 1.0000 m2 30,143.80 30,143.80
Upah kerja 1.0900 m2 3,257.50 3,550.68
Jumlah 33,694.48
Dibulatkan 33,690.00
1 M2 Pengecatan meni besi
Meni kayu/besi 0.1000 kg 5,100.00 510.00
Kuas 3" 0.0100 bh 13,600.00 136.00
Pekerja 0.0200 orang 30,000.00 600.00
Tukang cat terampil 0.2000 orang 40,000.00 8,000.00
Kepala tukang cat 0.0200 orang 45,000.00 900.00
Mandor 0.0100 orang 55,000.00 550.00
Jumlah 10,696.00
Dibulatkan 10,690.00
1 M2 Pengecatan besi
Pengecatan meni besi 1.0000 M2 10,690.00 10,690.00
Cat besi glotex 0.2000 kg 37,150.00 7,430.00
Amplas 0.4000 lbr 2,600.00 1,040.00
Tiner A 0.1500 ltr 20,300.00 3,045.00
Kuas 3" 0.0500 bh 13,600.00 680.00
Pekerja terampil 0.2000 org 38,500.00 7,700.00
Tukang cat terampil 0.3000 org 40,000.00 12,000.00
Kepala tukang cat 0.0300 org 45,000.00 1,350.00
Mandor 0.0100 org 55,000.00 550.00

f:\460742917.xls Hal. 88
2 3 4 5 6 = 3x6
Jumlah 44,485.00
Dibulatkan 44,480.00

f:\460742917.xls Hal. 89
2 3 4 5 6 = 3x6
1 M2 Pengecatan besi (Lt. 2)
Material 1.0000 m2 22,885.00 22,885.00
Upah kerja 1.0900 m2 21,600.00 23,544.00
Jumlah 46,429.00
Dibulatkan 46,420.00
1 M' Listplank metal 30 cm (Lt. 2)
Pekerja terampil 0.0954 orang 38,500.00 3,671.94
Tukang kayu setengah terampil 0.2725 orang 35,000.00 9,537.50
Kepala tukang kayu 0.0273 orang 45,000.00 1,226.25
Mandor 0.0055 orang 55,000.00 299.75
Listplank metal Zam t=0,8mm powdercoating 1.0000 m' 100,000.00 100,000.00
Jumlah 114,735.44
Dibulatkan 114,730.00
1 Un P-1 (PA)
Kusen alumunium 3" color setara INDAL 6.6000 m' 70,000.00 462,000.00
Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan 1.6000 m2 323,600.00 517,760.00
Kaca polos 5 mm 0.3600 m2 69,300.00 24,948.00
Kunci 2 Slaag Lengkap Mayer 1.0000 bh 121,100.00 121,100.00
Engsel pintu Cavell (4") 3.0000 bh 29,600.00 88,800.00
Sealent 16.6000 m' 2,230.00 37,018.00
Upah pasang 2.1600 m2 50,000.00 108,000.00
Jumlah 1,359,626.00
Dibulatkan 1,359,620.00
1 Un P-1' (PA)
Kusen alumunium 3" color setara INDAL 4.7000 m' 70,000.00 329,000.00
Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan 1.5200 m2 323,600.00 491,872.00
Kunci 2 Slaag Lengkap Mayer 1.0000 bh 121,100.00 121,100.00
Engsel pintu Cavell (4") 3.0000 bh 29,600.00 88,800.00
Sealent 9.4000 m' 2,230.00 20,962.00
Upah pasang 1.7100 m2 50,000.00 85,500.00
Jumlah 1,137,234.00
Dibulatkan 1,137,230.00
1 Un P-2 (PA)
Kusen alumunium 3" color setara INDAL 8.8000 m' 70,000.00 616,000.00
Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan 3.4000 m2 323,600.00 1,100,240.00
Kaca polos 5 mm 0.7200 m2 69,300.00 49,896.00
Kunci 2 Slaag Lengkap Mayer 1.0000 bh 121,100.00 121,100.00
Engsel pintu Cavell (4") 6.0000 bh 29,600.00 177,600.00
Grendel pintu / jendela 5 cm 1.0000 set 2,230.00 2,230.00
Sealent 23.6000 m' 2,230.00 52,628.00
Upah pasang 4.3200 m2 50,000.00 216,000.00
Jumlah 2,335,694.00
Dibulatkan 2,335,690.00
1 Un J1 (JA)
Kusen alumunium 3" color setara INDAL 5.9000 m' 70,000.00 413,000.00
Allumunium Profil Daun jendela 3" color 4.2000 m' 71,700.00 301,140.00
Kaca polos 5 mm 1.4400 m2 69,300.00 99,792.00
Engsel Jendela Unilon Standar Belluci (Silver) 2.0000 bh 24,200.00 48,400.00
Grendel pintu / jendela 5 cm 1.0000 bh 7,500.00 7,500.00
Hak Kait Angin jendela Biasa Goose Bulat 1.0000 bh 11,500.00 11,500.00
Sealent 23.6000 m' 2,230.00 52,628.00
Upah pasang 1.4400 m2 50,000.00 72,000.00
Jumlah 1,005,960.00
Dibulatkan 1,005,960.00
1 Un J2 (JA)
Kusen alumunium 3" color setara INDAL 10.2000 m' 70,000.00 714,000.00
Allumunium Profil Daun jendela 3" color 4.2000 m' 71,700.00 301,140.00
Kaca polos 5 mm 2.8800 m2 69,300.00 199,584.00
Engsel Jendela Unilon Standar Belluci (Silver) 4.0000 bh 24,200.00 96,800.00
Grendel pintu / jendela 5 cm 2.0000 bh 7,500.00 15,000.00
Hak Kait Angin jendela Biasa Goose Bulat 2.0000 bh 11,500.00 23,000.00
Sealent 37.2000 m' 2,230.00 82,956.00
Upah pasang 2.8800 m2 50,000.00 144,000.00
Jumlah 1,576,480.00
Dibulatkan 1,576,480.00
1 Un BV (JA)
Kusen alumunium 3" color setara INDAL 3.9000 m' 70,000.00 273,000.00
Kaca polos 5 mm 0.4500 m2 69,300.00 31,185.00
Sealent 7.8000 m' 2,230.00 17,394.00

f:\460742917.xls Hal. 90
2 3 4 5 6 = 3x6
Upah pasang 0.4500 m2 50,000.00 22,500.00
Jumlah 344,079.00
Dibulatkan 344,070.00
1 Un BV-1 (JA)
Kusen alumunium 3" color setara INDAL 2.2000 m' 70,000.00 154,000.00
Kaca polos 5 mm 0.2800 m2 69,300.00 19,404.00
Sealent 4.4000 m' 2,230.00 9,812.00
Upah pasang 0.2800 m2 50,000.00 14,000.00
Jumlah 197,216.00
Dibulatkan 197,210.00

f:\460742917.xls Hal. 91
B. PEK. MEKANIKAL
HARGA SAT. JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
1 2 3 4 5 6 = 3x6
1 1 M¹ Pas. Pipa PVC d. 1/2" (AW) Wavin
Pipa PVC d. 1/2" (AW) Wavin 1.000 M1 3,525.00 3,525.00
Klem 1.000 BH 1,210.00 1,210.00
Lem 0.069 M1 7,260.00 501.52
Dinabolt 2.000 BH 310.00 620.00
Fitting 1.000 BH 910.00 910.00
Upah 0.150 OH 6,766.52 1,014.98
Jumlah 7,781.50
Dibulatkan 7,780.00
2 1 M¹ Pas. Pipa PVC d. 3/4" (AW) Wavin
Pipa PVC d. 3/4" (AW) Wavin 1.000 M1 4,875.00 4,875.00
Klem 1.000 BH 1,210.00 1,210.00
Lem 0.082 M1 7,260.00 592.71
Dinabolt 2.000 BH 310.00 620.00
Fitting 1.000 BH 1,520.00 1,520.00
Upah 0.150 OH 8,817.71 1,322.66
Jumlah 10,140.36
Dibulatkan 10,140.00
3 1 M¹ Pas. Pipa PVC d. 1" (AW) Wavin
Pipa PVC d. 1" (AW) Wavin 1.000 M1 7,870.00 7,870.00
Klem 1.000 BH 1,820.00 1,820.00
Lem 0.100 M1 7,260.00 729.48
Dinabolt 2.000 BH 310.00 620.00
Fitting 1.000 BH 1,820.00 1,820.00
Upah 0.150 OH 12,859.48 1,928.92
Jumlah 14,788.41
Dibulatkan 14,780.00
4 1 M¹ Pas. Pipa PVC d. 1 1/4" (AW) Wavin
Pipa PVC d. 1 1/4" (AW) Wavin 1.000 M1 9,450.00 9,450.00
Klem 1.000 BH 1,820.00 1,820.00
Lem 0.132 M1 7,260.00 957.45
Dinabolt 2.000 BH 310.00 620.00
Fitting 1.000 BH 2,120.00 2,120.00
Upah 0.150 OH 14,967.45 2,245.12
Jumlah 17,212.57
Dibulatkan 17,210.00
5 1 M¹ Pas. Pipa PVC d. 1 1/2" (AW) Wavin
Pipa PVC d. 1 1/2" (AW) Wavin 1.000 M1 13,475.00 13,475.00
Klem 1.000 BH 2,420.00 2,420.00
Lem 0.151 M1 7,260.00 1,094.23
Dinabolt 2.000 BH 310.00 620.00
Fitting 1.000 BH 3,030.00 3,030.00
Upah 0.150 OH 20,639.23 3,095.88
Jumlah 23,735.11
Dibulatkan 23,730.00
6 1 M¹ Pas. Pipa PVC d. 2" (AW) Wavin
Pipa PVC d. 2" (AW) Wavin 1.000 M1 13,000.00 13,000.00
Klem 1.000 BH 2,420.00 2,420.00
Lem 0.188 M1 7,260.00 1,367.78
Gantungan 1.000 BH 6,050.00 6,050.00
Dinabolt 2.000 BH 310.00 620.00
Fitting 1.000 BH 4,240.00 4,240.00
Upah 0.150 OH 27,697.78 4,154.67
Jumlah 31,852.45
Dibulatkan 31,850.00
7 1 M¹ Pas. Pipa PVC d. 2 1/2" (AW) Wavin
Pipa PVC d. 2 1/2" (AW) Wavin 1.000 M1 21,900.00 21,900.00
Klem 1.000 BH 3,030.00 3,030.00
Lem 0.239 M1 7,260.00 1,732.53
Gantungan 1.000 BH 7,260.00 7,260.00
Dinabolt
f:\460742917.xls 2.000 BH 310.00 620.00
Hal. 92
Fitting 1.000 BH 6,050.00 6,050.00
Upah 0.150 OH 40,592.53 6,088.88
Jumlah 46,681.41
C. PEK. ELEKTRIKAL
HARGA SAT
No. URAIAN VOLUME SAT
(Rp)
1 2 3 4 5
1 1 Ttk Pas. Instalasi penerangan
NYM 3 x 2.5 mm2 9.0000 m1 7,500.00
Pipa Konduit 20 mm Clipsal 8.0000 meter 3,790.00
Pipa Flexible 20 mm Clipsal 1.0000 meter 3,030.00
T-Doos 20 mm Cab.3 Clipsal 2.0000 bh 6,660.00
Sok 20 mm Clipsal 3.0000 bh 750.00
Klem 20 mm Clipsal 10.0000 bh 500.00
Isolasi Listrik Unibell 0.2500 bh 10,000.00
Lasdop 6.0000 bh 500.00
Fisher + Sekrup 10.0000 bh 1,500.00
Upah 0.1000 OH 141,920.00
Jumlah
Dibulatkan
2 1 Ttk Pas. Instalasi stop kontak
NYM 3 x 2.5 mm2 10.0000 m1 7,500.00
Pipa Konduit 20 mm Clipsal 9.0000 meter 3,790.00
Pipa Flexible 20 mm Clipsal 1.0000 meter 3,030.00
T-Doos 20 mm Cab.3 Clipsal 2.0000 bh 6,660.00
Sok 20 mm Clipsal 3.0000 bh 750.00
Klem 20 mm Clipsal 10.0000 bh 500.00
Isolasi Listrik Unibell 0.2500 bh 10,000.00
Lasdop 6.0000 bh 500.00
Fisher + Sekrup 10.0000 bh 1,500.00
Upah 0.1000 OH 153,210.00
Jumlah
Dibulatkan
3 1 Ttk Stop Kontak
Stop Kontak Setara Broco 1.000 bh 15,900.00
Alat bantu 0.100 ls 15,900.00
Upah pasang 0.200 ls 17,490.00
Jumlah
Dibulatkan
4 1 Ttk Saklar tunggal
Saklar tunggal Setara Broco 1.000 bh 16,500.00
Alat bantu 0.100 ls 16,500.00
Upah pasang 0.150 ls 18,150.00
Jumlah
Dibulatkan
5 1 Ttk Saklar ganda
Saklar seri Setara Broco 1.000 bh 18,500.00
Alat bantu 0.100 ls 18,500.00
Upah pasang 0.150 ls 20,350.00
Jumlah
Dibulatkan
6 1 Bh TL 2 x 36 W V Shape
Lampu TL 2 x 36 W V Shape 1.0000 bh 379,940.00
Upah pasang 0.0500 ls 379,940.00
Jumlah
Dibulatkan
7 1 Bh Lampu Baret TL-E 20 W
Lampu Baret TL-E 20 W 1.0000 bh 266,200.00
Upah pasang 0.0500 ls 266,200.00
Jumlah
Dibulatkan
8 1 Bh Dwn Light PCL 13 W
Lampu Dwn Light PCL 13 W 1.0000 bh 223,850.00
Upah pasang 0.0500 ls 223,850.00
Jumlah
Dibulatkan
f:\460742917.xls Hal. 93
JUMLAH
(Rp)
6 = 3x6

67,500.00
30,320.00
3,030.00
13,320.00
2,250.00
5,000.00
2,500.00
3,000.00
15,000.00
14,192.00
156,112.00
156,110.00

75,000.00
34,110.00
3,030.00
13,320.00
2,250.00
5,000.00
2,500.00
3,000.00
15,000.00
15,321.00
168,531.00
168,530.00

15,900.00
1,590.00
3,498.00
20,988.00
20,980.00

16,500.00
1,650.00
2,722.50
20,872.50
20,870.00

18,500.00
1,850.00
3,052.50
23,402.50
23,400.00

379,940.00
18,997.00
398,937.00
398,930.00

266,200.00
13,310.00
279,510.00
279,510.00

223,850.00
11,192.50
235,042.50
235,040.00
f:\460742917.xls Hal. 94
Besi :
d. 6 0.222 kg/m
d. 8 0.395 kg/m
d. 10 0.620 kg/m
d. 12 0.888 kg/m
d. 13 1.040 kg/m
d. 16 1.580 kg/m
d. 19 2.230 kg/m
d. 22 2.980 kg/m
d. 25 3.850 kg/m
d. 32 6.310 kg/m

Baja siku : Channel : Plat Hitam : 7.837


50.50.5 3.750 kg/m 100.50.20.3,2 5.500 kg/m t. 6 mm 47.024 kg/m2
60.60.6 4.597 kg/m 125.50.20.3,2 6.133 kg/m t. 8 mm 62.698 kg/m2
70.70.7 7.380 kg/m 150.50.20.3,2 6.767 kg/m t. 10 mm 78.373 kg/m2
75.75.7 7.940 kg/m 150.65.20.3,2 7.517 kg/m t. 12 mm 94.047 kg/m2
80.80.8 9.660 kg/m 200.75.20.3,2 9.270 kg/m
100.100.10 15.100 kg/m
65.65.6 5.910 kg/m
75.75.6 6.870 kg/m
40.40.4 2.417 kg/m

Besi WF : Pipa hitam medium : Luas permukaan :


100.50.5.7 9.333 kg/m' D. 4" t. 4,5 mm 12.100 kg/m' D. 4" t. 4,5 0.358 m2/m'
125.60.6.8 13.200 kg/m' D. 2" t. 3,6 mm 5.090 kg/m' D. 2" t. 3,6 0.189 m2/m'
150.75.5.7 14.000 kg/m' D. 1" t. 3,2 mm 2.440 kg/m' D. 1" t. 3,2 0.106 m2/m'
175.90.5.8 18.100 kg/m' D. 2,5" t. 3,6 mm 6.520 kg/m' D. 2,5" t. 3 0.239 m2/m'
200.100.3,2.4,5 11.917 kg/m'
200.100.5,5.8 21.333 kg/m'
250.125.6.9 29.600 kg/m'
300.150.6,5.9 36.700 kg/m'
350.175.7.11 49.600 kg/m'

Wire Mesh (2,1 x 5,4) :


Toleransi Full berat/kg/m2/lapis
M4 15.450 lbr 15.450 lbr 1.366
MK 5 21.330 lbr 24.140 lbr 2.125
MK 6 31.370 lbr 34.760 lbr 3.064
MK 7 43.340 lbr 47.310 lbr 4.168
MK 8 57.240 lbr 61.790 lbr 5.451
MK 10 8.515

You might also like