Professional Documents
Culture Documents
Line of
Horizontal Wall +
Sum of Centre
Line of Vertical
Centre Line = Wall
H1=
0.15+3+0.3+4+0.15
H2= 0.15+3+0.15
V1
0.15+4+0.3+6+0.15
NO. OF JUNCTION
W1
.3+4+0.15 (7.6 *3) 22.8
(3.3 * 1) 3.3
SUM 26.1
.3+6+0.15 10.6*3 31.8
57.9
UNCTION 8
Column Size
300 mm x 300 mm
m x 300 mm
ng Estimation
ANTITY SHEET
Length Widht/ Height/
Sr. No. Item Description No. Breadth Depth Quantity
(m) (m) (m)
1 Earthwork in Excavation in
Foundation:
Footing (1m x 1m) 12 1.50 1.50 1.50 40.50 cu m
Depth From GL = 1.5 m
2 P.P.C. in Foundation
Footing (1m x 1m) 12 1.3 1.3 0.1 2.03 cu m
Thickness = 0.10
3 Column(300mm x 300mm)
Base(1m x 1m) 12 1.00 1.00 0.15 1.80 cu m
Thickness = 0.15
Stem(0.30 x0.30)
height= 1.25+0.55 = 1.80 m 12 0.30 0.30 1.80 1.94 cu m
Total 3.74 cu m
4 Plinth Beam
Beam (300 mm x 300 mm)
Beam - 1 (3m length) 4 3.00 0.30 0.30 1.08 cu m
Beam - 2 (4m length) 7 4.00 0.30 0.30 2.52 cu m
Beam - 3 (3.4m length) 3 3.40 0.30 0.30 0.92 cu m
Beam - 4 (2.3m length) 3 2.30 0.30 0.30 0.62 cu m
Total 5.14 cu m
8 Slab
L = 7.9 m
B = 10.9 m
H = 0.10 1 7.90 10.90 0.10 8.61 cu m
1m
0.25 m 0.25 m
1.5 m 1m
1m
1.5 m
150 mm
150 mm