3rd Floor Beam Design....

Proposed Korean-Philippines OPD Hospital


Cavite City. DECEMEBER 2000

3B-3
DESIGN OF BEAM 3 AT THIRD FLOOR
SPAN MARK DISCONT. SUPPORT CONT. SUPPORT
BEAM DESIGNATION AT SUPPORT AT MIDSPAN AT SUPPORT AT SUPPORT AT MIDSPAN AT SUPPORT
DESIGN MOMENT ( Mu ) 46735000.00 52574060.00 467350000.00 52574060.00 467350000.00 52574060.00
fc' 24 24 24 24 24 24

CRITERIA
fy 413 413 413 413 413 413
b 200 200 200 200 200 200
h 400 400 400 400 400 400
cc 40 40 40 40 40 40
db' 16 16 16 16 16 16
DESIGN
db 16 16 16 16 16 16
str.diam 10 10 10 10 10 10
d' 58 58 58 58 58 58
d=assumed double layer 342 342 342 342 342 342
F 0.9 0.9 0.9 0.9 0.9 0.9
STRENGHT AS SINGLY

b 0.85 0.85 0.85 0.85 0.85 0.85


DESIGN MOMENT

rb 0.0248679993021 0.0248679993021 0.0248679993 0.0248679993 0.024867999302 0.024867999302


REINF. BEAM

rmax = 0.75r b 0.0186509994765 0.0186509994765 0.0186509995 0.01865099948 0.018650999477 0.018650999477


r = 100%rmax 0.0186509994765 0.0186509994765 0.0186509995 0.01865099948 0.018650999477 0.018650999477
AS1=rbd 1275.7283641953 1275.7283641953 1275.7283642 1275.7283642 1275.728364195 1275.728364195

w 0.3209526159921 0.3209526159921 0.320952616 0.32095261599 0.320952615992 0.320952615992


MOMENT (Md1) 131463083.2294 131463083.2294 131463083.23 131463083.229 131463083.2294 131463083.2294
MOMENT (Md2) = Mu - Md1 -84728083 -78889023 335886917 -78889023 335886917 -78889023

Md2 = fAS2fy (d-d' ) AS2 = AS' -802.6320183758 -747.3184041101 3181.8682033 -747.31840411 3181.868203293 -747.31840411

for tension bar AS = AS1 + AS2 473.09634581947 528.4099600851 4457.5965675 528.409960085 4457.596567488 528.4099600851
check first whether tension and compression bars will yield
AS1 fy = 0.85 fc' ab a 129.1362 129.13622902271 129.1362 129.1362 129.1362 129.1362
a= b C C 151.92497532083 151.92497532083 151.92497532 151.924975321 151.9249753208 151.9249753208

Îs' 0.0018546978558 0.0018546978558 0.0018546979 0.00185469786 0.001854697856 0.001854697856

Îy = fy / Es 0.002065 0.002065 0.002065 0.002065 0.002065 0.002065


For comp. Bars REMARKS not yield! not yield! not yield! not yield! not yield! not yield!

Îs 0.0037533333333 0.0037533333333 0.0037533333 0.00375333333 0.003753333333 0.003753333333


for tension bar REMARKS yield ! yield ! yield ! yield ! yield ! yield !
Ao = p (db)2/4 201.061929856 201.061929856 201.06192986 201.061929856 201.061929856 201.061929856
for tension bar ( AS ) number of bars ( N ) 2.352988187064 2.628095534861 22.170266498 2.62809553486 22.17026649789 2.628095534861
say 3-16 mmf 3-16 mmf 3-16 mmf 3-16 mmf 3-16 mmf 3-16 mmf
Ao = p (db')2/4 201.061929856 201.061929856 201.06192986 201.061929856 201.061929856 201.061929856
For comp. Bars ( AS' ) number of bars ( N ) 6 6 6 6 6 6
say 6-16 mmf 6-16 mmf 6-16 mmf 6-16 mmf 6-16 mmf 6-16 mmf

3CB-1.
DESIGN OF CANTILEBER BEAM 1 AT THIRD FLOOR
SPAN MARK DISCONT. SUPPORT CONT. SUPPORT
BEAM DESIGNATION AT SUPPORT AT MIDSPAN AT SUPPORT AT SUPPORT AT MIDSPAN AT SUPPORT
DESIGN MOMENT ( Mu ) 12343000.00 14106000.00 12343000.00 14106000.00 12343000.00 14106000.00
fc' 24 24 24 24 24 24
CRITERIA

fy 413 413 413 413 413 413


b 200 200 200 200 200 200
h 500 500 500 500 500 500
cc 40 40 40 40 40 40
db' 16 16 16 16 16 16
DESIGN

db 16 16 16 16 16 16
str.diam 10 10 10 10 10 10
d' 58 58 58 58 58 58
d=assumed double layer 442 442 442 442 442 442
F 0.9 0.9 0.9 0.9 0.9 0.9
STRENGHT AS SINGLY

b 0.85 0.85 0.85 0.85 0.85 0.85


DESIGN MOMENT

rb 0.0248679993021 0.0248679993021 0.0248679993 0.0248679993 0.024867999302 0.024867999302


REINF. BEAM

rmax = 0.75rb 0.0186509994765 0.0186509994765 0.0186509995 0.01865099948 0.018650999477 0.018650999477


r = 100%rmax 0.0186509994765 0.0186509994765 0.0186509995 0.01865099948 0.018650999477 0.018650999477
AS1=rbd 1648.748353726 1648.748353726 1648.7483537 1648.74835373 1648.748353726 1648.748353726

w 0.3209526159921 0.3209526159921 0.320952616 0.32095261599 0.320952615992 0.320952615992


MOMENT (Md1) 219581698.57416 219581698.57416 219581698.57 219581698.574 219581698.5742 219581698.5742
MOMENT (Md2) = Mu - Md1 -207238699 -205475699 -207238699 -205475699 -207238699 -205475699
Md2 = fAS2fy (d-
AS2 = AS' -1451.934653942 -1439.582902978 -1451.9346539 -1439.582903 -1451.934653942 -1439.58290298
d' )
for tension bar AS = AS1 + AS2 196.8136997841 209.16545074814 196.81369978 209.165450748 196.8136997841 209.1654507481
check first whether tension and compression bars will yield
AS1 fy = 0.85 fc' ab a 166.8954 166.89536031589 166.8954 166.8954 166.8954 166.8954
a= bC C 196.34748272458 196.34748272458 196.34748272 196.347482725 196.3474827246 196.3474827246

Îs' 0.0021138159879 0.0021138159879 0.002113816 0.00211381599 0.002113815988 0.002113815988

FDC Engineers Contractor Surveyors


Page no.____of_____
Structural Analysis... LR Abeleda
3rd Floor Beam Design....
Proposed Korean-Philippines OPD Hospital
Cavite City. DECEMEBER 2000

Îy = fy / Es 0.002065 0.002065 0.002065 0.002065 0.002065 0.002065


For comp. Bars REMARKS yield ! yield ! yield ! yield ! yield ! yield !

Îs 0.0037533333333 0.0037533333333 0.0037533333 0.00375333333 0.003753333333 0.003753333333


for tension bar REMARKS yield ! yield ! yield ! yield ! yield ! yield !
Ao = p (db)2/4 201.061929856 201.061929856 201.06192986 201.061929856 201.061929856 201.061929856
for tension bar ( AS ) number of bars ( N ) 0.9788710370235 1.0403036064457 0.978871037 1.04030360645 0.978871037024 1.040303606446
say 2-16 mmf 2-16 mmf 2-16 mmf 2-16 mmf 2-16 mmf 2-16 mmf
Ao = p (db')2/4 201.061929856 201.061929856 201.06192986 201.061929856 201.061929856 201.061929856
For comp. Bars ( AS' ) number of bars ( N ) 4 4 4 4 4 4
say 4-16 mmf 4-16 mmf 4-16 mmf 4-16 mmf 4-16 mmf 4-16 mmf

FDC Engineers Contractor Surveyors


Page no.____of_____
Structural Analysis... LR Abeleda
Proposed Korean-Pilippines OPD Hospital Beam Design...
Cavite City december 2000

SCHEDULE OF REINFORCED CONCRETE BEAM AT 2ND FLOOR


BEAM CROSS LONGITUDINAL REINFORCEMENT 12MM
BEAM MARK SECTION CONTINOUS SUPPORT DISCONTINOUS SUPPORT WEB SPACING OF STIRRUPS
BAR DIAMETER BAR
WIDTH DEPTH AT SUPP. AT MIDSPAN AT SUPP. AT SUPP. AT MIDSPAN AT SUPP.
TB 6 4 6 6 4 6 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 1 200MM 400MM 16MM 2
BB 4 6 4 4 6 4 100, rest at 150mm o.c.
TB 4 3 4 4 3 4 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 2 200MM 400MM 16MM 2
BB 3 4 3 3 4 3 100, rest at 150mm o.c.
TB 6 4 6 6 4 6 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 3 200MM 400MM 16MM 2
BB 4 6 4 4 6 4 100, rest at 150mm o.c.
TB 4 3 4 4 3 4 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 4 200MM 400MM 16MM 2
BB 3 4 3 3 4 3 100, rest at 150mm o.c.
TB 3 2 3 3 2 3 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 5 200MM 400MM 16MM 2
BB 4 6 4 4 6 4 100, rest at 150mm o.c.
TB 3 2 3 3 2 3 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 6 200MM 400MM 16MM 2
BB 4 6 4 4 6 4 100, rest at 150mm o.c.
TB 3 2 3 3 2 3
2B 7 200MM 400MM 16MM 2 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
BB 2 3 2 2 3 2 100, rest at 150mm o.c.
TB 3 2 3 3 2 3 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 8 200MM 400MM 16MM 2
BB 2 3 2 2 3 2 100, rest at 150mm o.c.
TB 7 6 7 7 6 7 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 9 250MM 500MM 16MM 2
BB 6 7 6 6 7 6 100, rest at 150mm o.c.
TB 7 6 7 7 6 7 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2B 10 300MM 600MM 16MM 2
BB 6 7 6 6 7 6 100, rest at 150mm o.c.
2B 11 200MM 400MM 16MM TB 4 3 4 4 3 4 2 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
BB 3 4 3 3 4 3 100, rest at 150mm o.c.
2B 12 200MM 400MM 16MM TB 4 3 4 4 3 4 2 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
BB 3 4 3 3 4 3 100, rest at 150mm o.c.

TB 7 6 7 7 6 7 USE 10MM Ǿbar spaced at 5 @ 50, 3 @


2CB 1 300MM 600MM 16MM 2
BB 6 7 6 6 7 6 100, rest at 150mm o.c.
TB 2 2 2 2 2 2 USE 10MM Ǿbar spaced at 5 @ 50, 3 @
2CB 2 200MM 400MM 16MM 2
BB 2 2 2 2 2 2 100, rest at 150mm o.c.

FDC Engineers Contractor Surveyors. Page no._____of_____