You are on page 1of 4

Concrete Works

No. Items Length(m) Width(m)


Column
C1 4 0.4 0.4
C2 3 0.2 0.4
C3 2 0.3 0.3
Footing
F1 6 1.3 1.3
F2 2 1 0.72
F3 1 1.3 0.8
Wall & Wall Footing
W1 1 52.6 0.3
Wall
WF1 1 0.2 0.4
WF2 1 0.4 0.3
Beam
RB 1 63.78 0.25
2B 1 63.78 0.4
Slab
S1 1
S2
Slab on Grade

Interior Wall(4" THK CHB)


Ground Floor
second floor
Exterior(6"THK CHB)
Plastering 0.05

Total Concrete

CHB
Area(sq.m) Area of wall No. of CHB(pcs)
Interior Wall 0.08 145.2 1815
Exterior Wall 0.08 240 3000
Cement
Weight 1 bag cement Bags(10kgs per bag)
10
Concrete
Plasterring
Sand
Weight per elf No. of Elf

Aggregates(mix)
Weight per elf No. of elf
Concrete Works
Height(m) Area(sq.m) Volume(cu.m)

6 0.16 3.84
6 0.08 1.44
6 0.09 1.08

0.35 1.69 3.549


0.35 0.72 0.504
0.35 1.04 0.364

0.3 15.78 4.734

0.3 0.08 0.024


0.3 0.12 0.036

0.3 15.945 4.7835


0.3 25.512 7.6536

0.1 41.16 4.116


0.1 18.3 1.83
0.1 42.18 4.218

61.2
84
240
6 385.2 19.26

57.43

unit cost per CHB Cost


12 ₱21,780.00
16 ₱48,000.00
₱0.00
Cost per bag Cost
235 ₱0.00

cost per 1 elf Cost


1800 ₱0.00

Cost per Elf Cost


1700 ₱0.00

You might also like