GENERAL AND VISUAL INSPECTION:

S.NO DESCRIPTION RESULT REMARK


1 CLEANING OF PANELS
2 TIGHTNESS OF
CONNECTION
3 CONTINUITY CHECKS
OF CABLES
4 CT IS MOUNTED ON
“R” PHASE
5 CAPACITANCE
MEASUREMENT
6 IDENTIFICATION OF CT
WIRING
7 IDENTIFICATION OF
POWER CABLES
8 EARTHING BUS IS
CONNECTED
9 INSULATION
RESISTANCE TEST
CODUCTED BY
CAPACITORS
10 ISOLATOR OPERATION
11 CONTACTOR
OPERATION
12 ANY LEAKAGE FOUND
IN CAPACITORS
13 ANY DEFORMATION
FOUND IN CAPCITORS
14 FILTER REACTORS ARE
CONNECTED TO EACH
CAPACITORS
SEPARTELY
15 OPERATION OF P.F
CONTROLLER
16 FAN OPERATION OF
PANELS
17 AUXILIARY VOLTAGE
OF PF CONTROLLER
18 FUSE CHECKS
19 TIGHTNESS OF CT
CONECCTIONS
20 ENCLOSURE OF THE
PANEL
21 INDENTIFICATION
LABELS