REPORT
Audit Opening
Meeting / Time
Introduce Audit Team
Executive Summary:
1.3
(confined space,
excavation, hot work etc…)
7. OSH/EHS alert
8. Risk Register
9. Legal Register
8.0 Safe Access To The Workplace:
S.N Ye N/ Comments (NCR &
Items No
0 s A Observation)
Can everyone on the project reach
their workplace safely? E.g. are
roads, gangways passageways,
8.1
passenger hoists, staircases,
ladders & scaffolds in good
condition?
Are there guard rails or equivalent
protection to stop falls from open
8.2 edges on scaffolds, mobile
elevating work platforms, site
gangways, excavations, etc.?
Is there effective housekeeping
8.3 arrangements (Resources and
Procedures)
Are all working areas and
walkways even and free from trip
8.4
hazards, obstruction such as
stored material and waste?
Are there suitable arrangements
8.5 for collecting and disposing of
waste materials?
9.0 Confine Space:
S.N Ye N/ Comments (NCR &
Items No
0 s A Observation)
Is permit to work implemented
along with specific approved
9.1
method statement and risk
assessment?
Is gas testing undertaken prior to
commence the work and gas
9.2
continues monitoring during the
work process?
Is there any rescue plan for
confined space along with
9.3
adequate arrangement and
resources?
9.4 Is there any log in/out for the
entry staff?
Is there adequate lighting and
9.5
ventilation being provided?
Are all hot works control measures
9.6
provided?
Is there confined space watch
9.7
man/ close supervision?
Are health and medical fitness
9.8 certificates required for
employees
10.0 Working at Height:
S.N Ye N/ Comments (NCR &
Items No
0 s A Observation)
Are all scaffolding erected,
10. modified, and dismantling by
1 competent and certified
scaffolders? (Organization chart)
Are all scaffolding and ladders
10.
inspected and tagged by certified
2
persons?
10. Are all register being maintained
3 for scaffolding and ladders at site?
Are all working at height platform
and roof provided with guardrail,
10.
lifeline or any means of
4
protection? (False Work-
Formwork)
Are all persons working at height
10. trained and having tested and
5 approved full body safety harness
with double lanyard?
Are all access to the working at
10.
height safe and free from
6
obstacles?
Are all man basket/ mobile
elevated work platform/ man-lift
at site clearly identified the
capacity? Are they certified by 3rd
10.
party? Are they operated by 3rd
7
party trained users? (Scaffold
more than 10-meter height design
calculation and approval is
required)
10. Are working platform provided
8 with net to prevent falling
personnel and objectives? “If
required”
11.0 Excavation:
S.N Ye N/ Comments (NCR &
Items No
0 s A Observation)
Is Permit to Work obtained prior to
start any excavation work and
11.1 linked with method statement, risk
assessment and authorities
approval?
Are there any methods to scan
11.2 utilities before start the
excavation?
Are there any precautions
methods used to prevent
11.3 excavation collapse? (support
method, support system,
dewatering)
Is there safe access to the
11.4
excavating?
Are materials spoil or plant stored
away from the edge of the
11.5
excavation in order to reduce the
likelihood of a collapse?
Is the excavation inspected by a
competent person at the start of
every shift and after any
11.6
accidental collapse, adverse
weather or event likely to effect
on stability?
Is there sufficient and adequate
11.7 signage with hard barriers
provided?
12.0 Manual Handlings:
S.N Ye N/ Comments (NCR &
Items No
0 s A Observation)
Has the risk of manual handling
12.1
injuries been assessed?
Are there mechanical aids, any
plant or equipment for lifting
12.2
heavy objects to avoid manual
handling?
Are materials such as cement
ordered in 25kg bags whenever
12.3
practicable? (depend on activity
risk assessment)
0 s A Observation)
Have emergency procedures been
developed, e.g. evacuating the
site in case of fire? Is all
16.1
emergency scenarios are covered
in the procedures? Is emergency
organization chart prepared?
Are emergency response team
16.2 trained and understand their roles
and responsibilities?
Are people on site aware of the
16.3 procedures? Are they posted on
site?
Is there a means of raising the
16.4
alarm and does it work?
Are there adequate escape routes
16.5
and are these kept clear?
Is there scheduled and
16.6
unscheduled emergency drills?
17.0 Fire (Refer to Fire Safety Audit Checklist Report)
S.N Ye N/ Comments (NCR &
Items No
0 s A Observation)
Is fire prevention planning and
control for site and offices
prepared? Is it approved?
Are all key elements are covered
in this plan? (I.e. Firefighting
17.1
system/ equipment, emergency
and contingency plan,
organization chart for first aider,
fire marshal and warden, third
party test, fire drill etc.)
Is fire risk assessment
conducted /carried out? Are all
17.2
agreed control measures
implemented?
Is fire audit conducted regularly?
17.3
Is it closed out?
18.0 Health and Hazardous Substances
S.N Ye N/ Comments (NCR &
Items No
0 s A Observation)
18.1 Are the health hazards that may
be present on the project site
evaluated appropriately by
competent persons and
implemented at site?
Are all vibration sources assessed
(Hand arm vibration & Whole-body
19.8
vibration)? Are control measures
identified and implemented?
20.0 Protecting the Public /3rd Party / Environment
S.N Comments (NCR &
Items Yes No N/A Observation)
0
Are the public fenced off or
otherwise protected from the work
20.1
(hazards and risks associated with
activities?
Are the gates to the working site
20.2 secured 24/7 and controlled by an
approved security guard?
Is the perimeter fencing secure
20.3
and undamaged?
Are excavations and openings
20.4 securely protected, covered or
fenced off?
Are environment (i.e. water
20.5 sources, flora and fauna) are
identified and protected?
Is there a dust control measure at
20.6 site with effective dust
suppression arrangement?
HAZARDS / NEAR MISS REPORTING, INCIDENTS REPORTING AND
21.0
INVESTIGATION
S.N Ye N/ Comments (NCR &
Items No
0 s A Observation)
Are there means and procedures
for reporting hazards, serious OSH
incident and non-serious OSH
21.1 incident? Are these recorded
reported and serious OSH incident
reported to Sector Regulatory
authority?
Are all incidents reported in line
21.2 with the ALDAR and OSHAD-SF
requirements? (mechanism 11)
Are all incidents being
investigated by competent
21.3 personnel and corrective /
preventive actions taken to
prevent recurrence?
27.3
27.4
Attach documents if
Necessary (Plans, Photos, Yes □ NO □
layout drawing etc.).
Notes:
1. PMC, Consultants and Principle contractors shall undertake specific Quarterly
OSH/EHS audit on OSH/EHS system.
2. PMC, Consultants shall incorporate the audit time/date quarterly in their
proactive monitoring program.
3. PMC, Consultants shall carry out and complete preparing the quarterly OSH/EHS
audit report then verify the findings with ALDAR OSH/EHS prior to issue officially
4. PMC & Consultants shall ensure that the Principle contractor will produce an
action plan to close out the highlighted issues in timely and practical manner
across whole site
5. PMC, Consultants and Principle contractors shall ensure the maintenance of
OSH/ EHS records and close out report as necessary to demonstrate conformity
to the requirements at all times.
6. PMC, Consultants and Principle contractors shall ensure full compliance with all
UAE regulations and new update revision and requirements (OSHAD-SF)
www.oshad.ae & ALDAR OSH/EHS Management System Element 02.
7. Attendance sheets for open and close out meetings shall be attached along with
audit’s evidences.