Professional Documents
Culture Documents
being checked
OSH/EHS Plan Checklist Assessor
including revision
Name
(OSH Plan) date
Project title
Entity Signture:
Entity Name
Does the Contractor's construction stage' Environmental, OSH/EHS Plan Yes No Comments
Health and Safety Plan' include: Ref.
1 Description Of the Project (Project Details)
1.1 Name of the project
2 Document Control
2.1 Is the initial issue date of the OSH-CMP clear?
3 Project description
3.1 Project description (location)
4.3.1 General
4.8.4 Consultation
4.9.1 General
5.19 Roofs
5.23 Piling
6 Appendices
7 Additional requirement:
7.3
7.4
Action Required
Yes
Please include all items covered under comments and resubmit Rejected
No Approval
Notes: 1- All the above inserted definitions for each item could be changed due to OSHAD-SF updated revision therefore consultant and contractor shall