Date: Jan 09, 2007 CHECK LIST FOR DATA SHEET

Rev.: 0 (API 610, 8th edition datasheet) (FOR RFQ) Page 1 of 5

CHECK LIST FOR DATA SHEET (API 610, 8TH EDITION)


FOR CENTRIFUGAL PUMPS
(FOR RFQ)

0 First Issue Jan 09, 07


BPP VSJ TKG
Written Checked Approved Date
Rev. Description
By By By

L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY
Date: Jan 09, 2007 CHECK LIST FOR DATA SHEET

Rev.: 0 (API 610, 8th edition datasheet) (FOR RFQ) Page 2 of 5

ENGINEER

CHECKER

LE / GL
SR. DESCRIPTION REMARKS

PUMP DATASHEET (FOR ENQUIRY)

1.0 Common Points

1.1 Ensure that the following information is mentioned:

a) Project Code, Project Title & Client’s Name  

b) Document Number and revision Number   

c) Pump Item No.   

d) Pump Service   

e) Number Required   

f) Type of Pump (If specified in the Process Datasheet)   

2.0 Sheet 2 of 6

Parallel / series operation of pumps is indicated as per process


2.1   
data sheet.

Pump item numbers & total number of pumps, which are motor
2.2   
driven, & which are turbine driven is mentioned.

2.3 Operating conditions are in line with process data sheet.   

Properties of pumped liquid, H2S, Chlorine concentration are


mentioned.
2.4   
Category of liquid i.e. hazardous / flammable is mentioned as
per process data sheet.

Process minimum flow, maximum suction pressure & process


2.5 variations are mentioned and are in line with the process data   
sheet.

Datum reference for NPSH Available is mentioned as per


process data sheet. If this information is not available in the
2.6   
process datasheet, the same shall be confirmed from Process
Dept.
  
2.7 Starting conditions (e.g. auto-start) are mentioned as per the

L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY
Date: Jan 09, 2007 CHECK LIST FOR DATA SHEET

Rev.: 0 (API 610, 8th edition datasheet) (FOR RFQ) Page 3 of 5

ENGINEER

CHECKER

LE / GL
SR. DESCRIPTION REMARKS

Process Datasheet & P&ID.

Site & Utility data are specified as per the Basic Engineering
Design Data (BEDD).
2.8   
Electrical area classification is mentioned as per Hazardous
Area Classification.

In case cooling water data for steam/cooling water are not


2.9   
available, check with Process Department for the same.

2.10 The maximum permissible sound pressure level is mentioned.  

2.11 Notes are mentioned for the following under Remarks:

a) Downstream Design Pressure   

b) Guaranteed BkW (Considering +0% tolerance)   

c) Scope of supply for ARC Valve, Orifice Plate, etc. as


  
applicable

d) Requirement for self-venting pump  

e) Number of starts/stops for pumps (for Auto-Start case)   

f) Any other specific notes as applicable   

3.0 Sheet 3 of 6

Applicable standards for pump are mentioned. Applicable Job


3.1   
Specification and Project Specification are referred.

3.2 Pump type is mentioned. (If specified in the Process Datasheet)   

Design of suction pressure regions for pump MAWP is indicated


3.3   
as per the project specifications.

3.4 Centerline Support is specified  

3.5 Nozzle flange finish, rating is specified as per P&ID  

Material Class as per Appendix H of API 610 & minimum


design temperature is mentioned as per process data sheet.
3.6   
Material for individual components is indicated as applicable.

L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY
Date: Jan 09, 2007 CHECK LIST FOR DATA SHEET

Rev.: 0 (API 610, 8th edition datasheet) (FOR RFQ) Page 4 of 5

ENGINEER

CHECKER

LE / GL
SR. DESCRIPTION REMARKS

Suitable note for conformity to applicable NACE standard (If


3.7   
applicable) is mentioned in the remarks.

Check for oil mist lubrication/pressurized lubrication


3.8   
requirement as per project specifications/process data sheet.

4.0 Sheet 4 of 6

For seals as per API 682, the API seal code is indicated as per
4.1   
process data sheet.

Primary & secondary seal flushing piping plans are mentioned


4.2   
as per the process data sheet.

If Plan 32 or 54 is specified in the Process Datasheet, ensure


4.3 that the required utility is available and the same is specified in   
the datasheet.

5.0 Sheet 5 of 6

Instrumentation for Vibration monitoring, bearing temperature is


5.1   
indicated as per project requirements.

5.2 Other Purchaser’s requirements are indicated as applicable.   

6.0 Sheet 6 of 6

All QA/QC Inspection and Test requirements as per project


specifications/ITP are indicated.

Following tests shall be specified as ‘Witness Test’ as a


minimum.
6.1   
1. Hydrostatic test
2. Performance Test
3. NPSH test (If Applicable)
4. Mechanical Run Test.
5. Complete Unit Test.
7.0 For Vertical Pump (Supplemental sheet)

Vertical type of pump is indicated as per the process data


7.1   
sheet.

Requirements of resonance test & structural analysis are


7.2 indicated as per the project specifications & guidelines of API-   
610.

L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY
Date: Jan 09, 2007 CHECK LIST FOR DATA SHEET

Rev.: 0 (API 610, 8th edition datasheet) (FOR RFQ) Page 5 of 5

ENGINEER

CHECKER

LE / GL
SR. DESCRIPTION REMARKS

Sump depth, sump dimension & low liquid level are indicated
as per process data sheet.
7.3   
The vessel data sheet shall be referred for vessel-mounted
pumps. (e.g. CBD Pumps)

Signature

L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY

You might also like