Check Provision for CT/VT tapping in corresponding
Panels. Check available space for the Panels Measure the length between Switchgear/LCC panels and our metering panel for CT/VT wirings. ________ Check Provision for AC/DC tapping in corresponding Panels. Measure the length between AC/DC source and our metering panel. ________ Measure the length between LAN/WAN panel and our metering panel.
Need SLD for station, drawings for Corresponding
transformers and existing metering panel. Check available space for the meters in the panel. Check Provision for CT/VT tapping in corresponding Panels. Measure the length between Switchgear/LCC panels and our metering panel for CT/VT wirings. _________ Measure the length between LAN/WAN panel and our metering panel.