 Need all necessary drawings.

 Check Provision for CT/VT tapping in corresponding


Panels.
 Check available space for the Panels
 Measure the length between Switchgear/LCC panels
and our metering panel for CT/VT wirings. ________
 Check Provision for AC/DC tapping in corresponding
Panels.
 Measure the length between AC/DC source and our
metering panel. ________
 Measure the length between LAN/WAN panel and our
metering panel.

 Need SLD for station, drawings for Corresponding


transformers and existing metering panel.
 Check available space for the meters in the panel.
 Check Provision for CT/VT tapping in corresponding
Panels.
 Measure the length between Switchgear/LCC panels
and our metering panel for CT/VT wirings. _________
 Measure the length between LAN/WAN panel and our
metering panel.