TS305/TS315
Update instruction

Trimble Engineering and Construction Division


5475 Kellenburger Road
Dayton, Ohio 45424-1099
U.S.A.
+1-937-233-8921 Phone

www.trimble.com
TRIM TRIM TRIM TRIM
BLEED BLEED BLEED BLEED
TRIM
BLEED
TRIM
BLEED

TRIM
BLEED
TRIM
BLEED

TS305/TS315 Construction Total Stations User Guide (A5) 022493-026 (reorder P/N)
Instruction

TS 305,
a nd
TS 315

U-1
Update

An update is necessary if you load a new software


version onto of the instrument.
Before starting the update, please save your data
and use a fully charged accumulator battery.

The simplest way to get an update is via the Inter-


net.

G Attention !
Different hardware versions require different
update versions.

In any case, please pay attention to the


correct update - the correct instrument name
when selecting the update files.
Once unpacked the files, the instrument type
can no longer be concluded from them.
This software describes the update of the
instruments Elta 40R, Elta 50R und Elta 50.
Doing the update with instruments younger
generations please check the table below bef
ore:
Elta 50R à Elta R55 à C 55 à TS315
Elta 50 à Elta R50 à C 50 à TS305

U-2
Update

Cable

The Update is carried out


between and through

TS 300 PC cable

This cable is also used for data transfer. The


adapter included in the delivery allows the con-
nection to 9 and 25 channel sockets.
708177-9470.000

U-3
Update

Copy the contents of the diskette into a directory


of your choice or start the software from the disk-
ette (default).
Switch the instrument on and select the item Up-
date.

Preparation on the PC

& Please follow


also the update in-
structions enclosed

z : to end the program


u
t : to select function
j : to confirm selection
Configuration

Enter your data here.


The configuration can be
stored subsequently.

z : to end mask input


j : to end line input

Elta 40R

The question whether the


Elta is in working order is to
be answered in any case
with YES.

j : to confirm

U-4
Update

Please follow now exactly


the instructions given on
the screen.

j : to select the single


steps

TS300 display:

Update
NEIN
to go to the menu
JA
to start update

From now on, the PC soft-


ware controls the instru-
ment.

Update Elta 40R

Selection of the language


desired (if available)

z : to end selection of
language

U-5
Update

Starting Update

z to start update
This operation takes some
minutes comprising the
transfer of one file with 30
and 4 files with 514 data
records each.

The end of the update is acknowledged by clear


acoustic signals. The instrument is switched off by
software. The update has now been completed.
Update completed is flash-
ing

j : to go to the start-up
menu

F Tip
If no connection is achieved, in all probability
the wrong interface has been selected or
there is an error in the reference.
Please pay also attention to a perfect cable
connection.

U-6
Update

G Attention !
Even after the update was succsessful the
instrument could show a error message.
This could caused by the high processing
speed of the modern PC’s.
In this ocasion please confirm the message
and start the instument again.

U-7
BLEED
BLEED

TRIM
TRIM

BLEED
BLEED

TRIM
TRIM
BLEED BLEED BLEED
TRIM TRIM TRIM

TS305/TS315
Guide de l'utilisateur pour les
stations totales destinées
à la construction

Trimble Engineering and Construction Division


5475 Kellenburger Road
Dayton, Ohio 45424-1099
U.S.A.
+1-937-233-8921 Phone

www.trimble.com
TRIM TRIM TRIM TRIM
BLEED BLEED BLEED BLEED
TRIM
BLEED
TRIM
BLEED

TRIM
BLEED
TRIM
BLEED

TS305/TS315 Construction Total Stations User Guide (A5) 022493-026 (reorder P/N)

You might also like