Minimum PPE’s are required (safety helmet, safety shoes, safety glass and
Personal Protective Equipment
long sleeves) & ready to wear Approved and Inspected Full Body Harness
Required
with double lanyard.
TASNEE PROJECT
JOB SAFETY ANALYSIS Check One Revised JSA X Review Date
Revision #:
New JSA
√
BASIC JOB STEPS POTENTIAL HAZARDS RECOMMENDATIONS
PRE-COMMENCEMENT ACTIVITIES
1. Pre-approval of foundations for rail system 1.1. Catastrophic accident due to low quality of 1.1.1. Provide as Build drawings and necessary documents
installed at the site, including the electrical foundation and electrical Preparation 1.1.2. Requires d approval
supply 1.1.3. Only qualified electrician for installation of power cables
electrical lines
1.1.4. Ensure that electrical supply is off, lock, and if necessary
tagging system is required all power sources are isolated
and locked out/tagged out
2. Pre-Commencement Activities (Obtain ing 2.1. Unnecessary act (unsafe act and unsafe 2.1.1. Fully planned work activity with written step-by-step
Method Statement, J.S.A. approval and condition) due to unplanned and no procedure work method and condition including all to safety
STARRT Form) filled in prior to commencing for to the task requirements
activities 2.1.2. Toolbox talks using the STARRT form and JSA
2.1.3. Restriction of the area (Barricade) Work area to be fully
barricaded, access restricted to authorized personnel only
3. -Site preparation 3.1. Delays to assembly construction (Assemble) 3.1.1. Provide drivable passable road toto the erection site ,
ensure and that part of the track and electrical supply are
ready
3.1.2. Provide flow of traffic route (signboard: arrows detour,
etc.)
-Slinging preparation Rigging Preperation 3.1.3 Provide traffic enforcer controller , controller to wear
worn high visible visibility vest (flag-man)
3.2. Sling damage and material fall may cause to 3.2.1. Use softener (protection pad) to protect the sling to from
catastrophic accident Damaged rigging/lifting damage
equipment – possible accident/incident, injury 3.2.2. Rigging planning for the description of sling and shackle
or asset damage requires Rigging plan to identify the slings and shackles
to be used during lifting (all rigging lifting equipment to
display current colour code)
3.2.3. Proper cCommunications of the rigger and the foreman
in charge between the foremen and riggers
3.2.4 Work area to be fully barricaded, access restricted to
authorized personnel only
Perimeter area should be barricaded (Restriction)
TRANSPORTING MATERIALS
4. Ensure the safety transportation of 4.1. Material Falls traffic hazard Falling materials, 4.1.1. Use Approved crane with 3rd party and site inspection
Components of Tower Crane to site from hazard to traffic 4.1.2. Use Approved Trailer truck / low bed
Outside (the crane parts have been 4.1.3. Ensure material fastened with approved chain or binder
dimensioned in such a way that no special slings
transport arrangement are needed) 4.1.4 Signboard / warning tapes should be attached in
extended materials Hazard warning signs to be attached
to any overhanging sections of the load
5. Ensure the counter weights on a truck 5.1. Material Falls, equipment breakdown traffic 5.1.1. Ensure the is planned to be carried out using strong
Counter weights to be loaded and secured on hazard Falling materials, equipment truck Selection of the correct equipment to carryout the task
the truck breakdown, traffic hazard 5.1.2. Ensure that all technical data is available at the truck All
equipment to be verified as road worhty
5.1.3. Ensure that counter weight values are correct.
6. Receiving equipment/materials at site (the 6.1. Traffic Hazard 6.1.1. Good communication between the transporter and the
reception and unloading of components the site receiver
parts must be performed systematically) 6.1.2. Turn on Flashing light / Hazard light
6.1.3. Banks man post and directing the traffic Traffic
controller to direct equipment on to site
6.1.4. Transport Group will guide/ convoy the vehicle lead the
vehicles to site
General Instruction:
The reception and unloading of the parts must be performed
systematically
7. Unloading Material using Mobile Crane (crane 7.1. Material Falls, Falling materials, 7.1.1. STARRT meeting to be conducted, form filled in and
to be set up on firm and level ground) Environmental hazard displayed at the working locationSTARRT, Form to be
attended and filled
7.1.2. Use Approved crane with 3rd party and site inspection
Use Approved crane with daily inspection
7.1.3. Use softener (protection pad) for slings to protect from
damage ing
7.1.4. Use approved slings with monthly color code All
rigging/lifting equipment to be inspected and display current
colour code
7.1.5. Ensure presence of trained riggers well identified on the
jobsite, use tag lines to control the load Only trained
riggers to work with the crane, tag lines to be used to
control the load
7.1.6. Work area to be fully barricaded, access restricted
authorized personnel only Perimeter area should be
barricaded (Restriction)
7.1.7. Report all environmental spills
General Instruction:
-Only approved equipment to be used (crane,etc) No defective
crane should be in use
- No standing under the a suspended load
9. Using mobile crane (crane to be set up on 9.1. Material Falls, Falling materials 9.1.1. STARRT STARRT meeting to be conducted, form filled
firm and level ground) Environmental hazard in and displayed at the working location Form to be attended
(Same comments as 7.1.) and filled
9.1.2. . Use Approved crane with 3rd party and site inspection
Use Approved crane with daily inspection
9.1.3. Use softener (protection pad) for slings to protect from
damage ing
9.1.4. All rigging/lifting equipment to be inspected and display
current colour code
Use approved slings with monthly color code
9.1.5. Only trained riggers to work with the crane, tag lines to
be used to control the load
Ensure presence of trained riggers well identified on the
jobsite, use tag lines to control the load
9.1.6. Work area to be fully barricaded, access restricted
authorized personnel only Perimeter area should be
barricaded (Restriction)
9.1.7. Report all environmental spills
General Instruction:
- No defective crane should be in useOnly approved
equipment to be used (crane,etc
- No standing under a suspended load No standing under
the load
General Instruction:
- No defective tools is are allowed
- No fabricated tools is are allowed
General Instruction:
- Only qualified specialized personnel is required to do the
taskEmployees trained in Tower Crane erection to carryout the
erection at site
- No defective crane should be in use Only approved
equipment to be used (crane,etc
- No standing under the load No standing under a suspended
load
General Instruction:
- No defective tools is allowed
- No fabricated tools is allowed
13. Working at heights 13.1. Hazard to fall Fall Hazard (material and 13.1.1. Tool Box Talks to includes the proper correct wearing
worker) (workers and material) and correct use of the Full Body Safety Harness.
13.1.2. Pre training of how to use double lanyard, to and
ensure ing the 100% tie-off
13.1.3. Provide Full Body Safety Harness with double lanyards
(colour coded) and shock absorber for all erectors
13.1.4. Only trained / experienced person are allowed to do
the task Employees trained in Tower Crane erection to
carryout the erection at site
13.1.5. All work requires d supervision
13.1.6. Restriction (close barricades) of the working area, .
Work area to be fully barricaded, access restricted authorized
personnel only
warning signs “DANGER” Crane Lifting
13.1.7. PPE shall be worn all time
13.1.8. All materials and tools to be use at heights shall be
properly secure and tied off
General Instruction:
- Only qualified specialized personnel is required to do the
taskEmployees trained in Tower Crane erection to
carryout the erection at site
General Instruction:
- No defective tools is allowed
- No fabricated tools is allowed
General Instruction:
- Only qualified specialized personnel is required to do the task
- No defective crane should be in use Only approved
equipment to be used (crane,etc
17. Electrical connection 17.1. Electrocution 17.1.1. Ensure that electrical supply distribution box is lock
and power is turned off. (lockout/tag out)
17.1.2. Only qualified electrician is approved to do carryout the
task
17.1.3. Ensure all electrical connection are water proof and
heavy insulated
18. Working at heights 18.1. Hazard to fall (material and worker) 18.1.1. Tool Box Talks includes the proper wearing and correct
(same coment as 13.1) use of the Full Body Safety Harness.Tool Box Talks to
include the correct wearing and use of the Full Body
Safety Harness
18.1.2. Pre training of how to use double lanyard, and ensuring
the 100% tie-offPre training of how to use double
lanyard, to ensure 100% tie-off
General Instruction:
-Care must be taken not to batter the lifting cable
General Instruction:
- Only qualified specialized personnel is required to do the task
- No defective crane should be in use Only approved
equipment to be used (crane,etc
ERECTION and INSTALLATION OF -Ensure that the cabin is well and properly fastened and secure
OPERATOR CABIN on the upper part of the slewing part.
-Refer to the technical data.
21. Using mobile crane (crane to be set up on 21.1 Material Falls, Environmental hazard 21.1.1. STARRT Form to be attended and filled STARRT
firm and level ground) (same comment as 7.1.) meeting to be conducted, form filled in and displayed at the
working location
General Instruction:
- Only qualified specialized personnel is required to do the task
- No defective crane should be in use Only approved
equipment to be used (crane,etc
22.2.1. Be sure that all locking device are working and tested
prior to installation of the ballast weight
22.2.2. Barricade the area (restriction) Work area to be fully
barricaded, access restricted authorized
22.2.3. Ensure that the ballast weight is equal to 2000 kg. and
not more than 2000 kg.
22.2.4. Refer to instruction manual (Significance of the ballast
weight)
22.2.5. Restriction of the area. Work area to be fully barricaded,
access restricted authorized
23 Installation / connection of hydraulic system, 23. 1. Catastrophic incident due to hydraulic / 23.1.1 . Only trained / experienced person are allowed to do
aggregate, and hoses (including electrical electrical fault and working at heights the task
supply) 23.1.2. Ensure the 100% tie-off (Full body Harness with double
lanyard and shock absorber)
23.1.3 Refer to instruction manual (Erection Hydraulic)
23.1.4. Restriction of the area. Work area to be fully barricaded,
access restricted authorized
General Instruction:
- During jacking, the jib MUST NOT BE TURNED MOVED,
- The crane MUST NOT BE USE FOR LIFTING DURING
JACKING
- Push carefully the Tower Part inside the cage in the middle
as possible
26. Crane adjustment and testing for operation 26.1. Catastrophic incident due to Tower crane 26.1.1. Notification / Information to all workers regarding the
collapse testing and adjustment.
26.1.2. Re-check of all connection specially the Running
diagram of the ropes of the trolley’s transfer winch
26.1.3. Pre-Tightening of the HYDROCAM device
26.1.4. Restriction of the perimeter area.
26.1.5. Before test running, the rail clamps must are to be
opened.
26.1.6. Use only approved testing load equipment
26.1.7. Availability of qualified rigger is necessary
2. Finishing work 2.1 Falling material and hazard to fall Falling 2.1.1 All materials need to bring down should be properly
materials, Fall Hazard manage (using ropes, tower crane, mobile crane lifts) All
materials to be removed from the tower crane shall be lifted
using, crane, tower crane, etc
2.1.2 Good housekeeping