TILARI (MAJOR) INTER STATE IRRIGATION PROJECT

PRINCIPAL FEATURES OF PROJECT


1. Scope of Project Storage Dam across River Tilari, near Village Tilariwadi & Pick
up Weir near village Terwanmedhe to utilise tail race waters
of Tillari Hydro Electric Project on the U/S of Main Dam. Both
Dam & Pick Up Weir are located in Tal-Dodamarg, Dist-
Sindhudurg, and Maharashtra State. This is a Joint Venture of
Govt. of Maharashtra and Govt. of Goa.

2. Particulars Details
A. Source Main Dam Pick Up Weir
River Tillari West Kharari Nalla & Tail
B. Location flowing river race water of Tilari Hydro
Electric Project.
1 State Maharashtra Maharashtra
2 Zone Western Western
3 District Sindhudurg Sindhudurg
4 Taluka Dodamarg Dodamarg
5 Topo Sheet No. 48 I / 1,2,5 & 6 48 I / 1 & 2
6 Latitude 150 45’ 30” (N) 150 46’ 54” (N)
7 Longitude 740 05’ 30” (E) 740 05’ 21” (E)

3. Upstream Utilisation -------------- 91.13 Mcum.


Of Hydro releases.

4. Yield & Utilisation


A. Catchment Area 301.27 sq.km. 88.91 sq.km.
( 116.32 sq. miles ) ( 34.33 sq. miles )
B. Rainfall in Catchment 5588 mm to
5588 mm to 2280 mm
2280 mm
(2230” to 90” )
( 220” to 90” )

5. i. 75% dependable Main Dam Pick up Weir Total


772.35 Mcum. 91.13 Mcum
(29000 Mcft.) (3217 Mcft)
Hydro
Release
ii. Gross Annual Utilisation
a. Irrigation 393.395 91.00 484.395
b. Drinking & Industrial use. 111.465 -- 111.465
c. Evaporation 25.140 -- 25.140
530.00 91.00 621.00
iii. % of Annual Utilisation to annual
yield. 64.55% 100%

6. Dam & Reservoir Main Dam Pick up Weir Total


A Gross capacity of storage 462.17 Mcum 2.026 Mcum.
B Dead Storage 14.88 Mcum. 0.180 Mcum.
C Live Storage 447.29 Mcum. 1.845 Mcum.
D Annual evaporation losses. 25.14 Mcum.
Main Dam Pick up Weir
E i. Area under Submergence 1772.00 Ha. 100.00 Ha.
ii. Name of villages affected. 1. Ainode 1. Terwanmedhe
2. Sargave
3. Shirange
4. Patye
5. Pal
6. Kendre
7. Konal
(Bhardongarwadi)
iii. Name of Gaothan to be 1. Ainode 1. Harijanwadi of
shifted 2. Sargave Terwanmedhe
3. Shirange Village.
4. Patye
5. Pal
6. Kendre.
7. Konal
( Bhardongarwadi )

F. Type of Dam Earthen Dam Masonry Work


a. Radial Gates Gated spillway on left Pick up weir gated
flank in the Saddle. spillway
12 m. x 6.5 m. - 4 Nos. 12 m. x 5 m. - 7 Nos.
b. Service Gat 3.50 x 3.50 m. – 1 No.
c. Emergency Gate 3.896 x 3.896 m. – 1
No
G. Maximum height of Dam.
i. From river bed 72.50 m. 12.52 m.
ii. From Foundation 74.50 m. 13.40 m.

H. Controlling levels
i. Top of Dam 118.50 m. 67.40 m.
ii. H.F.L. 117.52 m. 65.60 m.
iii. F.R.L. 113.20 m. 65.00m
iv. M.D.D.L. 64.00 m. 64.10m
v. C.B.L. 58.00 m. 61.00m
vi. River Bed level 46.00 m. 54.88m

I. Length Total
i Masonry ------ 278.50 m. 175 m. .
ii Earthen 1035 m. ------- 99 m.
J. Free Board 2.80 m. 2.80 m. 2.40 m.
K. Spillway
i. Type Gated having 4
Gated ogee having 7
Nos. radial
----- Nos. radial gates of
gates of size 12
size 12m. x 5m. each.
x 6.5 m. each
ii. Design flood at F.R.L. ----- 7270 cumecs 1307 cumecs.
and @ M.W.L. ----- 3233 cumecs
for 4 gates.
iii. Depth over crest. ----- 6.50 m. 5.00 m.
iv. Length ----- 57 m. 99 m.
7. Canals :
Total length
Length Discharge
in Km. as per
Name of Canal after cumecs
Project
Survey (Cusecs)
Report
1. Left Band Canal
32.56
a. Maharashtra 33.00 18.799
(1150)
b. Goa 48.80 37.400
Total....
81.80 56.199

2. Right Bank Canal


i) From Pick-up-weir to Parma Aqueduct
Maharashtra
a. 18.00 14.762 2.89 (102)
b. Goa -- --
ii) From Parma Aqueduct onwards.
a. Maharashtra 28.00 9.930 14.50(510)
b. Goa. 40.80 24.000 --
Total 86.80 48.692
3. Link Canal :
a. Maharashtra. 4.15 3.53 12.00 (424)
4. Sangulium Branch Canal :
b. Goa. 14.60 13.80 4.24 (156)
5. Banda Branch Canal :
a. Maharashtra 47.00 57.00 6.50 (230 )
Main
Total length + Branches = Total
Canal
Maharashtra 47.021 57.00 104.021
Goa 61.400 14.00 75.400
Total 108.421 61.00 179.421
6. Command Area
i. Gross : 28336 ha.
ii. Culturable : 21197 ha.
iii. Irrigable : 21197 ha.
iv. Cropped : 30733 ha
Maharashtra: 6676 ha. Of Sawantwadi Taluka in Sindhudurg District.

Goa : 14521 ha. from Bicholium,Bardez and Pedne Taluka

7. Crop Pattern :
A. For Maharashtra State: (6676 ha.)
Particulars Existing Proposed (%)
i. Sugarcane -- 10
ii. Coconut -- 10
iii. Pineapple -- 5
iv. Banana -- 10
Kharif Seasonal
a. Paddy : 58 50
b. Wari, Nagli, Barik : 5 --
Rabi Seasonal :
a. Paddy : -- 10
b. Chilli’s (Vegetable) -- 5
c. Pulses : 2 10
d. Hybrid Jawar : -- 5
e. Water Melon : -- 5
Hot Weather Seasonal :
a. Ground Nuts : 1 25
b. Cashew Nuts : 14 --
c. Culturable Folow: 15 --
d. Waste Land : 5 --
Grand Total..... : 100% 145%

B. For Goa State : ( 14521 ha.)


Particulars : Existing Proposed
Bardez Bicholim Pedne
Perennials
a. Sugarcane -- -- -- 10%
b. Garden Crops 10% 5% 4% 20%
c. Bananas -- -- -- 5%
Kharif Seasonal
a. Kharif Paddy 31% 13% 22% 50%
Rabi Seasonal
a. Rabi Paddy -- -- -- 10%
b. Pulses -- -- -- 10%
c. Vegetables -- -- -- 15%
Hot Weather Seasonal
a. Ground Nut -- -- -- 15%
b. Paddy Nursery -- -- -- --
c. H.W. Pulses -- -- -- 10%
d. Cashew nuts 14% 39% 34% --
e. Culturable fallow 41% 40% 30% --
f. Waste Land 4% 2% 4% --
Total 100% 99% 100% 145%

8. Normal rainfall in Command Area : 3548 mm. to 2840 mm ( 140” to 112” )

9. Intensity of Irrigation to Command Area. : 84.00 %

10. Submergence Ratio : 8.66 %

As per IVth Revised


As per IIIrd Revised
estimate approved
estimate approved by
by TAC of CWC
Govt ( RSR 2005-06)
( RSR 2008-09)
11. Total cost of Scheme : Rs. 139004.03 lac. Rs. 161215.28 lac.
12. Cost per unit of water utilisation: Rs. 300.76 lac/Mcum Rs. 348.82 lac/Mcum
13. Cost per unit of gross storage : Rs. 223.78 lac. Rs.259.53 lac.
14. Cost per unit of Irrigable area. : Rs. 6.557 lac / ha. Rs.5.933 lac / ha.
15. Benefit cost ratio. : 1.97 1.74