You are on page 1of 46

A. SAADAT & CO.

Consulting Engineers
Airconditioning, Refrigeration,
Mechanical & Electrical Services

Specializing in the Design of


airconditioning, refrigeration, mechanical, electrical, plumbing
water supply & drainage, fire protection services, Process
gases piping, Cogeneration systems, Building automation &
management systems, Plants operation & maintenance
and Project feasibility studies
for
Commercial, Industrial & Institutional Buildings

Astola Project Head Office Building


Getz Pharma Pakistan (Pvt.) Ltd., Karachi. National Bank Of Pakistan, Karachi.

Library Building Finance & Trade Centre, Karachi


LUMS New Campus, DHA, Lahore Replacement of Co Gen Plant
3-Absorption Chillers Total 1180TR Capacity 3x1MW Gen Sets & 4x800TR
Chillers

Company Profile
Contents.

1. Contents Page-1

2. Introduction Page-2

3. Principal Fields of Activity Page-3 to 4

4. Prominent Projects Since 1962-1985 Page-5 to 7

5. Senior Technical Staff Page-8 to 19

6. List of Notable Projects 1968-2000 & 2000 to 2010 Page-20 to 39

7. Major Projects Undertaken In Last Five Years Page-40 to 43

8. List of Major Projects In Hand Page-44 to 45

1
Introduction

A.Saadat & Co., Consulting Engineers, was established in 1962. It is


staffed by qualified and experienced Professional Engineers who have worked in USA,
UK, Europe and Middle East.
The main fields of professional services rendered are listed below.
Projects handled include internal and external services for all types of Buildings and
campuses, industrial and commercial complexes, including multi-storey office
buildings, institutional buildings, University Campuses, computer centres, hospitals &
medical colleges, hotels, cinema auditoriums, Television and Radio Broadcasting
Centres, Laboratories for special research and development, airports, industrial units
including Pharmaceuticals Production units, cotton and synthetic fibre yarn spinning
and weaving units, paints manufacturing, etc.
Mr.Anwar Saadat, Principal of the Company has been associated with
HVACR (Heating, Ventilating, Airconditioning, Refrigeration), Mechanical and Electrical
Services for various types of Buildings since 1950. He completed B.Sc. Honours
(Engineering)from The Punjab College Of Engineering & Technology, Lahore (now
University Of Engineering & Technology, Lahore). He topped the list in 1949 in The
Punjab University and was awarded Gold Medal. He worked with a HVACR Contracting
Firm before leaving for UK on a British Industries Federation 2 years scholarship.
During 1952-58, he completed a post graduate course in HVACR Engineering from The
National College Of Heating, Ventilating, Refrigeration and Fan Engineering, London
(now Institute Of Environmental Engineering, South Bank University), obtained
training and worked in UK, Belgium and USA with HVACR Equipment Manufacturers.
On returning to Pakistan, he worked as Chief Engineer of a HVACR Contracting Firm
till 1962, when he started practicing as a Consulting Engineer.
In consideration of services rendered by him to HVACR Engineering
in the country, he was elected in 1996 as Founder President of Pakistan HVACR
Society. He was elected Vice President of Association of Consulting Engineers Pakistan
in 1990, 1995, 1997 and 2001.

2
Principal Fields of Activity.
The professional services are rendered in all fields of mechanical and
electrical engineering with special interest in the following systems:
1. Year-round airconditioning or airconditioning (summer cooling) or winter
heating systems.
2. Refrigeration systems for low temperature applications.
3. Mechanical environmental systems including air ventilation/exhaust.
4. Pollution Control.
5. Process piping.
6. Plumbing systems including internal & external cold and hot water supply
and drainage systems.
7. Fire Fighting systems including sprinkler systems.
8. Water conservation, water recycling, grey water systems.
9. Irrigation systems.
10. Electrical systems including internal & external electrification &
illumination.
11. Communications, fire/smoke detection and alarms, building automation,
management & security systems.
12. Self Power Generation, Cogeneration Systems.
Pakistan Engineering Council Registration No.CONSULT/521 as
Consulting Engineers for Mechanical, Electrical & Chemical Engineering
Works.
Scope of Services.
The scope of services rendered cover all aspects of engineering projects
such as:
- Consultation
- Investigations & Survey
- Feasibility & Study Reports
- Engineering Design
- Working Drawings
- Technical Specifications
- Bill of Quantities
- Contract Documents
- Cost Estimates
- Evaluation of Bids
- Procurement of Equipment & Materials
- Construction Supervision

3
- Supervision of Commissioning & Testing of Plants & Systems and certification of
satisfactory completion of the work
- Inspection and Revalidation of existing Systems & Plants
- Top Supervision of the Operation & Maintenance Work of Plants

4
PROMINENT PROJECTS SINCE 1962
Since 1962, A.Saadat & Co. has been associated as Consultants for
Year-Round Airconditioning, Heating & Ventilating, Plumbing, Electrical & Mechanical
Systems for a large number of major prestigious Projects in the Country including
multi-storey Buildings, Hospitals, Hotels, Institutional Buildings, Industrial Units and
Special Installations.
To name a few:
- Finance & Trade Centre, Karachi which was the largest single Office
Block in the Country.
- National Assembly Building, Islamabad.
- The Aga Khan University Medical Centre, Karachi (Hospital, Medical
College and School of Nursing). After completion of the main Project in
1985. ASCo were appointed Consultants for the on-going expan-
sions/modifications and new Facilities.
- Multi-Storey Office Buildings & Banks:
Pakistan Secretariat, Islamabad, Phase-II Buildings.
Wapda House, Lahore.
The Dawood Centre, Karachi.
Shell House, Karachi.
State Bank Of Pakistan, Dacca Office Building.
National Bank Of Pakistan, 2000 TR Capacity AC plants Head office ,
I.I. Chundrigar Road Karachi
National Bank Of Pakistan: Regional Office Building, Islamabad.
National Bank Of Pakistan: Shaheed–E-Millat Karachi.
Principal Office Building, Lahore.
Regional Office Buildings at Hyderabad, Quetta and Peshawar.
USSR Chancery Buildings, Islamabad.
Chinese Embassy Buildings, Islamabad.
Habib Bank Ltd., Main Building, Quetta.
State Life Building No.2, Karachi.
State Life Building, Dera Ismail Khan.
- SUPARCO Satellite Ground Receiving Stations at Karachi & Chittagong.
Communication Lab Facilities (GRS), Islamabad.
- Pharma Production Units of major Multi-National Companies
requiring special environmental conditions, over 30 Units. Both original
and subsequent expansions of the Production Facilities.
Abbot Laboratories (Pakistan) Ltd. of U.S.A.

5
Bayer Pakistan (Pvt) Ltd. of Germany
Ciba-Geigy (Pakistan) Ltd. of Switzerland
Clariant (Sandoz) Pakistan Ltd. of Switzerland
Eli Lilly And Company of U.S.A.
GlaxoWellcome Pakistan Ltd. of U.K.
Hoechst Pakistan Ltd. of Germany
Knoll (Boots) Pharmaceuticals Ltd. of U.K.
Merck Sharp & Dhome (Pakistan) Ltd. of U.S.A.
Pharmagen Beximco Ltd. of Korea
Rhone Poulene (Pakistan) Ltd. of France
Searle Pakistan (Pvt) Ltd. of U.S.A.
Smith Kline Beecham (Pakistan) Ltd. of U.K.
Spenser (Fisons) Pharma (Pvt) Ltd. of U.K.
Squibb Pakistan Ltd. of U.S.A.
Wyeth Laboratories (Pakistan) Ltd. of U.S.A.

- Hotels:
Khyber Pearl Continental, Peshawar.
Avari Lahore - Ramada Renaissance, Lahore
Avari Towers - Ramada Renaissance, Karachi.
Hotel Midway House, Karachi Airport, New Block.
Serena Hotel, Faisalabad.
Serena Hotel, Quetta.
Marriott Hotel, Islamabad, New Block.
Pearl Continental Hotel, Bhurbun.
Pearl Continental Hotel, Lahore.

- Industrial Complexes.
PIDC Machine Tool Factory, Landhi, Karachi.
Security Paper Mill, Karachi.
Pakistan Tobacco Co. Ltd. Factories at Akora Khattak & Jhelum.
ICI Pakistan Ltd. Paint Factory, Lahore.
Thal Jute Mills Ltd., Muzaffargarh.
S.G.Fibre Ltd. Polyester Fibre Factory, Karachi.

- Cotton Spinning Mills.


Dawood Cotton Mill Unit Nos.4, 5 & 6, Landhi, Karachi.

6
Kohinoor Spinning Mill, Chakwal.
Mahmood Textile Mill, Unit No.3, Muzaffargarh.
Margalla Textile Mill, Hasan Abdal.
Monnoo Textile Mill, Distt. Lahore.
Shahpur Textile Mill, Chunian.

- Television Centres and Radio Broadcasting Units.


Television Centres at Karachi, Lahore and Quetta.
Pakistan Broadcasting Corporation Broadcasting Studios at Hyderabad,
Karachi, Multan, Peshawar and Rawalpindi.
High Power Transmitter Stations at Hyderabad, Islamabad, Karachi,
Multan, Peshawar, Quetta and Rewat.

7
CURRICULUM VITAE

OF

SENIOR TECHNICAL STAFF

8
Principal: Engr.ANWAR SAADAT

Founder President Pakistan HVACR Society


(terms 1996-1999 & 1999-2001)
President ASHRAE Pakistan Chapter, 2007-08

Vice President Association of Consulting Engineers, Pakistan


(terms 1990-92, 1995-97, 1997-99, 2001-03 & 2005-07)

Life Fellow : The Institution of Engineers, Pakistan.

Life Member : American Society of Heating, Refrigerating &


Airconditioning Engineers Inc., (ASHRAE) U.S.A.

Life Fellow : The Institute of Refrigeration, U.K.

Registered Professional Engineer with Pakistan Engineering


Council.

Educational Qualifications

The Punjab University.

1946 B.Sc., Government College, Lahore


(now Government College University).

1949 B.Sc. Honours (Engineering),


The Punjab College of Engineering And Technology, Lahore
(now University of Engineering & Technology, Lahore).
Topped the list in the University and awarded Gold Medal and
Prize.

The South Bank University, London.

1953 The National College of Heating, Ventilating, Refrigeration and Fan


Engineering, London (now Institute of Environmental Engineering).

Awarded Associateship of the College after completing Post


Graduate Course and the thesis on `Transfer of Heat and Moisture'
was considered as the best.

Professional Experience since 1949

- Engineering Teaching : 1 Year


- HVACR Equipment Manufacturing : 5 Years
- HVACR & Mechanical Contracting : 7 Years
- Consulting Engineering
HVACR, Mechanical, Plumbing &
Electrical Services : since 1962

1949-50 Assistant Professor, Electrical Engineering Department,


The Punjab College of Engineering And Technology, Lahore.

9
1950-52 Design and installation of 400 TR capacity airconditioning plant for
the Pakistan Security Printing Corporation, Malir, Karachi.

1954-55 The Lightfoot Refrigeration Co. Ltd., Wembley, U.K.


Design and installation of cold storage, process refrigeration and
airconditioning plants, sizes upto 500 TR (ton refrigeration).

1955-56 Society Gregg D'Europe, Lot, Bruxelles, Belgium. Technical Adviser


(AC&R) supervising cold storage, refrigeration and airconditioning
applications for Transport both rail and road.

1957-58 (a) Worthington Corporation, Harrison N.J., U.S.A.


HVACR Equipment manufacturer.

(b) The Standard Refrigeration Co. Inc. San Juan, Puerto Rico 350 TR
capacity high velocity induction system airconditioning installation
of Hotel La Concha, San Juan.

1956-62 Jaleel Brothers Ltd., Karachi.

Chief Engineer, numerous cold storage and airconditioning


projects, design and installation. Some of the notable jobs, State
Bank of Pakistan, Head Office Building, Karachi (740 TR) Penicillin
Factory PIDC, Daudkhel (200 TR), 950 seat Godeon Cinema (110
TR), Montgomery Cold Storage, Montgomery (Storage capacity
1000 tons fresh products).

1962-todate Practicing as a Consulting Engineer Principal of A.Saadat & Co.

10
Engr.ANWAR SAADAT is a registered Professional Engineer and Principal of A.Saadat
& Co., Consulting Engineers. He has been practicing as a Consulting Engineer for
Airconditioning, Ventilation, Refrigeration, Mechanical, Plumbing and Electrical
Services for Commercial, Industrial and Institutional Buildings since 1962. He has
been associated as a Consulting Engineer with a great majority of notable Projects
executed in the country. These include Pakistan Secretariat Buildings and National
Assembly Building, Islamabad, Wapda House,Lahore, various Buildings of National
Bank of Pakistan, various Buildings of State Life Insurance Corporation, various
Broadcasting Studios and Transmitter Stations of Pakistan Broadcasting Corporation,
Television Centres at Karachi and Lahore, Lahore Hilton Hotel, Avari Towers Hotel,
Karachi, Serena Hotels at Faisalabad and Quetta, Pearl Continental Hotels at
Karachi, Lahore & Rawalpindi, Production Facilities of many Multinational
Pharmaceutical Companies, Khyber Teaching Hospital Peshawar and many Buildings
of The Aga Khan University Campus, Karachi since 1976.

He had previously worked as Chief Engineer of Jaleel Brothers Ltd., Karachi, a


HVACR Contractors.
Earlier he had worked with The Lightfoot Refrigeration Co. Ltd., London, UK, Society
Gregg D'Europe, Bruxelles, Belgium, Worthington Corporation, Harison, NJ, USA and
The Standard Refrigeration Co. Inc, San Juan, Puerto Rico.
He played a key role in the formation of the Pakistan HVACR Society in 1996. In
recognition of services rendered by him to HVACR Engineering in the country since
1950, he was elected as Founder President of Pakistan HVACR Society in 1996 and
reelected in 1999.
Being Principal of one of pioneer Consulting Engineering firm in the Country, he was
elected Vice President of the Association of Consulting Engineers, Pakistan for the
terms 1990-92, 1995-97, 1997-99 & 2001-03.
He is a Fellow of Institution of Engineers, Pakistan, Fellow of The Institute of
Refrigeration, UK, and Life Member of American Society of Heating, Refrigerating &
Airconditioning Engineers, USA.
He is B.Sc. Honours (Engineering) and Gold Medalist from The Punjab College of
Engineering & Technology, Lahore (now designated The University of Engineering &
Technology), B.Sc. from Government College, Lahore (now designated Government
College University), and an Associate of The National College of Heating, Ventilating,
Refrigeration and Fan Engineering, London, UK (now designated Institute of
Environmental Engineering, South Bank University), for which he had submitted a
thesis titled "Transfer of Heat and Moisture".

11
Engr. FAROOQ AHMAD

Technical Director of the Company.

He has a wide ranging professional career of over 32 years, having obtained his
Engineering Degree in 1977 from The Punjab University, Lahore. He is a registered
Professional Engineer with Pakistan Engineering Council.

He joined A.Saadat & Co. in 1988 and has been responsible for designing of
HVACR, Mechanical & Plumbing Systems, preparation of working drawings,
specifications, BOQ and tender documents, and top supervision of the work of the
Contractors.

He has been associated with a number of notable Projects including 300 Room
Extension of Pearl Continental Hotel, Lahore, new Campus of Lahore University of
Management Sciences, Lahore, Production and other facilities of multi national
Pharmaceutical Companies such as GlaxoSmithKline Pakistan Ltd., Aventis Pakistan
Ltd. & Barrett Hodgson Pakistan Ltd., multi storey office buildings and industrial
units. His responsibilities include coordination with Owners, Architects and other
Consultants for the Project and supervision of the work of Engineers &
Draughtsmen of his Group.

1. Educational Qualifications:

1971 B.Sc. from Government College Lahore.

1975 B.Sc. (Engineering) in Chemical Engineering from The Institute Of


Chemical Engineering & Technology,University Of Punjab, Lahore.
Secured Second Position in the University.

Merit Scholarships

1967-69 High School Performance Scholarship.

1969-72 Pakistan Railway Sponsorship.

1972-75 Punjab University Talent Scholarship.

2. Professional Affiliations:

Registered as a Professional Engineer with Pakistan Engineering


Council.

3. Professional Experience since 1976:

12
1976 Interim Assignment as a Lecturer for six months with The
University Of The Punjab, Lahore.

1977-78 Post-Graduate Practical Training with Dawood Hercules Chemicals


Ltd., Lahore, for fifteen months. Plant Capacity was 1100 Tons
of Urea per Day.

1978-80 Worked as Efficiency Engineer with The Electricity Corporation,


Tripoli, Libya for their West Tripoli Power Station. This is one of
the major Power Stations in North Africa with a Generating Capa-
city of 5x65 MW electric power and included a Captive Seawater
Desalination Plant of 2x11250 Cu.m per Day Capacity.

1980-88 Was employed by Saline Water Conversion Corporation,


Jeddah,Saudi Arabia as Efficiency Engineer for Desalination Plant
and Power House, Jeddah, Phase-III. This Plant had a Generating
Capacity of 4x62 MW electric power and 4x22000 Cu.m per Day
Of Sweet Water production from Red Sea.

1988-todate A.Saadat & Co., Consulting Engineers.

13
Engr. HAFIZ YASIR KHAN

1. Educational Qualifications:

2012 B.E. in Mechanical Engineering from NED University of


Engineering & Technology, Karachi.

Computer Skill:

Professional Courses: Two months professional training on


AutoCAD.

Other Courses: MS Office including MSWord, MS Excel, MS


Power Point.

2. Professional Affiliations:

Registered as a Registered Engineer with Pakistan Engineering


Council, Registration No. MECH-27869.

3. Professional Experience:

2012(1 Year) National Technologies Inc, as Project Engineer.

2013, todate A.Saadat & Co., Consulting Engineers, as Design Engineer.

14
Engr. MUHAMMAD ZAMAN

1. Educational Qualifications:

2012 B.Tech. in Mechanical Engineering from Pimsat University of


Engineering & Technology, Karachi.

Computer Skill:

Professional Courses: Two months professional training on


AutoCAD.

Other Courses: MS Office including MSWord, MS Excel, MS


Power Point.

2. Professional Experience:

2012(2 Years) Y.H. Associates, Consulting Engineers, as Project Engineer.

2013, todate A.Saadat & Co., Consulting Engineers, as Senior Project


Engineer.

15
Engr. HAMID HUSSAIN

1. Educational Qualifications:

2010 B. Tech. (Hons) in Mechanical Engineering from Newport Institute


Of Communications & Economics Karachi.

Computer Skill:

Professional Courses: Two months professional training on


AutoCAD.

Other Courses: MS Office including MSWord, MS Excel, MS


Power Point.

2. Professional Affiliations:

The life member of Pakistan HVACRSociety jointly organized by Ashrae


Pakistan Chapter.

3. Professional Experience:

2010 (1 Years) Y.H. Associates, Consulting Engineers, as a Design Engineer.

2011 (2 Years) Saudi Oger Ltd. (Saudia Arabia) as a Project Engineer.

2013, todate A. Saadat & Co., Consulting Engineers, as Senior Project


Engineer.

16
Engr. SALEEM AHMED

1. Educational Qualifications:

1984 Diploma of Associate Engineer from Sindh Board of Technical


Education (Medal of Excellence) in Refrigeration & Air Conditioning.

1990 Bachelor of Technology in MECHANICAL from NED University of


Engineering & Technology, Karachi.

Computer Skill:

Professional Courses: Two months professional training on


AutoCAD.
MS Office including MSWord, MS Excel, MS
Power Point.

2. Technical Courses From :


Cooling & Heating Loads Calculation
HVAC System Design , Air & Water Side Design

3. Technical Trainings:

4. Professional Affiliations:
Member of HVACR Society – Pakistan.

5. Professional Experience:

1984 to todate 32 Years in Air conditioning System Design, Erection, monitoring,


& commissioning of AC plants.

Major Projects Executed :


- Complete Design , execution & commissioning of of AC system of HIMS
building at Bun Murad Hamdard University Karachi
- Execution , monitoring & commissioning of 1400 TR Direct Fired Absorption
system for NICL Building Karachi.
- Technical advisory services to Gardez Hospital Afganistan.
- Complete Design , Execution & commissioning of of AC system of 600 TR
Capacity at UCH Power-II Project ( 11 Buildings) including Smoke Control
System – Dera Murad Jamali Baluchistan.

2017, todate A.Saadat & Co., Consulting Engineers, as General Manager.

17
Engr. MAAZ AHMED RAZA

1. Educational Qualifications:

2006 B.E. in Mechanical Engineering from National University of Science


& Technology.

Computer Skill:

Professional Courses: Two months professional training on


AutoCAD.

Other Courses: MS Office.

2. Professional Affiliations:

Registered as a Registered Engineer with Pakistan Engineering


Council, Registration No. MEC.

3. Professional Experience:

Apr-12-Aug-13 Trainee Engineer at Tapal Energy (Pvt.) Ltd.


Nov-13-July-14 Project Engineer at M.G Engineering Associates.

November 2017 to date A.Saadat & Co., Consulting Engineers, as Design


Engineer.

18
Engr. TALHA JAWAID

1. Educational Qualifications:

2017 B.E Mechanical Engineering from NED University of Engineering &


Technology.

Computer Skill:

Professional Courses: Two months professional training on


AutoCAD.

Other Courses: AutoCAD, HAP Software, Ansys, MS Office

2. Professional Affiliations:

Registered as a Registered Engineer with Pakistan Engineering


Council, Registration No. MECH-38597.

3. Professional Experience:

2018, todate A.Saadat & Co., Consulting Engineers, as Assistant Design


Engineer.

19
LIST OF NOTABLE PROJECTS

executed by
A.SAADAT & CO.
Consulting Engineers

- Pharmaceutical Production Units


- Multi-Storey Office & Other Purposes Buildings
- Government Buildings And Embassies
- Banks And Insurance Companies
- Hotels
- Television, Radio, Auditoriums And Cinemas
- Hospitals, Laboratories And Special Applications
- Computer Centres
- Industrial Complexes
- Cotton & Synthetic Fibre Spinning & Weaving Units

20
PHARMACEUTICAL PRODUCTION UNITS

PROJECTS FROM 1968 to 2000

1. Sandoz Pakistan Ltd.:

(a) New Pharmaceutical Factory, Jamshoro. 230TR absorption type central


plant with different systems for individual production areas and laboratories.

(b) Jamshoro Factory Pharma Production Extension - Airconditioning.

(c) Syrup Production Building, Jamshoro - Process Piping.

(d) Laboratory, Bahria Complex, Karachi - Plumbing.

(e) Warehouse Expansion,Jamshoro Factory - Airconditioning.

(f) Scientific Centre, Korangi, Karachi - Airconditioning.

2. Ciba-Geigy Pakistan Ltd.: (now Noavrtis Pharma Pakistan Ltd.)

(a) Pharmaceutical Factory, Karachi. 110 TR central plant with different


systems for individual production areas and Laboratory.

(b) Multi Divisional Warehouse,Ciba House, Karachi Electrical &


Airconditioning.

(c) New Pharma Liquid & Ointment Section, Ciba House, Karachi -
Airconditioning & Electrical.
(d) Administration Block, Ciba House, Karachi - Airconditioning & Electrical
Works.

(e) Emergency Generator installation for Pharma Production, Ciba House,


Karachi.

(f) Pharma Production Facility Renovation Project - Airconditioning,


Mechanical & Electrical.

3. Abbott Laboratory (Pak) Ltd.:

(a) Pharmaceutical Factory, New Production Areas, Karachi.


Airconditioning, mechanical and plumbing systems.

Extension-I, 230TR capacity reciprocating compressor type central


plant.

Extension-II, 400 TR capacity absorption type central plant with


different systems for individual production areas and Laboratory.

(b) New Tablet Department, Pharma Production, Airconditioning &


Ventilation Systems.
21
(c) New Liquid Manufacturing Deptt. - Airconditioning.

(d) Factory Canteen - Ventilation & Exhaust Air System.

(e) New Personnel Facilities Building - Plumbing.

(f) New Injectable Department - Airconditioning And Mechanical.

(g) Administration Block - Airconditioning.

(h) Renovation & Upgrading Of Pharma Production Facility - Aircondi-


tioning & Mechanical Systems.

(i) Upgrading Of Airconditioning Systems of Pharma Low RH Areas.


Karachi.

4. Wyeth Laboratories (Pak) Ltd.: (Now Pfizer Pakistan Ltd.)

(a) New Pharma Production Building, Lahore Factory. Airconditioning and


mechanical systems. 420TR capacity centrifugal compressor type central
plant with different systems for individual production areas and Laboratory.

(b) Old Pharma Production Block, Airconditioning Systems - Modifications


and Upgrading.

5. Wellcome Pakistan Ltd./GlaxoWellcome Pakistan Ltd/GSK:

(a) New Pharmaceutical Factory, F/268, SITE, Karachi. Airconditioning


and mechanical systems. 370TR capacity absorption type central plant with
different systems for individual production areas.

(b) New Office Block, F/268, SITE, Karachi - Airconditioning.

(c) TMP Expansion Project, F/268, SITE, Karachi - Airconditioning & Fire
Fighting System.

(d) Extension Of Warehouse And Offices, F/268, SITE - Airconditioning.

(e) Installation of 2nd 370TR absorption type chiller for enhancement of


central plant capacity, F/268, SITE, Karachi.

(f) Aleem House (New Warehouse & Offices), Islamabad - Airconditioning.

(g) New Warehouse & Offices, Lahore - Airconditioning.

(h) Refurbishment of Pharma Production Facility, D/43,SITE, Karachi -


Airconditioning & Mechanical Systems.

(i) New Warehouse & Offices, Sukkur - Airconditioning.

22
(j) Proposed Sterile Production Facility at F/268, SITE, Karachi. The
design, working drawings, specifications & BOQ for airconditioning,
ventilation and mechanical systems and process piping were completed.
(k) (i) New Tablet Building, SITE.
(ii) West Wharf Renovation Project.

6. Squibb Pakistan Ltd.: (Now GSK Pakistan Ltd.)

(a) New Pharmaceutical Factory,Karachi. Airconditioning, mechanical and


plumbing systems. 350 TR capacity reciprocating compressor type central
plant with different systems for individual production areas and warehouse.

(b) Pharma Factory, Karachi, Extension, Sterile Testing Area -


Airconditioning.

(c) Sterile Production Area - Airconditioning System Upgrading.

7. Hoechst Pakistan Ltd.: (Now Sanofi- Aventis Pakistan Ltd.)

(a) Pharmaceutical Factory, Korangi, Karachi Expansion of Production


Areas. Airconditioning and mechanical systems. 450 TR capacity absorption
type central plant with different systems for individual production areas.

(b) Administration Building,Korangi Factory - Airconditioning & Electrical


Works.

(c) Pesticide Formulation Plant, Korangi Factory - Electrical Work.

(d) ATA Laboratory, Korangi Factory - Electrical Work.

(e) Central Store Extension, Korangi Factory, - Electrical Works.

(f) TH Plant Korangi Factory - Electrical/Evaporative Water Cooling


Systems.

(g) Korangi Factory Ampule Filling Room Renovation - Airconditioning.

(h) Korangi Factory Substation Expansion-Electrical Works.

(i) Korangi Factory - Cooling Tower For Industrial Plant Cooling Water
System.

(j) Haemaccel Plant,Korangi Factory - Airconditioning, Mechanical &


Electrical.

(k) Administration Building Extension, Korangi Factory - Airconditioning.

(l) Central Store Units 1, 2 & 3 - Electrical.

(m) AgrEvo Projects, Korangi Factory - Airconditioning.

23
8. Knoll Pharmaceuticals Ltd.formerly Boots Co.(Now Abbott Laboratory (Pak) Ltd )

(a) Pharmaceutical Factory,New Production Buildings,Korangi Karachi.


Airconditioning, mechanical and plumbing systems. 370 TR capacity
reciprocating compressor type central plant with different systems for
individual production areas.
(b) Korangi Factory Pharma Production Facility Extension Phases 1 & 2 -
Airconditioning, Mechanical & Plumbing.

(c) New Q.C.Facilities, Korangi Factory - Airconditioning.

(d) Korangi Factory, Farley Manufacturing Facility - Airconditioning &


Plumbing.

9. Searle Pakistan (Pvt) Ltd.:

(a) New Pharmaceutical Factory,SITE, Karachi. Airconditioning,mechanical


and plumbing systems. 200TR capacity reciprocating compressors type
central plant with different systems for individual production areas.

(b) Karachi Factory Warehouse & Liquid Manufacturing Expansion -


Airconditioning & Plumbing.

(c) Karachi Factory Production Facility Expansion and Upgrading -


Airconditioning & Mechanical.

10. Gelcap (Pakistan) Ltd., Capsule Manufacturing Plant, HITE - Airconditioning.

11. S.J.&G.Fazal Ellahie Ltd., Pharmaceutical Factory,Extention, Karachi -


Airconditioning.

12. May & Baker (Rhone Poulenc Rorer Pakistan (Pvt) Ltd.)
(Now Sanofi- Aventis Pakistan Ltd.)

New Pharma Production Block,Wah Cantt Factory - Airconditioning, Mech-


anical And Plumbing Works.

13. Eli Lilly Gohar Pharma Products Factory, SITE, Karachi - Airconditioning,
Mechanical, Plumbing & Electrical.

14. Bayer Pakistan (Pvt) Ltd.:

(a) Q.C.Laboratory, Karachi - Airconditioning.

(b) New Pharma Production Facility, SITE, Karachi - Airconditioning,


Mechanical, Plumbing & Electrical.

(c) New Solid Dose/Cream Production Facility - Airconditioning,


Mechanical, Plumbing & Electrical.

15. Ali Gohar Pharmaceuticals (Pvt) Ltd., Pharma Production Factory, SITE,
24
Karachi - Airconditioning, Mechanical & Plumbing.

16. Merck Sharp & Dohme Of Pakistan Ltd., Pharma Factory, SITE, Karachi -
Airconditioning & Mechanical Systems for:

(a) Production Facility Expansion Phases 1 & 2.

(b) New Liquid Deptt.

17. Leonine Pharmaceutical Products Factory, Lahore - Airconditioning.

18. Saitex Pharmaceutical Factory, Karachi - Airconditioning

19. Parke Davis Pharmaceutical Factory(Now Pfizer Pakistan Ltd.), Karachi


Renovation Of Airconditioning & Ventilation Systems.

20. Brooks Pharmaceutical Laboratories, Karachi Factory - Airconditioning System


Renovation.

21. Century Pharmaceutical Factory, Karachi - Airconditioning, Mechanical & Plumbing


Systems.

22. Atco Laboratories Sterile Production And Packaging Area,


Karachi Factory - Airconditioning.

23. Pacific Pharma Factory, Lahore - Airconditioning.

24. Efroze Chemical Industries (Pvt) Ltd. ORS Area, Karachi Factory- Airconditioning.

25. Pharmagen Beximco Ltd, New Pharma Factory, Lahore - Airconditioning.

26. Bosch Pharmaceuticals (Pvt) Ltd., Pharma Production Factory,


Karachi - Airconditioning.

27. Organon Karachi Factory Sterile Area & Microbiological Laboratory -


Airconditioning.

28. Spencer Pharma (formerly Fisons), Karachi Factory:

(a) Main Production Facility-Airconditioning & Mechanical.

(b) New Injectable Deptt. - Airconditioning.

29. Pharmatec Pakistan (Pvt) Ltd., (formerly Sterling Products), Pharma Factory,
Karachi - Upgrading of Airconditioning System.

30. Smith Kline-Beecham Of Pakistan Ltd. (Now GSK Pakistan Ltd.):

(a) Landhi Factory, Augmentin Facility and New Tablet manufacturing unit
- Airconditioning.

25
(b) SITE Factory, Upgrading of Airconditioning System.

31. Ferozsons Laboratories Ltd., Nowshera Factory - New Tablet Manufacturing


Block - Airconditioning.
32. Barrett Hodgson Pakistan (Pvt) Ltd,

Airconditioning and Mechanical Services.

Phase-I:

(a) New Production Facility

(b) Penicillin Production Facility

(c) Veterinary Protection Facility.

Phase-II:

Cephalosporine Production Facility.

33. Remington Pharmaceutical Industries (Pvt Ltd.

Airconditioning and Mechanical Services for New factory at Multan Road


Lahore.

PROJECTS FROM 2000 to 2010

34. Abbott Laboratory (Pak) Ltd.:

(a) HVAC, Mechanical and Plumbing systems for Effervesce Tablet and
Ointment Production Areas. At Landhi Factory Area.

(b) HVAC, Mechanical and Plumbing systems Dispensing Areas at Landhi &
Korangi Factories, including Airconditioning of existing warehouses.

(c) HVAC, Mechanical and Plumbing systems for extension & up-grading
of Liquids Area Production Area. At Korangi Factory. Including
extension of Central Plant Equipment.(cGMP Project).

35. Ali Gohar Pharmaceuticals (Pvt) Ltd.:

(a) HVAC, Mechanical and Plumbing systems for New Sterile Facility.

(b) HVAC & Mechanical Systems for Renovation of Solids and Liquid
production Areas. Including Extension of Central Plant by 250 TR
Direct Fired water chiller.

(c) Replacement of exiting HVAC equipment for Pharma Production Areas.

26
36. Bayer Pakistan Ltd.:

HVAC Systems for Micro Laboratory.

37. Bayer Crop Sciences Pakistan Ltd.:

Extension of Central Plant & HVAC System for office Areas.

38. Bf- Bio Sciences Pakistan Ltd. (Ferozsons) Near Riawind

(a) HVAC, Mechanical & Plumbing Systems for New factory at Sunder Road,
Lahore.

(b) Airconditioning, Mechanical & Plumbing Systems for New Head office
Building at Sunder Road, Lahore.

39. Barrett Hodgson Pakistan (Pvt) Ltd,

(a) Extension of Central Plant, addition of 200TR Direct Fired Absorption


water chiller and ancillary works.

(b) HVAC for New Pharma Packing at Second Floor.

40. Consolidated Chemical Laboratories (Pvt) Ltd. (CCL) Lahore

HVAC Systems for New Product Manufacturing Area.

41. CCL Pharmaceutical (Pvt.) Ltd., Lahore.

HVAC Systems for New Dry Power Area at Kot-lakh-pat Factory.

42. CSH Pharmaceutical (Pvt.) Ltd., Lahore.

HVAC, Mechanical & Plumbing Systems for New Factory at Ferozpur Road.

43. Eli Lilly Gohar Pharma Products Factory, SITE, Karachi .

(a) Up-grading of Central Plant and Up-grading of HVAC system for


Production facility.

(b) Replacement of Existing AHUs and Dehmidifiers for HVAC system of


Production Facility.

44. GSK Pakistan Ltd.

SITE, F-268 Factory.(formerly Wellcome)

(a) Up-grading & Renovation of HVAC & Mechanical Systems for Liquids
Production Areas.

(b) HVAC & Mechanical Systems for Blister Packing Areas.


27
(c) Airconditioning systems for Raw Material storage area.

(d) HVAC & Mechanical Systems for New Penicillin Block.

(e) Up-grading and Extension of Central Plant for Liquids Block.


(addition of 450 TR direct Fired Dual fuel water chiller
and ancillary work)

(f) HVAC & Mechanical Systems for Bottle Packing area.

(g) HVAC & Mechanical Systems for Additional Primary and


secondary Packing Areas in tablet Block.

West Wharf Factory.

(a) Up-grading & Renovation of HVAC & Mechanical Systems for


Sterile Areas.

(b) Relocation and Extension of Central Plant for West Wharf


Production facility. (350 TR x 2 DGF water chillers and ancillary
equipment)
(c) Extension of Central Plant for West Wharf Production facility.
(addition of 350 TR, DGF water chillers and ancillary equipment)

Korangi Factory.(formerly Bristol Mayer Squibb)

(a) HVAC, Mechanical & Plumbing Systems for Extension of Lactam


Production facility.

(b) Extension and Relacation of Central Plant for Production facility.


(450x 2 TR, DF dual fuel water chillers and ancillary equipment)

45. Herbion Pakistan Ltd.

A. Karachi Factory.

(a) Phase-I, Up-grading of HVAC and Mechanical systems for production


facility at ground floor.

(b) Phase-II, Up-grading of HVAC and Mechanical systems for production


facility at First & Second floors.

B. Lahore Factory.

HVAC, Mechanical and Plumbing systems for new production


facility at Sunder Industrial Area Lahore.

46. Hilton Pharma (Pvt) Ltd. Korangi , Karachi

HVAC, Mechanical and Plumbing systems for new production facility.


28
47. Hodgson Pharma (Pvt) Ltd. Port Qasim , Karachi

HVAC, Mechanical and Plumbing systems for new production facility at Port
Qasim Industrial Area Karachi.

48. Kaizen Pharma (Pvt) Ltd. Port Qasim , Karachi

HVAC, Mechanical and Plumbing systems for new production facility at Port
Qasim Industrial Area Karachi

49. Nexter Pharma (Pvt) Ltd. Port Qasim, Karachi

HVAC, Mechanical and Plumbing systems for new production facility at Port
Qasim Industrial Area Karachi.

50. Novartis Pharma Pakisan Ltd.

A. Karachi Factory.

(a) Air-conditioning of existing raw material and finished goods


warehouses.
B. Jamshoro Factory.

(a) Up-Grading of HVAC & Mechanical systems for Dispensing Areas


and production facility.

(b) Air-conditioning of New finished goods warehouse.

(c) HVAC, Mechanical and Plumbing systems for New Solids Block.

51. Platinum Pharma Pakisan Ltd. Port Qasim, Karachi:

(a) HVAC, Mechanical and Plumbing systems for New


Cephalosporin Block.

(b) Up-grading HVAC, Mechanical and Plumbing systems for


Liquids and Solids systems and Extension of Central Plant
Equipment by addition of 320RT Gas Fired Water chiller and
ancillary equipment.

52. Pharmatec Pakistan (Pvt) Ltd.:

Extension of Central Plant Equipment by additional Direct fired


Water chiller and ancillary equipment and Airconditiong of New
Warehouse.

53. Sami Pharma Pakistan Ltd. SITE Karachi:

(a) HVAC, Mechanical and Plumbing systems for New Bio Pharma
Block.
29
(b) HVAC, Mechanical and Plumbing systems for New Pharma
Production Block.

(c) New Central Plant for New Bio and Parma Production Blocks.

54. Sanofi-Aventis Pakistan Ltd.:

(a) HVAC, Plumbing and Mechanical Services for Renovation & Up


grading of Sterile Production Area.

(b) HVAC, Plumbing and Mechanical Services for Renovation & Up


grading of Solids Production Area.

(c) HVAC, Plumbing and Mechanical Services for New Building of


Clafron (Cephalosporin) Production facility.

(d) HVAC, Plumbing and Mechanical Services for Renovation & Up


grading of Haemaccel Production Area.

(e) HVAC, Plumbing and Mechanical Services for Renovation & Up


grading of Haemaccel Production Area.

(f) Up-Grading and Extension-1 of Central Plant. (Addition of 400


TR Water Steam operated water Chiller.

(g) Up-Grading and Extension-2 of Central Plant. (Addition of 450


TR Water Direct Gas operated water Chiller.

(h) HVAC, Plumbing and Mechanical Services for Extension of


Haemaccel Plant.

(i) Fire Fighting Sprinkler system for Existing Raw Materials and
Finished Goods warehouse.

(j) HVAC, Plumbing and Mechanical Services for Renovation & Up


grading of Solids Primary & Secondary Packing Production Area. (Job
in hand)

55. Wyeth Laboratories (Pak) Ltd (Now Pfizer Pakistan Ltd.)

Up-grading of Central Plant and HVAC Systems for Liquids Area.

30
INDUSTRIAL COMPLEXES

1. Pakistan (PIDC) Machine Tool Factory, Landhi, Karachi. Airconditioning of


Special Production Shops and Administration Block, reciprocating compressor
type central chilled water plant with fan-coil units and airhandling units.

2. Security Paper Mill, Karachi, Airconditioning, Ventilation and Humidification


of special bank note paper manufacturing factory, 250 TR centrifugal
compressor type water chilling plant with airhandling units for airconditioning
and air washers for humidification system.

3. Pakistan Tobacco Company Ltd.:

(i) Akora Khattak Factory Complex.

(a) Evaporative cooling systems for PMD extension,CPD, CST, CMD


extensions Phases 1 & 2,Tobacco Store and Administration Block.

(b) Airconditioning Systems for CMD, Printing Department & Filter Rod
Section.

(c) Dust Extraction System for GLT-87.

(ii) Jhelum Factory Complex.

(a) Evaporative cooling systems for CMD and Printing Department.

(b) Airconditioning Systems for CMD & CPD Sections, Loga Max Enclosures
Phase-1 & 2.

(iii) Airconditioning of Offices at Karachi & Islamabad.

(iv) Tobacco Storage Warehouse, EPZ, Karachi - Ventilation System.

4. Pakistan Cables Ltd. Factory, SITE, Karachi:

(a) Laboratory and Office Block - Airconditioning.

(b) New Upcast Plant, Evaporative cooling and mechanical refrigeration


water cooling systems for process cooling.

(c) Aluminium Anodising Plant, upgrading of chilled water system for


process cooling.

5. Allawala Brothers Ltd., Dry Battery Cell Manufacturing Factory, Karachi,


Airconditioning of production area and laboratory.

6. National Beverages Ltd., Karachi. Water chilling system for bottled soft drink
31
(7 up, etc,) manufacturing.

7. Pakistan Oxygen Ltd., West Wharf Complex, Karachi,


Office Block - Airconditioning.

8. Continental Biscuits Ltd., Biscuits Factory at Sukkur-Airconditioning of Production


Areas & Offices and subsequent Production Areas Extension Nos.1 & 2.

9. Berger Paints Ltd., Karachi Factory.

(a) Laboratory - Airconditioning.

(b) Paint Manufacturing Facility - Ventilation & Exhaust Air Systems.

10. Adamjee Polycrafts Ltd. Factory, HITE-Chilled Water Systems for Process
cooling.

11. ICI Pakistan Ltd.:

(i) Lahore Paints Factory.

(a) Kansai Paint Plant, Airconditioning, Cold Storage & Dust Extraction
Systems.

(b) Paint Manufacturing Area. Upgrading of Dust Extraction & Collection


and ventilation systems.

(ii) Karachi Factory, Vapour Extract Systems.

(iii) Soda Ash Manufacturing Complex, Khewra.

(a) Turbo Generator Hall upgrading of evaporative cooling system.

(b) Kiln Area Dust Extraction & Recovery Systems Phase 1&2.

12. Crescent Greenwood Ltd.,Garment Stitching Unit, Sheikhupura, Air-conditioning.

32
COTTON & SYNTHETIC FIBRE SPINNING & WEAVING UNITS

(Note: Mostly Humidification Cum Evaporative Cooling Systems are


installed. Airconditioning System where installed is identified)

1. Thal Jute Mill, Muzaffargarh.

2. Island Textile Mill, Kotri.

3. Apollo Textile Mill, Muzaffargarh.

4. Monnoo Group.

(a) Margalla Textile Mill, Hasan Abdal.

(b) Rawal Textile Mill, Distt. Sheikhupura.

(c) Olympia Blanded Fibre Mill Nos.1&2, Distt. Sheikhupura.

(d) Qureshi Textile Mill, Mian Channu.

(e) Monnoo Textile Mill, Distt. Lahore.

(f) Lahore Spinning Mills, Chunian.

5. Kohinoor Group.

(a) Kohinoor Spinning Mill, Chak Bazaid.

(b) Chakwal Textile Mill, Chakwal.

6. Nagina Cotton Mill, Kotri.

7. Consolidated Textile Mill, Larkana.

8. Sapphire Fibre Mill, Distt. Sheikhupura.

9. Gulshan Spinning Mill, Distt. Multan.

10. Ibrahim Textile Mill, Shahkot.

11. Sohail Textile Mill, Distt. Sheikhupura.

12. Jamia Textile Mill, Karachi.

13. Dost Mohammad Cotton Mill, Karachi.

14. Dawood Group, Dawood Cotton Mills, Landhi, Karachi.

(a) Spinning Unit IV.


33
(b) Spinning Unit V.

(c) Spinning Unit VI.

15. Indus Textile Mill Nos.1, 2 & 3, Hyderabad.

16. Modern Textile Mill, Hyderabad.

17. Norrie Textile Mill, Norriabad.

18. Shahdadkot Textile Mill Spinning Section, Shahdadkot.

19. Mahmood Textile Mills, Muzaffargarh.

(a) New Unit 2.

(b) Renovation of Unit 1.

20. Shahpur Textile Mill, Chunian.

21. Deewan Group.

(a) Dewan Textile Mill, Kotri.

(b) Khalid Textile Mill, Kotri.

22. Premium Textile Mill, Nooriabad, New Finishing Deptt.

23. Premier Tobacco Industries Ltd., Mandra Factory.

24. Ajax Industries Ltd. Korangi Mills, Open End Spinning

Department - Airconditioning.

25. S.G.Fibres Ltd., Synthetic Fibres, Mill Expansion Unit

Nos. 2, 3 & 4 - Airconditioning.

34
HOSPITALS, LABORATORIES AND SPECIAL APPLICATIONS

1. Central Telegraph House, Islamabad. Year-round airconditioning, absorption


type central water chilling plant with low velocity air distribution system.
2. Pakistan Space & Upper Atmosphere Research Commission.
(a) Research & Instrumentation Laboratory, SUPARCO Plant, Karachi
including Extensions 1 & 2 - Airconditioning.
(b) Geomagnetic Hut, Sparcent, Karachi - Airconditioning.
(c) Communication Lab. Facilities (GRS), Islamabad - Airconditioning.
(d) Aerospace Institute Building, Islamabad - Airconditioning.
3. Pakistan Telegraph & Telephone Department.
(a) Airconditioning Systems for four telephone exchanges.
(b) Satellite Earth Station, Deh Mandro,Karachi.Year-round
airconditioning, 100 TR plant.
4. Khyber Teaching Hospital, Peshawar Phase 1 & 2. Year-round
airconditioning, winter heating and ventilation systems, 350 & 1050 TR
absorption type central plants.
5. Businessman Trust Hospital, Lahore. Airconditioning, Ventilation &
Evaporative
cooling systems.
6. The Aga Khan University Medical Centre, Karachi - Airconditioning,
Mechanical & Plumbing Systems.
(a) Main Buildings Construction, 4x870TR capacity airconditioning plant
commissioned in 1985.
(b) Since 1986, have been associated with different extension
programmes including School of Nursing Expansion and New Block for
Magnetic Resource Images (MRI) and Radiology.

7. Lady Dufferin Hospital, Karachi.


Airconditioning Of 1st Floor Operation Rooms, New Block.

8. Children's Hospital Quetta - Year round Aiconditioning.


9. Sindh Institute of Urology and Transplantation, New Dewan Farooq Medical
Complex - Airconditioning.
35
COMPUTER CENTRES

1. WAPDA, Main Computer Centre, Wapda House, Lahore - Airconditioning.


2. National Bank of Pakistan.
(a) Computer Centre, Head Office Building, Karachi - Airconditioning.
(b) Computer Centre, Main Branch Building, Lahore - Airconditioning.
(c) Zonal Office Building,Islamabad, Computer Centre - Airconditioning.
3. State Life Insurance Corporation Computer Centre, S.L. Building No.2,
Karachi – Airconditioning.
4. Muslim Commercial Bank Ltd., MCB Computer Centre, S.L. Building No.2,
Karachi - Airconditioning.
5. Computer Centre, Shell House, Karachi - Airconditioning.
6. Karachi Port Trust, Computer Centre, Head Office Building,
Karachi – Airconditioning & Electrical.
7. IBM Computer Centre, Avari Plaza, Karachi - Airconditioning.
8. Lever Brothers (Pakistan) Ltd., Computer Centre,Avari Plaza,
Karachi - Airconditioning.
9. Allied Bank of Pakistan Ltd., Computer Centre, Jubilee Insurance House,
Karachi - Airconditioning.

36
TELEVISION, RADIO, AUDITORIUMS AND CINEMAS

1. Television Centre,Karachi. Year-round airconditioning, 440TR absorption type


central water chilling plant with low velocity air distribution system and
special noise proof systems for the Studios.
2. Television Centre, Lahore. Year-round airconditioning, 330 TR absorption
type central plant with low velocity air distribution system and special noise
proof systems for the Studios.
3. TV Transmitter Station, Murree. Winter heating system.
4. TV Rebroadcasting Stations at Thano Bula Khan, Sukesar, and Cherat.
Packaged type air cooled airconditioning systems.
5. Central Film Laboratory, Television Centre, Karachi. Aircooled airconditioning
system.
6. Melody Cinema, Islamabad. Year-round airconditioning system, 120 TR
electric operated chilled water plant.
7. Auditorium, Cultural Centre, Municipal Corporation, Lyallpur. Electric
operated packaged type units.
8. Shabistan Cinema, Rawalpindi. Electric operated packaged airconditioners.
9. Auditorium, PIA Head Office Building, Karachi. Air cooled packaged
airconditioners.
10. Pakistan Broadcasting Corporation. Broadcasting Studios, Electric operated
special noise proof airconditioning systems for New Studios at Karachi,
Multan,Rawalpindi,Peshawar, Khyber, Khairpur, Faisalabad, Bahawalpur, Loralai,
Zhob and Muzaffarabad.
11. Pakistan Broadcasting Corporation. High Power Transmitter Stations,
Airconditioning systems for new Stations at Hyderabad, Multan, Quetta,
Rawalpindi, Muzaffarabad, Lawrencepur, Khuzdar, Lahore, Islamabad,
Rewat, Karachi, Peshawar and Skardu.
12. Pakistan Broadcasting Corporation. Airconditioning Systems for Staff Training
and Technical Training Schools, Islamabad.
13. PBC Village Broadcasting Station, Gilgit - Airconditioning.

37
HOTELS

1. Pakistan House, Islamabad. 250 Room Hotel, Capital Development


Authority. Year-Round airconditioning 360 TR absorption system with
fan-coil units in the guest rooms.
2. PIA Motels at Twelve different locations in East & West Pakistan.
Year round airconditioning, winter heating and ventilation systems.
3. Khyber Intercontinental Hotel, Peshawar. Year round airconditioning
system, 400 TR absorption type plant with air distribution systems
and fan-coil units.
4. New PIA Flight Kitchen,Karachi. Year-round airconditioning and
ventilation systems and cold storage room.
5. Motel Complex, Naran, Kaghan Valley,Pakistan Tourism Develop-l
ment Corporation. Winter heating system.
6. Avari Lahore Hotel (formerly Lahore Hilton). Airconditioning, mec-
hanical, plumbing and electrical systems. 900TR capacity central
airconditioning plant, 3000KVA capacity substation and 2000 KVA
full back up generator units.
7. Avari Towers Ramada Renaissance Hotel, Karachi. Airconditioning,
mechanical, plumbing and electrical systems. 750TR capacity
absorption type central airconditioning plant, 3500KVA capacity
substation and 2500KVA full back up generator units.
8. Hotel Midway House, Karachi Airport New Block. Airconditioning,
mechanical and plumbing systems. 405TR capacity reciprocating
compressor type central plant.
9. Serena Hotel, Quetta - Airconditioning, mechanical,plumbing and
electrical systems. 200 TR capacity reciprocating compressor type
central plant.
10. Serena Hotel, Faisalabad - Airconditioning, mechanical, plumbing
and electrical systems. 200TR capacity reciprocating compressor
type central plant.
11. Pearl Continental Hotel - Karachi.
Airconditioning and Mechanical Systems as part of Renovation works
of Main Lobby, Shopping Area, Meeting Rooms and Chandni Lounge.

38
12. Pearl Continental Hotel - Lahore .
New 289 Guest room block with 1000 person capacity Convention
Hall Meeting Rooms, four restaurants, BOH areas including Kitchens,
Laundry, etc. Airconditioning, mechanical, plumbing and electrical
systems. 1800TR capacity direct gas fired absorption type central
plant, 3800KW full back up generating sets.
13. Pearl Continental Hotel - Bhoorbun .
Airconditioning, mechanical, plumbing and electrical systems.
Packaged airconditioners, incremental type guest room
airconditioners, 1500KVA substation, 600KVA emergency supply
generator sets.

39
MAJOR PROJECTS UNDERTAKEN IN LAST 5 YEARS
S.No. Brief Description Remarks

1. Airconditioning, Mechanical System and


Ancillary Works For cGMP Upgrade Project, Completed in April 2012
Abbott Laboratories (Pak) Ltd., Korangi
Factory, Karachi.
2. HVAC & Mechanical Services for Production
Factory at CSH Pharmaceuticals Pvt. Ltd. Completed in May 2012
Lahore.
3. HVAC & Mechanical Systems for Phase
II At Herbion Pakistan (Pvt) Ltd., Korangi Completed in June 2012
Factory, Karachi.
4. Dehumidification of Sterile Area at
GlaxoSmithKline Pakistan Ltd., Korangi
Factory, Karachi. Completed August 2012
5. HVAC, Plumbing & Mechanical Works
For Lactam Building Extension at Completed in November 2012
Korangi Factory (Ex-BMS),
GlaxoSmithKline Pakistan Ltd., Karachi.
6. Upgrading of Tablet Coating Area for
Zantac Aqueous Coating Project at Completed in February 2013
GlaxoSmithKline Pakistan Ltd., Korangi
Industrial Area, Karachi.
7. Airconditioning Systems, Mechanical &
Ancillary Works for Phase-I, Pharma
Factory at Bin Qasim Industrial Area, Completed in February 2013
Kaizen Pharmaceuticals (Pvt.) Ltd., Karachi
8. Modifications of Existing Chilled &
Condenser Water Piping & Ancillary Work
for Central Plant Room at Novartis Pharma, Completed in July 2013
Jamshoro Factory.
9. Airconditioning, Mechanical and Ancillary
Works for New Solids Block at Novartis Completed in May 2013
Pharma (Pakistan) Ltd., Jamshoro.
10. Airconditioning System and Ancillary
Works for Effervescent Area Expansion Completed in May 2013
Project at Abbott Laboratories Pakistan
Ltd., Shahrae Pakistan, Karachi.
11. Airconditiong, Mechanical & Ancillary
Works at Sanofi Aventis Pakistan Ltd.,
Korangi Indutrial Area, Karachi.
Miscellaneous Projects. Completed in July 2013
i) Wet Granulation Suite Upgradation
ii) Sterile Area Renovation
iii) FG Warehouse 56 Tons Capacity
iv) Fire Fighting Works

40
12. Energy Conservation and Carbon Dioxide
Emission Control by Use of High
COP/Efficiency and Environment friendly Completed in December 2013
Equipment etc. at Landhi factory Phase-I,
Abbott Laboratories (Pak) Ltd., Karachi.i

13. HVAC Work at Route2 Health (Pvt.) Ltd.,


99, CCA, DHA, Phase 4, Lahore Completed in April 2014
14. Mechanical & Plumbing/ Drainage for New
Consulate General of Turkey, Karachi, Completed in May 2014
Pakistan.
15. Chilled & Condenser Water Piping and
Ancillary Works for Airconditioning Central
Plant Extension at Barrett Hodgson Completed in May 2014
Pakistan (Pvt) Ltd., F-607, S.I.T.E.
Factory, Karachi.

16. Chilled & Condenser Water Systems and


Ancillary Works for 400 TR Direct Gas
Fired Dual Fuel Absorption Water Chiller Completed in October 2014
and Cooling Tower for Central Plant
Extension at Sanofi Aventis Pakistan Ltd.,
Korangi Industrial Area, Karachi.
17. HVAC & Mechanical Works,
GlaxoSmithKline Pakistan Ltd.,
Miscellaneous Projects, at SITE Area
Factory, Karachi.
1) Separation of Chemical & Micro Lab in Completed in December 2014
Penicillin & Tablet Block
2) Off Hour Airconditioning of Tablet Block
Areas
3 Supply & Installation of Steam
Generating Boiler
18. Dehumidification System in Solid
Manufacturing Areas and Replacement of
Existing Airhandling Units for Compression Completed in January 2015
& Granulation Areas at AGP (Pvt) Ltd.,
S.I.T.E., Karachi.
19. Airconditioning, Mechanical Systems and
Ancillary Works for HEPA-1 at Hilton Completed in February 2015
Pharma (Pvt.) Ltd., Korangi Industrial
Area, Karachi.
20. Expansion of Airconditioning Systems at
National Bank of Pakistan, Head Office Completed in April 2015
Building, Karachi.
21. Extension of 450 TR DGF Chiller in Central
Plant Rooms, HVAC System For Warehouse Completed in June 2015
At Pharmatech Pakistan (Pvt) Ltd.,
Karachi.

41
22. Airconditioning, Mechanical, Plumbing And
Ancillary Works Biotech & General Pharma
Building at SAMI Pharmaceuticals (Pvt.) Completed in July 2015
Ltd., F-145, S.I.T.E, Karachi.
23. Airconditioning System & Ancillary Work
for Raw Material Warehouse at Abbott
Laboratories (Pakistan) Ltd., Landhi Completed in July 2015
Factory, Karachi.
24. HVAC, Mechanical Systems & Ancillary
Works at Herbion Pakistan (Pvt) Ltd., Completed in August 2015
Sundar Industrial Estate-Lahore.
25. 200TR DGF Water Chiller, HVAC &
Mechanical Work For New Factory at
Hudson Pharma, Bin Qasim Industrial Completed in August 2015
Area, Karachi.
26. Proposed Pharma Facilities and Warehouse
for M/s. ATCO Laboratories (Pvt.) Ltd., Plot Completed in September 2015
No. B-18, S.I.T.E., Karachi
27. Supply & Installation of Additional Water
Chiller, Cooling Tower, Piping and Ancillary
Works for Penicillin Block at Completed in October 2015
GlaxoSmithKline Pakistan Ltd., F-268,
S.I.T.E. Factory.
28. Airconditioning System and Ancillary
Works for Liquids Extension at Abbott Completed on December 2015
Laboratories Pakistan Ltd., Korangi
Factory, Karachi.
29. Airconditioning Systems and Ancillary
Works for Liquid Warehouse at Sanofi Completed on February 2016
Aventis Pakistan Ltd.,.Korangi Industrial
Area, Karachi.
30. HVAC & Mechanical Works For Novartis
Pharma (Pakistan) Ltd., Jamshoro Factory,
Completed on June 2016
i) Up-Gradation of Qalsan Area
ii) Up-Gradation of Red (Coloured) Area
iii) Central Plant Room Extension
iv) Rerouting of Service Bridge Area
31. Airconditioning System for Proposed
Inhaler Facility at Getz Pharma (Pvt.) Ltd., Completed on June 2016
Korangi Industrial Area, Karachi.
32. HVAC Remediation for Tablet Block Phase
1 at Abbott Laboratories (Pakistan) Ltd., Completed on August 2016
Landhi, Karachi.
33. HVAC System for Lyophilizer Filling &
Sealing Area at Landhi Factory, Abbot Completed on August 2016
Laboratories (Pakistan) Ltd., Karachi.
34. Supply of Chemical Dehumidifier for ENO
Area, at GlaxoSmithKline Pakistan Ltd., Completed on August 2016
35-Docyard Road, West Wharf, Karachi.

42
35. Airconditioning, Mechanical Systems and
Ancillary Works for HEPA-2 at Hilton Completed in November 2016
Pharma (Pvt.) Ltd., Korangi Industrial
Area, Karachi.
36. Airconditioning System for Central Depot
at Landhi Factory, Abbott Laboratories Completed in February 2017
(Pakistan) Ltd., Karachi.

43
LIST OF MAJOR PROJECTS IN HAND
S.No. Brief Description

1. HVAC & Mechanical Works for Consolidation of Sterile Area and


Upgrading of Tablet Area in Non Lactam Block, GlaxoSmithKline
Pakistan Ltd., Korangi Factory, Karachi.
2. HVAC and Mechanical Works for ASTOLA Projects at Getz Pharma
(Pvt.) Ltd., Korangi Industrial Area, Karachi.

3. Airconditioning Systems and Ancillary Works for Cephalosporin


Building at Barrett Hodgson Pakistan (Pvt) Ltd., F-423, S.I.T.E.
Factory, Karachi.
4. Airconditioning and Ancillary Works for Production Area at Ground
Floor, Techno Ampoules (Pvt.) Ltd., Korangi Industrial Area, Karachi.

5. Airconditioning Systems And Ancillary Works For New Warehouse


at SAMI Pharmaceuticals (Pvt.) Ltd., F-140A, S.I.T.E, Karachi.
6. Airconditioning Systems & Ancillary Work for Micro Lab at
GlaxoSmithKline Pakistan Ltd., Korangi Factory Karachi.
7. Airconditioning Systems and Ancillary Work for Liquid Upgrade Project
at Abbott Laboratories (Pakistan) Ltd., Landhi Factory, Karachi.
8. Airconditioning Systems & Ancillary Work for Spansules Area, at
GlaxoSmithKline Pakistan Ltd., 35-Docyard Road, West Wharf,
Karachi.
9. Supply & Installation of AHUs and Ancillary Work for Lactam & Non
Lactam Block Warehouse at GlaxoSmithKline Pakistan Ltd., Korangi
Industrial Area, Karachi
10. Upgrade Work at Martin Dow Ltd., Korangi Industrial Area, Karachi.

11. Airconditioning Systems & Ancillary Work for Choco Tech & Others
Areas at Hilal Foods (Pvt) Ltd., Plot No. 23 & 24, Sector 15, Korangi
Industrial Area, Karachi.
12. OSD, Sterile and Lotion Facilities Alongwith Utility Block For ATCO
Laboratories Ltd., at Plot No. B-18, S.I.T.E., Karachi.
13. Upgrade of HVAC & Mechanical System for OSD and Warehouse at
Searle Company Ltd., F-319, S.I.T.E., Karachi.
14. HVAC & Mechanical Work for Raw Material Ware house at Abbott
Laboratories (Pakistan) Ltd., Landhi Factory, Karachi.
15. Supply & Installation of AHU, Coiling Coil and Ancillary Work for Fluid
Bed Dryer at Abbott Laboratories (Pakistan) Ltd., Landhi Factory,
Karachi.
16. HVAC Work for Capsule and AVT area in Tablet Building at Abbott
Laboratories (Pakistan) Ltd., Landhi Factory, Karachi.
17. Airconditioning & Ancillary Work for SVP Area Abbott Laboratories
(Pakistan) Ltd., Landhi Factory, Karachi.
18. Ventilation & Mechanical Services and Fire Fighting System as per FM
Recommendations at Reckitt Benckiser Pakistan Ltd., S.I.T.E., Karachi.

44
S.No. Brief Description

19. Supply & Installation/Modification of RO Water Treatment Plant


Systems for
Effluent Water Reuse in Boiler Feed an Cooling Water Systems at
Sanofi Aventis Pakistan Ltd., Korangi Industrial Area, Karachi.
20. HVAC & Mechanical Works for Gate Office Extension at
GlaxoSmithKline Pakistan Ltd., Korangi Industrial Area, Karachi
21. HVAC & Mechanical Works for Hinucon Production Facility at Korangi
Industrial Area, Karachi
22. Designing, Procurement and Installation of Water Chillers and Cooling
Towers for the Existing OSD and Sterile Manufacturing Facility at Getz
Pharma (Pvt) Ltd. Korangi Industrial Area, Karachi
23. HVAC & Mechanical Works for New Factory at Asian Continental, D-32,
S.I.T.E., Super Highway, Karachi.
24. Getz Pharma Pakistan (Pvt.) Ltd., Karachi. – ASTOLA Project

25. Air conditioning & Mechanical Systems And Ancillary Works for New
Pharma Block Extension at ATCO Laboratories Ltd., Plot No. B-18,
S.I.T.E, Karachi.
26. Replacement work of 400 TR Direct Gas Fired Absorption plants
including Cooling Towers , Chilled & Condenser water Pumps Allied
Piping Net work Etc at Shell Pakistan , Shell House Clifton Karachi
27. Air conditioning, Mechanical Systems And Ancillary Works For New
Sterile Area At Barrett Hodgson Pakistan (Pvt.) Ltd., F-423, SITE,
Karachi.
28. Air conditioning, Mechanical Systems And Ancillary Works For
Renovation of Tablet Area At Barrett Hodgson Pakistan (Pvt.) Ltd.,
F-423, SITE, Karachi.
29. Supply Of 2250USgpm x 4 Cooling Towers and Ancillary Works For
Plant Room Extension at Aga Khan University and Medical College
Foundation, Stadium Road, Karachi.
30. Air conditioning & Mechanical Systems And Ancillary Works For
Lab Area and 1st Floor Lab Area at Martin Dow Ltd.,
Korangi Industrial Area, Karachi.

45

You might also like