# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
CHAPTER III
A.NARRATIVE EXPERIENCES
On the first day, Mam Olive and Sir Archie Benauro oriented us about safety
rules, respecting the staffs, always wear uniform and I.D. Engr. Eduardo Ramos, the
division manager oriented us also about the safety rules when we went to Power Plant,
also Engr. Rolex Pimentel who first to discuss to us about the power plant and plant
equipment. We have a short discussion with sir Rolex about the functions of mechanical
and electrical equipment. They also teach us how to read the Power plants Blue Print
and the connection of it. We started reading the manuals of every equipment of the
power plant. After that, we went to Baligatan Hydro Electric Power Plant, we have an
actual discussion of the equipment like the generators, transformers. We went to control
room and we’ve there the operators, sir Flor Real and sir Marlon Mangahas, they are
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 02 – February 20
equipment, we read the manual of butterfly valve and we study the function of it. After
that, sir Rolex introduce to us one of the old equipment in the power plant that is place
in stock room, the governor, it is the main controller of the hydraulic turbine. The
governor varies the water flow through the turbine to control its speed or power output.
Generating units speed and system frequency may be adjusted by the governor.
Day 03 – February 21
We attended toolbox meeting with all the staff of Electro Mechanical Section. We
continue reading manual of equipment, I’ve read the manual of hydraulic turbine and
study the function of it. Hydraulic turbines have a row of blades fitted to the rotating
shaft or a rotating plate. Flowing liquid, mostly water, when pass through the hydraulic
turbines it strikes the blades of the turbine and makes the shaft rotate. There is three
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
types of turbine, Kaplan turbine, pelton turbine and francis turbine but the turbine they
Day 04 – February 22
We continue reading the manuals of the power plant, we went to Baligatan Hydro
Electric power plant for the clarifications of what we’ve read. We interviewed the on duty
plant operators, sir Ellioterio Dela Cruz,RME and sir Satur Bacani. We ask about
Day 05 – February 28
We attended the every morning meeting with the EMS staff, toolbox meeting is
important for them before they are deployed in there designated areas. Engr. Francis
requirement. Sir Francis told us that we need to study the whole sequence of the
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
power plant on how to operate ,how the pre start condition works and on how start and
Day 06 – March 01
and on how electrical is combined to mechanical works. We knew that a solenoid valve
is usually connected in the process of flow pipeline to control the flow of certain fluid like
liquid or air. The solenoid valve is the coil of the insulated or the enameled wire wound
around the solid or hollow shape made up of iron or steel or any other ferromagnetic
material. The solenoid valve is the electromechanical valve comprising of the solenoid
coil and a plunger which is connected to the stem of the valve and that is what we
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 07 – March 04
materials that they will use in painting of the metal equipment. We went again in the
power plant for the study of our presentation. Sir Ellioterio Dela Cruz one of the plant
excitation system in a generator, we knew that the rotor or the field coils in a generator
produce the magnetic flux that is essential to the production of the electric power. The
source to excite the magnetic field. This power comes from an exciter. That day, we
Day 08 – March 05
On the fifth day of March, we stay in office for the whole day. We read again the
manuals and we study the blue print of the power plant to understand more of what we
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 09 – March 06
We went to Baligatan Hydro Electric Power plant for the study of our
presentation. We take a photo of some equipment in the power plant for the additional
information in our study. We had sharing of ideas with my group mates so that all of us
Day 10 – March 07
On this day, we decided stay in the office so that we can read more manuals. We
continue studying about electrical relay, we knew that if the pre start condition of the
power plant does not done properly, the power plant will not start. We had a lot of relay
to study, specially in the control room, like K43Q, K410. Relays has there own functions
and purpose, there is a relay for shutdown, for start up, and there is a relay for
emergency shutdown.
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 11 – March 08
This is the last day of our first week on our ojt, we explore more on reading
manuals. We had a lot of discussion with my group mates about generators, turbines
and on how waters flow in a power plant. In the afternoon, we joined the flag retriet of all
Day 12 – March 11
We attended the toolbox meeting with EMS staff. After that, we continue the
research in our presentation, we read manuals and we use google to search some
Day 13 – March 12
We decided to go in the Baligatan Hydro Electric Power Plant because sir rolex
said that some parts of the control desk will upgrade. We witness the changing of pilot
bulb on the control desk. The pilot bulb is the indicators on the control desk. It is the
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 14 – March 13
This day we went to Baligatan Hydro Electric Power plant because some
mechanical equipment will be dis assemble by the plant mechanical. We witness the dis
power plant for the additional information in our study. We had a sharing of ideas with
Day 15 – March 14
answering some possible questions so that we can answer it correctly if the panels ask
us a question.
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 16 – March 15
This is the day of our presentation, in the morning we practice again our
presentation through group discussion. Afternoon of our sixteenth day of On the Job
training, we present our report to Engr. Francis Francisco, Engr. Rolex Pimentel and
Engr. Jesper Victorio. We did not answer some questions about mechanical functions of
the power plant, because we focus more in electrical and electronics functions of the
power plant. Engr. Francis told us that we need to study more in our presentation, we
Day 17 – March 18
francis said, we study again our report through reading manuals and we watch some
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 18 – March 19
Read the manual of the Operation and Maintenance of the Generator in BHEPP
reading the blue print of the power plant because it is more on mechanical theories.
Day 19 – March 20
Starts the day with a toolbox meeting at 8 a.m. And Presentation on how the
Day 20 – March 21
plant. If there is something we don’t understand in the manuals, we are asking sir Rolex
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 21 – March 22
on how it produces electricity when it is rotating. We have also a short discussion with
my group mates about it. Flag retreat in the afternoon 4:55 p.m.
Day 22 – March 25
Monday of March 25, we have a flag raising ceremony at 7:40 am with all the
staff of NIA. After that, we read the manual of excitation on how it is related in the
Day 23 – March 26
Starts the day with a toolbox meeting at 8 a.m. and read the manual of erection
of generator.
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 24 – March 27
Day 25 – March 28
Gathering Data on Automation of Baligatan Hydro Electric Power Plant, read the
manual of Easy Gen.’s and Schematic Diagram. Easy Gen. is a upgraded controller in
Day 26 – March 29
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 27 – April 01
Flag Ceremony at 7:45 in the morning and toolbox meeting afterwards. Gathering
Day 28 – April 02
After Toolbox meeting we go to BHEPP at 8:30 a.m. and stayed there whole day
Day 29 – April 03
Day 30 – April 04
Toolbox meeting in the morning and stayed whole day in the BHEPP.
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 31 – April 05
This day, we went to Baligatan Hydro Electric Power plant for the continuation of
Day 32 – April 08
Flag raising ceremony at 7:45 in the morning and Toolbox meeting, Inside
Inspection of the Spherical Valve, Penstock, THGP, Butterfly valve, Spiral Case, Wicket
Day 33 – April 09
On the 33th day of our On The Job training, we stay at the conference and read
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 34 – April 10
Gathering Data for new Presentation “How water will form to Electricity?”
Day 35 – April 11
Day 36 – April 12
Day 37 – April 15
Day of Presentation”
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
Day 38 – April 16
Day 39 – April 17
# 28 Carreon Street, Centro East, Santiago City, Tel. No. (078) 305-0139
B.CHALLENGES/DIFFICULTIES ENCOUNTERED
of an Engineer are never been easy for students like me to experience. Engineers must
possess a Good Communication and Leadership skills, an engineer must be best in all
That is what I need to improve to myself, my decision making skills is not yet
enough to be a real engineer. I need more practice and more experience to overcome
my incapability.
on gathering data’s and information for our reports. Engineers instruct us to go in the
Be friendly to the staff, don’t be shy to ask what thing I do not understand about
equipment and functions. That’s the solution I did in my problems on my On the Job
Training and that’s all works through cooperation of I and the staff.