1 ST-00036 24-May-16 Bridge #3 South RW1/2 Foundation 30.00 10.5000 7.1484 3.3621 10.5114 4.9350 0.1215
2 ST-00042 28-May-16 Bridge #3 North RW3/4 Foundation 30.00 10.5000 7.1484 3.3621 10.5114 4.9350 0.1215
3 ST-00024 12-May-16 Bridge #4 South RW1/2 Foundation 29.00 10.1500 6.9101 3.2500 10.1610 4.7705 0.1175
4 ST-00034 21-May-16 Bridge #4 South RW1/2 Foundation 5.00 1.7500 1.1914 0.5604 1.7519 0.8225 0.0203
5 ST-00022 16-May-16 Bridge #4 North RW Foundation 24.00 8.4000 5.7187 2.6897 8.4091 3.9480 0.0972
6 ST-00028 19-May-16 Bridge #4 North RW Foundation 24.00 8.4000 5.7187 2.6897 8.4091 3.9480 0.0972
7 ST-00030 17-May-16 Bridge #5 South RW1/2 Foundation 35.00 12.2500 8.3398 3.9225 12.2633 5.7575 0.1418
8 ST-00032 19-May-16 Bridge #5 North RW3/4 Foundation 32.00 11.2000 7.6250 3.5862 11.2122 5.2640 0.1296
9 ST-00044 30-May-16 Bridge #6 South RW1/2 Foundation 33.00 11.5500 7.8632 3.6983 11.5625 5.4285 0.1337
31-May-16 Bridge #6 North RW4 Foundation 16.00 5.6000 3.8125 1.7931 5.6061 2.6320 0.0648
10 ST-00046
1-Jun-16 Bridge #6 North RW3 Foundation 16.00 5.6000 3.8125 1.7931 5.6061 2.6320 0.0648
11 ST-00050 5-Jun-16 Bridge #7 North RW3/4 Foundation 34.00 11.9000 8.1015 3.8104 11.9129 5.5930 0.1377
12 ST-00052 6-Jun-16 Bridge #7 South RW1/2 Foundation 32.00 11.2000 7.6250 3.5862 11.2122 5.2640 0.1296
13 CV-00003 18-Jul-16 Bridge #8 South RW1/2 Foundation 35.00 12.2500 8.3398 3.9225 12.2633 5.7575 0.1418
14 ST-00069 13-Jun-16 Bridge #9 South RW2 Foundation Part 1 44.00 15.4000 10.4843 4.9311 15.4167 7.2380 0.1782
15-Jun-16 Bridge #9 South RW2 Foundation 55.00 19.2500 13.1054 6.1639 19.2709 9.0475 0.2228
15 ST-00064
16-Jun-16 Bridge #9 South RW7/10 Foundation 32.00 11.2000 7.6250 3.5862 11.2122 5.2640 0.1296
20-Jun-16 Bridge #9 South RW Foundation 24.00 8.4000 5.7187 2.6897 8.4091 3.9480 0.0972
16 ST-00066
21-Jun-16 Bridge #9 South RW Foundation 32.00 11.2000 7.6250 3.5862 11.2122 5.2640 0.1296
17 25-Jun-16 Bridge #9 South RW Foundation 8.00 2.8000 1.9062 0.8966 2.8030 1.3160 0.0324
18 26-Jun-16 Bridge #9 South RW Foundation 48.00 16.8000 11.4374 5.3794 16.8182 7.8960 0.1944
19 27-Jun-16 Bridge #9 South RW Foundation 48.00 16.8000 11.4374 5.3794 16.8182 7.8960 0.1944
20 ICP-CV-00002 20-Jul-16 T-IS3-S1 Foundation 40.00 14.0000 9.5312 4.4828 14.0152 6.5800 0.1620
21 27-Jul-16 T-IS3-S2 Foundation 29.00 10.1500 6.9101 3.2500 10.1610 4.7705 0.1175
22 ICP-ST-00021 2-Aug-16 T-IS3-S3 Foundation 40.00 14.000 9.53 4.48 14.02 6.58 0.16
23 ICP-ST-00024 4-Aug-16 T-IS3-S4 Foundation 19.00 6.650 4.53 2.13 6.66 3.13 0.08
24 25-Jul-16 T-IS1-S1 Foundation 38.00 13.300 9.05 4.26 13.31 6.25 0.15
25 ICP-ST-00029 8-Aug-16 T-IS1-S2 Foundation 37.00 12.950 8.82 4.15 12.96 6.09 0.15
26 14-Aug-16 T-IS1-S3 Foundation 38.00 13.300 9.05 4.26 13.31 6.25 0.15
27 29-Jun-16 QIS3-SWST3 S/S Foundation Blinding 8.00 2.800 1.91 0.90 2.80 1.32 0.03
28 12-Jul-16 QIS1-SS5 S/S Foundation Blinding 5.00 1.750 1.19 0.56 1.75 0.82 0.02
1 19-Jun-16 Bridge #3 South RW1 Foundation 8.00 2.6400 3.8696 2.5151 1.3200 0.0560
2 ST-00068 22-Jun-16 Bridge #3 South RW2 Foundation 8.00 2.6400 3.8696 2.5151 1.3200 0.0560
3 29-Jun-16 Bridge #3 North RW3/4 Foundation 16.00 5.2800 7.7392 5.0302 2.6400 0.1120
4 ST-00048 8-Jun-16 Bridge #4 South RW1/2 Foundation 18.00 5.9400 6.9246 5.6590 2.9700 0.1260
5 ST-00052 11-Jun-16 Bridge #4 North RW3/4 Foundation 16.00 5.2800 7.7392 5.0302 2.6400 0.1120
6 14-Jun-16 Bridge #5 South RW1/2 Foundation 16.00 5.2800 7.7392 5.0302 2.6400 0.1120
7 12-Jul-16 Bridge #5 North RW3/4 Foundation 16.00 5.2800 7.7392 5.0302 2.6400 0.1120
8 ICP-ST-00005 4-Jul-16 Bridge #7 South RW1/2 Foundation 16.00 5.2800 7.7392 5.0302 2.6400 0.1120
9 16-Jul-16 Bridge #7 North RW3/4 Foundation 16.00 5.2800 7.7392 5.0302 2.6400 0.1120
10 ICP-ST-00022 3-Aug-16 Bridge #8 South RW1/2 Foundation 17.00 5.6100 8.2229 5.3446 2.8050 0.1190
11 30-Jul-16 Bridge #9 South RW2 Part 1 18.00 5.9400 8.7066 5.6590 2.9700 0.1260
12 ICP-ST-00020 1-Aug-16 Bridge #9 South RW2 Part 2 17.00 5.6100 8.2229 5.3446 2.8050 0.1190
13 10-Aug-16 Bridge #9 South RW1 Foundation 24.00 7.920 11.61 7.55 3.96 0.17
14 14-Aug-16 Bridge #9 South RW1 Foundation 18.00 5.940 8.71 5.66 2.97 0.13
15 15-Aug-16 Bridge #9 South RW1 Foundation 17.00 5.610 8.22 5.34 2.81 0.12
16 ICP-ST-00028 10-Aug-16 T-IS3-S1 Foundation 24.00 7.920 11.61 7.55 3.96 0.17
Concrete Qty OPC Cement Micro-SIlica 10/20mm 4/10mm Washed Sand Epsilone HW
SN INR # Date of Casting Location Structure (m3) (Ton) GGBS (Ton) (Ton) Aggregate (m3) Aggregate (m3) (m3) Water (ton) 380 (ton)
1 21-Jun-16 Mock-up RC Structures 7.00 0.8820 1.9110 0.1470 1.6356 0.9514 2.1666 1.1200 0.0413
2 ST-00012 17-Jul-16 Bridge #3 South RW2 Foundation 111.00 13.9860 30.3030 2.3310 25.9352 15.0860 34.3556 17.7600 0.6549
3 ST-00008 20-Jul-16 Bridge #3 South RW1 Foundation 104.00 13.1040 28.3920 2.1840 24.2996 14.1346 32.1890 16.6400 0.6136
4 ST-00014 24-Jul-16 Bridge #3 North RW3/4 Foundation 205.00 25.8300 55.9650 4.3050 47.8983 27.8616 63.4496 32.8000 1.2095
5 ST-00001 5-Jul-16 Bridge #4 South RW1 Foundation 100.00 12.6000 27.3000 2.1000 23.3650 13.5910 30.9510 16.0000 0.5900
6 5-Jul-16 Bridge #4 South RW2 Foundation 118.00 14.8680 32.2140 2.4780 27.5707 16.0374 36.5222 18.8800 0.6962
7 ST-00006 13-Jul-16 Bridge #4 North RW3 Foundation 113.00 14.2380 30.8490 2.3730 26.4025 15.3578 34.9746 18.0800 0.6667
8 ST-00006 14-Jul-16 Bridge #4 North RW4 Foundation 104.00 13.1040 28.3920 2.1840 24.2996 14.1346 32.1890 16.6400 0.6136
9 21-Jul-16 Bridge #5 South RW1 Foundation 104.00 13.1040 28.3920 2.1840 24.2996 14.1346 32.1890 16.6400 0.6136
10 25-Jul-16 Bridge #5 South RW2 Foundation 106.00 13.3560 28.9380 2.2260 24.7669 14.4065 32.8081 16.9600 0.6254
11 ST-00023 2-Aug-16 Bridge #5 North RW3 Foundation 104.00 13.1040 28.3920 2.1840 24.2996 14.1346 32.1890 16.6400 0.6136
12 ST-00025 3-Aug-16 Bridge #5 North RW4 Foundation 104.00 13.104 28.392 2.184 24.300 14.13 32.19 16.64 0.61
13 ST-00018 31-Jul-16 Bridge #7 South RW2 Foundation 104.00 13.1040 28.3920 2.1840 24.2996 14.1346 32.1890 16.6400 0.6136
14 ST-00019 31-Jul-16 Bridge #7 South RW1 Foundation 104.00 13.1040 28.3920 2.1840 24.2996 14.1346 32.1890 16.6400 0.6136
15 ST-00026 4-Aug-16 Bridge #7 North RW3 Foundation 109.00 13.7340 29.7570 2.2890 25.4679 14.8142 33.7366 17.4400 0.6431
16 7-Aug-16 Bridge #7 North RW4 Foundation 108.00 13.6080 29.4840 2.2680 25.2342 14.6783 33.4271 17.2800 0.6372
Cumulative Quantity 1705.00 214.83 465.47 35.81 398.37 231.73 527.71 272.80 10.06
CP08-A1 Projec
Concrete
20mm Coarse
1
Aggregates
10mm Coarse
2
Aggregates
3 Fine Aggregates
4 OPC Cement
5 SRC Cement
6 Microsilica
7 GGBS
8 Water
Additive (Epsilone
9
HW 380)
Testing Frequency of Concrete Ingredients for Al Wataniya C
Test
Gradation, Material Finer Than 0.075mm, Specific Gravity, Water Absorption, Moisture Content, Bulk Density)
Flakiness Index, Elongation Index, Clay Lumps and Friable Particles, Lightweight Pieces, Shell Content, Acid Soluble
Chlorides, Acid Soluble Sulphate, Loss by Magnesium Sulphate, 10% Fines Value, Aggregate Crushing Value, Aggregate
Impact Value, Loss by LA Abrasion
Potential Reactivity
Drying Shrinkage
Gradation, Material Finer Than 0.075mm, Specific Gravity, Water Absorption, Moisture Content, Bulk Density)
Flakiness Index, Elongation Index, Clay Lumps and Friable Particles, Lightweight Pieces, Shell Content, Acid Soluble
Chlorides, Acid Soluble Sulphate, Loss by Magnesium Sulphate, 10% Fines Value, Aggregate Crushing Value, Aggregate
Impact Value, Loss by LA Abrasion
Potential Reactivity
Drying Shrinkage
Gradation, Material Finer Than 0.075mm, Specific Gravity, Water Absorption, Moisture Content, Bulk Density, Sand
Equivalent
Clay Lumps and Friable Particles, Lightweight Pieces, Shell Content, Acid Soluble Chlorides, Acid Soluble Sulphate, Loss
by Magnesium Sulphate
Organic Impurities for Fine Aggregates, Potential Reactivity
Drying Shrinkage
Chemical Properties of Cement and Physical Properties (Fineness, Setting Time, Soundness, Heat of Hydration, Early
Stiffening and Density)
Chemical Properties of Cement and Physical Properties (Fineness, Setting Time, Soundness, Heat of Hydration, Early
Stiffening and Density)
Chemical and Physical Properties
Chemical and Physical Properties
Sulphate Content (mg/L), Chloride Content (mg/L), ph Value, Total Dissolved Solids, Alkali Carbonates & Bicarbonates
Chemical Properties
Wataniya Concrete -CP08 A1 Project
hing Plant
Test Frequency -Status
QCS 2010 Section 1 Part 8 Cumulative Total
Frequency Requirements No. of Test
Quantity Sampling Remarks
Required
Consumed Conducted
Quantity Unit
2890.00
1000 m3 1 1 no test results submitted
4000 m3 0 0
617.59
16000 m3 0
20000 m3 0
1000 m3 0 0
4000 m3 0 0
461.23
16000 m3 0 0
20000 m3 0 0
4000 m3 933.38 0 0
16000 m3 0 0
20000 m3 0 0
50 ton 35.81 1 0
50 ton 465.47 9 7 no test results submitted
2000 m3 467.87 0 0
ltrs 15.64 0 0