GENERATOR SET
RATING DEFINITIONS
Brian Ponstein
Regional Sales Engineer
MTU Onsite Energy
Page 1 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
AGENDA
1. ISO Standard
2. Manufacturer Allowances
3. Exhaust Emissions
4. Specific Industry Ratings
5. Conclusion
Page 2 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
Page 3 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
8528-1 INTRODUCTION
What is ISO-8528?
• International standard for
reciprocating internal combustion
engine driven alternating current
generating sets
Page 4 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
8528-1 INTRODUCTION
• Where do our ratings come from?
8528-1: Applications, Ratings, &
Performance:
8528-2: Engines
8528-3: AC generators for gensets
8528-4: Control gear & Switchgear
8528-5: Generating Sets
8528-6: Test Methods
8528-7: Technical Declarations for Specifications and Design
8528-9: Measurement and Evaluations of Mechanical Vibrations
8528-10: Measurement of Airborne Noise
8528-12: Emergency Power Supply to Safety Services
Page 5 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
8528-1 RATINGS
Page 6 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
8528-1 RATING CRITERIA
• Load Variability
• Load Factor
Page 7 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
CRITERIA # 1: ANNUAL RUN-TIME
Emergency Prime Power Limited-Time Continuous Data Center
Rating Type Standby Power (PRP) running Power Power Power
(ESP) (LTP) (COP) (DCP)
Expected
Annual Run- ≤ 200 hours Unlimited ≤ 500 hours Unlimited Unlimited
time
The expected annual run-time criteria establishes the annual hourly usage
expectation
Page 8 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
CRITERIA # 2: LOAD VARIABILITY
Emergency Prime Power Limited-Time Continuous Data Center
Rating Type Standby Power (PRP) running Power Power Power
(ESP) (LTP) (COP) (DCP)
Expected Annual
Run-time
≤ 200 hours Unlimited ≤ 500 hours Unlimited Unlimited
Page 9 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
CRITERIA #3: LOAD FACTOR
Emergency Prime Power Limited-Time Continuous Data Center
Rating Type Standby Power (PRP) running Power Power Power
(ESP) (LTP) (COP) (DCP)
Expected Annual
Run-time
≤ 200 hours Unlimited ≤ 500 hours Unlimited Unlimited
The load factor criteria determines the expected average load over any 24
hour operating period
Page 10 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
ISO STANDARD
LOAD FACTOR EXAMPLE
1000kW STB rated unit
Power Time kW /
Output (hours) hrs
(kW)
24 hour load profile shown
1000 0.0 0
700 12.5 8750
650 8 5200 15,600 kW *hrs. accumulated
500 3.0 1500
300 0.5 150
15,600 kW * hrs.
Totals 24 15,600 Average Load = = 650 kW
24 hrs.
650 kW
Average Load Factor = = 65%
1000 kW
Page 11 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER
ALLOWANCES
Page 12 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
NET POWER vs. GROSS POWER
What is the difference?
Page 13 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
NET POWER vs. GROSS POWER EXAMPLE
Page 14 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
NET POWER vs. GROSS POWER EXAMPLE
Page 15 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
NET POWER vs. GROSS POWER EXAMPLE
Page 16 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
OVERLOAD CAPABILITY
What is overload?
Page 18 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
OVERLOAD CAPABILITY DIFFERNCES
How do manufacturer's differ?
Page 19 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
LOAD FACTOR – REAL WORLD ADVANTAGE
Page 20 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
LOAD FACTOR – REAL WORLD ADVANTAGE
Scenario # 1
Loads:
o (6) 25hp NEMA code G motors
o 150kW of LED Lighting
Page 21 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
LOAD FACTOR – REAL WORLD ADVANTAGE
Scenario # 2
Loads:
o (6) 25hp NEMA code G motors
o 150kW of LED Lighting
Page 22 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
LOAD FACTOR – REAL WORLD ADVANTAGE
Scenario # 3
Loads:
o (6) 25hp NEMA code G motors
o 150kW of LED Lighting
Page 23 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
LOAD FACTOR – REAL WORLD ADVANTAGE
Page 24 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
LOAD FACTOR – REAL WORLD ADVANTAGE
Page 25 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
LOAD FACTOR – REAL WORLD ADVANTAGE
As more efficient starting methods are utilized:
• Size of the genset is decreased due to
decreased in-rush
• Costs go down significantly
• Genset load factor is increased
(if allowed by manufacturer)
Rating ESP PRP COP
MTU Load Factor 85% 75% 100%
ISO-8528-1 Minimum 70% 70% 100%
Page 26 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
MAXIMUM ANNUAL ESP RUN-TIME
Page 27 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
MANUFACTURER ALLOWANCES
TIME BEFORE OVERHAUL (TBO)
Rating Hours
Some manufacturer’s do not publish a defined
ESP 8000
maintenance schedule with time before
10,000- overhaul clearly shown
PRP
15,000
• Without TBO defined, products, quality, and
COP 21,000 ratings cannot be compared
Page 28 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
Page 29 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
USA GENSET EMISSION CONSIDERATIONS
Facility
Complexity
Regional
Federal
Page 30 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
FEDERAL ENGINE CLASIFICATION
Environmental Protection Agency (EPA)
1. Stationary Emergency
2. Stationary Non-Emergency
Page 31 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
IMPACT TO GENSET RATINGS
• Not true!
Non-Emergency
Prime Power • Genset ratings are based on ISO-8528-1 &
Engines
the genset manufacturer's guidelines
Page 32 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
EMERGENCY REQUIREMENTS
Stationary Emergency Category
EMERGENCY DIESEL ENGINES
Engine
2016 2017 2018 2019 2020
Current requirements
Power breakdown into three Tiers:
<50-750hp Tier 3
<50-750hp: Engines: Tier 3
>750hp Tier 2
>750hp Engines: Tier 2
Page 33 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
NON-EMERGENCY REQUIREMENTS
Tier 4
Page 34 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
MOBILE REQUIREMENTS
Current requirements:
Tier 4
Page 35 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
FEDERAL CATEGORY EXCEPTIONS
Stationary
Class Emergency Non- Non-Road
Emergency Mobile Machinery
General When normal source Unlimited use in mobile
Unlimited
Usage (utility) is not available applications
• Must move facilities
Exceptions • 100 hours maint. & testing Requires once per year to be
& Notes inducement** considered mobile
** Inducement: Situation where engine must reduce power or shut down when emission
requirements are not met due to product malfunction, tampering, and poor quality or low diesel
emission fluid, etc.
Page 36 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
NON-EMERGENCY DECISION
Should I buy just what I need? Why does a customer want a Tier 4?
(Tier 2)
Page 37 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
NON-EMERGENCY DECISION
Page 38 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
EXHAUST EMISSIONS
NON-EMERGENCY DECISION
2. Inducement Concerns
EPA required shut-downs add
risk to mission critical
applications
Page 39 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
REGULATIONS/LEGISLATION
FACILITY LIMITS
Non-Attainment Areas
Non-Attainment Areas are
defined as counties that do
not meet the National
Ambient Air Quality Standards
(NAAQS)
Page 40 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
REGULATIONS/LEGISLATION
FACILITY LIMITS
Non-Attainment Areas
The Clean Air Act requires that
any State with Non-Attainment
Areas must develop a State
Implementation Plan (SIP) to
correct the problem.
Page 41 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
SPECIFIC INDUSTRY
RATINGS
Page 42 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
SPECIFIC INDUSTRY RATINGS
DATA CENTERS
Page 43 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
SPECIFIC INDUSTRY RATINGS
UPTIME INSTITUTE TIER CLASSIFICATION
Tier Requirement Tier I Tier II Tier III Tier IV
The Uptime Institute tier
System +
Source System
System certification refers to the
System Component Redundancy data centers' infrastructure
N N+1 Multiple N+1
(power & cooling)
that directly affects the
Distribution Paths 1
1 active and
2 active computer room operation
1 alternate
& uptime
Concurrently Maintainable No Yes
Fault Tolerance
No Yes
(single event)
Compartmentalization No Yes
The certifications are
Continuous Cooling Load Density Dependent
Yes
(Class A)
awarded in four “Tier”
Availability 99.67% 99.75% 99.98% 99.99% levels
Page 44 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
SPECIFIC INDUSTRY RATINGS
TIER COMPARISON TO ISO RATINGS
ISO 8528-1 Ratings Uptime Institute
Requirements
Rating Emergency Data Center Prime Power Limited-Time Continuous
Type Standby Power Power running Power Power Tier I & II Tier III & IV
(ESP) (DCP) (PRP) (LTP) (COP)
Expected
Annual ≤ 200 hours Unlimited Unlimited ≤ 500 hours Unlimited ≤ 200 hours Unlimited
Run-time
Load Constant or
Variable Variable Undefined Constant Variable Constant
Variability Variable
Average
Load ≤ 70% Undefined ≤ 70% ≤ 100% ≤ 100% Undefined ≤ 100%
Factor
Page 45 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
SPECIFIC INDUSTRY RATINGS
DATA CENTER CONTINUOUS POWER (DCCP)
Page 46 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
CONCLUSION
Page 49 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
CONCLUSION
THE BALANCING ACT
Specific Industry Manufacturer
Ratings Allowances
Genset Purchaser
Customers
ISO-8528-1 EPA Exhaust
Standard Emissions
Page 50 MTU Onsite Energy for Client / Date © MTU Onsite Energy GmbH / All rights reserved
THANK YOU.