You are on page 1of 2

Project: ABBATOIR - CONSTRUCTION OF NEW VIP TOILET, ATBATOIR & MARTKET STALLSWATCHER'S HUB (*1KC-ZXJZ-W64Z-MXE8)

PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1

PAD/PILE FOOTING RESULTS

F2
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C2 1 -44.5 0.0 -1.6 G+Q *F
2 -44.5 0.0 -1.6 G+QP11 *F
3 -44.5 0.0 -1.6 G+QP12 *F
4 -44.5 0.0 -1.6 G+QP21 *F
5 -44.5 0.0 -1.6 G+QP22 *F
6 -44.5 0.0 -1.6 G+QP31 *F
7 -44.5 0.0 -1.6 G+QP32 *F
8 -44.5 0.0 -1.6 G+QP41 *F
9 -44.5 0.0 -1.6 G+QP42 *F
10 -44.5 0.0 -1.6 G+QP51 *F
11 -44.5 0.0 -1.6 G+QP52 *F
12 -44.5 0.3 -1.6 G+Q+Wx+Nx
13 -44.5 -0.3 -1.6 G+Q-Wx-Nx
14 -44.5 0.0 -1.4 G+Q+Wy+Ny
15 -44.6 0.0 -1.8 G+Q-Wy-Ny
16 -44.5 0.3 -1.6 G+Wx+Q+Nx
17 -44.5 -0.3 -1.6 G-Wx+Q-Nx
18 -44.5 0.0 -1.4 G+Wy+Q+Ny
19 -44.6 0.0 -1.8 G-Wy+Q-Ny
20 -35.6 0.2 -1.3 G+Wx+Nx
21 -35.6 -0.2 -1.3 G-Wx-Nx
22 -35.6 0.0 -1.1 G+Wy+Ny
23 -35.7 0.0 -1.4 G-Wy-Ny
1C5 1 -38.9 0.0 -1.1 G+Q *F
2 -38.9 0.0 -1.1 G+QP11 *F
3 -38.9 0.0 -1.1 G+QP12 *F
4 -38.9 0.0 -1.1 G+QP21 *F
5 -38.9 0.0 -1.1 G+QP22 *F
6 -38.9 0.0 -1.1 G+QP31 *F
7 -38.9 0.0 -1.1 G+QP32 *F
8 -38.9 0.0 -1.1 G+QP41 *F
9 -38.9 0.0 -1.1 G+QP42 *F
10 -38.9 0.0 -1.1 G+QP51 *F
11 -38.9 0.0 -1.1 G+QP52 *F
12 -38.9 0.2 -1.1 G+Q+Wx+Nx
13 -38.9 -0.2 -1.1 G+Q-Wx-Nx
14 -39.0 0.0 -0.9 G+Q+Wy+Ny
15 -38.8 0.0 -1.3 G+Q-Wy-Ny
16 -38.9 0.2 -1.1 G+Wx+Q+Nx
17 -38.9 -0.2 -1.1 G-Wx+Q-Nx
18 -39.0 0.0 -0.9 G+Wy+Q+Ny
19 -38.8 0.0 -1.3 G-Wy+Q-Ny
20 -31.1 0.2 -0.9 G+Wx+Nx
21 -31.1 -0.2 -0.9 G-Wx-Nx
22 -31.2 0.0 -0.7 G+Wy+Ny
23 -31.0 0.0 -1.0 G-Wy-Ny
1C8 1 -39.7 0.0 -1.6 G+Q *F
2 -39.7 0.0 -1.6 G+QP11 *F
3 -39.7 0.0 -1.6 G+QP12 *F
4 -39.7 0.0 -1.6 G+QP21 *F
5 -39.7 0.0 -1.6 G+QP22 *F
6 -39.7 0.0 -1.6 G+QP31 *F
7 -39.7 0.0 -1.6 G+QP32 *F
8 -39.7 0.0 -1.6 G+QP41 *F
9 -39.7 0.0 -1.6 G+QP42 *F
10 -39.7 0.0 -1.6 G+QP51 *F
11 -39.7 0.0 -1.6 G+QP52 *F
12 -39.7 0.3 -1.6 G+Q+Wx+Nx
13 -39.7 -0.3 -1.6 G+Q-Wx-Nx
14 -39.6 0.0 -1.4 G+Q+Wy+Ny
15 -39.8 0.0 -1.8 G+Q-Wy-Ny
16 -39.7 0.3 -1.6 G+Wx+Q+Nx
17 -39.7 -0.3 -1.6 G-Wx+Q-Nx
18 -39.6 0.0 -1.4 G+Wy+Q+Ny
19 -39.8 0.0 -1.8 G-Wy+Q-Ny
20 -31.7 0.3 -1.3 G+Wx+Nx
21 -31.7 -0.2 -1.3 G-Wx-Nx
22 -31.7 0.0 -1.1 G+Wy+Ny
23 -31.8 0.0 -1.4 G-Wy-Ny
1C12 1 -28.4 0.0 -1.4 G+Q *F
2 -28.4 0.0 -1.4 G+QP11 *F
3 -28.4 0.0 -1.4 G+QP12 *F

Project: ABBATOIR
Project: ABBATOIR - CONSTRUCTION OF NEW VIP TOILET, ATBATOIR & MARTKET STALLSWATCHER'S HUB (*1KC-ZXJZ-W64Z-MXE8)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-2

4 -28.4 0.0 -1.4 G+QP21 *F


5 -28.4 0.0 -1.4 G+QP22 *F
6 -28.4 0.0 -1.4 G+QP31 *F
7 -28.4 0.0 -1.4 G+QP32 *F
8 -28.4 0.0 -1.4 G+QP41 *F
9 -28.4 0.0 -1.4 G+QP42 *F
10 -28.4 0.0 -1.4 G+QP51 *F
11 -28.4 0.0 -1.4 G+QP52 *F
12 -28.4 0.2 -1.4 G+Q+Wx+Nx
13 -28.4 -0.2 -1.4 G+Q-Wx-Nx
14 -28.4 0.0 -1.2 G+Q+Wy+Ny
15 -28.4 0.0 -1.6 G+Q-Wy-Ny
16 -28.4 0.2 -1.4 G+Wx+Q+Nx
17 -28.4 -0.2 -1.4 G-Wx+Q-Nx
18 -28.4 0.0 -1.2 G+Wy+Q+Ny
19 -28.4 0.0 -1.6 G-Wy+Q-Ny
20 -22.7 0.2 -1.2 G+Wx+Nx
21 -22.7 -0.2 -1.2 G-Wx-Nx
22 -22.7 0.0 -1.0 G+Wy+Ny
23 -22.8 0.0 -1.3 G-Wy-Ny
1C13 1 -29.1 0.0 -1.4 G+Q *F
2 -29.1 0.0 -1.4 G+QP11 *F
3 -29.1 0.0 -1.4 G+QP12 *F
4 -29.1 0.0 -1.4 G+QP21 *F
5 -29.1 0.0 -1.4 G+QP22 *F
6 -29.1 0.0 -1.4 G+QP31 *F
7 -29.1 0.0 -1.4 G+QP32 *F
8 -29.1 0.0 -1.4 G+QP41 *F
9 -29.1 0.0 -1.4 G+QP42 *F
10 -29.1 0.0 -1.4 G+QP51 *F
11 -29.1 0.0 -1.4 G+QP52 *F
12 -29.1 0.2 -1.4 G+Q+Wx+Nx
13 -29.1 -0.2 -1.4 G+Q-Wx-Nx
14 -29.1 0.0 -1.2 G+Q+Wy+Ny
15 -29.1 0.0 -1.6 G+Q-Wy-Ny
16 -29.1 0.2 -1.4 G+Wx+Q+Nx
17 -29.1 -0.2 -1.4 G-Wx+Q-Nx
18 -29.1 0.0 -1.2 G+Wy+Q+Ny
19 -29.1 0.0 -1.6 G-Wy+Q-Ny
20 -23.3 0.2 -1.1 G+Wx+Nx
21 -23.3 -0.2 -1.1 G-Wx-Nx
22 -23.3 0.0 -1.0 G+Wy+Ny
23 -23.3 0.0 -1.3 G-Wy-Ny
Columns: 1C2, 1C5, 1C8, 1C12, 1C13
bx = 230.0 mm by = 230.0 mm
Effects:
N = -44.6 kN Mx = 0.3 kN.m
My = 1.8 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h = 300.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 77.162 kN/m2 S-min = 51.962 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.25) =
80.000 kN/m2
As-min (Both Dir's) = 476.00 mm2/m
Punching Check (At Column Face):
Vt = 61.1 kN V-eff = 66.9 kN
v = 0.31 N/mm2 < v-Rdmax = 4.75 N/mm2
Punching Check (At 'd'):
Vt = 41.2 kN V-eff = 47.0 kN
v = 0.09 N/mm2 < v-Rdc = 0.51 N/mm2
X Dir: Footing Design: M = 5.7 kN.m/m
K/K' = 0.02 < 1.0
As = 476.00 mm2/m Y12-225
Shear Check (At Column Face):
v = 0.12 N/mm2 < v-Rdmax = 4.75 N/mm2
Shear Check (At 'd' from Column):
v = 0.04 N/mm2 < v-Rdc = 0.51 N/mm2
Y Dir: Footing Design: M = 5.5 kN.m/m
K/K' = 0.02 < 1.0
As = 476.00 mm2/m Y12-225
Shear Check (At Column Face):
v = 0.13 N/mm2 < v-Rdmax = 4.75 N/mm2
Shear Check (At 'd' from Column):
v = 0.05 N/mm2 < v-Rdc = 0.51 N/mm2

Project: ABBATOIR

You might also like