30 NO.

OF
BARBED WITH GI CONCENTRATING
WIRE GAUGE COIL FENCING 450Dia.
M 30
3mm HIGH
GRADE
L 50X50X6 m TENSILE
GI CONCERTING STEEL 7 NOS.
MS GI ANGLE COIL FENCING 450 Dia.
PRESTRESSED PRECAST
COLUMN 150X150
Panel 1830X305X50 PRESTRESSED
PRECAST PANEL
80 mm HOLE

305
SECTION 1-1
1830

80 MICRON HDG
ISA 50X50X6 305
EL. ( ) 0.000
FGL

WEEP HOLES IN LOWER 3mm HIGH


SECTION 2-2 TENSILE
MOST PANEL SHALL BE
950

STEEL 4 NOS.
1000

PROVIDED ACCORDING
TO SITE CONDITION
AND AS PER
MANUFACTURE'S GUIDE

295
LINE

1930 1930 300 DIA. PILE


300
(P.C.C M20 GRADE)
TYPICAL FENCING ELEVATION
300 WITH PRESTRESSED PRECAST
PANEL AND COLUMN SECTION 3-3

1930 1930 FGL


300 DIA. PILE
PLAN AT EL.( ) 0.000M LVL FGL
HIGHER

AS PER SITE
CONDITION
PORTION
300 Dia. PILE

950
1000
100

100

100
LOWER NOTES:-
PORTION 1. ALL DIMENSIONS ARE IN MM. UNLESS STATED OTHERWISE.
2. THIS DRAWING SHALL NOT BE SCALED. FOLLOW INDICATED
REFER PLAN
TYPICAL FOUNDATION DETAIL AT DIMENSONS.
EXPANSION JOINT GROUND LEVEL 3. GRADE OF CONCRETE
TYPICAL DETAIL FOR LOCATION (A) CAST IN SITU PEDESTAL :M20
1830

1830

1830
PILE AT DIFFERENT (B) PRE-CAST PRE-STRESSED COLUMN :M30
GROUND LEVEL (C) PRE-CAST PRE-STRESSED SLAB :M30
4. REINFORCEMENT SHALL BE HIGH STRENGTH DEFORMED BARS OF
GRADE FE- 500 CONFORMING TO 1786:1985.
REBAR SIZES ARE IN MM
EL. ( ) 0.000 EL. ( ) 0.000 EL. ( ) 0.000 5. CLEAR COVER FOR -
FGL FGL FGL (A) PEDESTAL : 50MM
(B) PRE-CAST PRE-STRESSED COLUMN: 25MM
6. WEEP HOLES SHOULD BE PROVIDED .
7. PRE-STRESSING STANDS SHALL BE OF-3MM HIGH TENSILE
950
950

950

CARBONIZED WIRE.
1000

1000

1000

8. NO. OF STANDS IN COLUMN-7 NOS.


9. NO. OF STANDS IN PLANK-4 NOS.
10. DTH MACHINE TO BE USED FOR DRILLING PURPOSE.
300 DIA. PILE 11. ALL WATER AND POWER REQUIREMENT FOR THE CONSTRUCTION
(P.C.C M20 GRADE) OF BOUNDARY.
REFER PLAN P.C.C PEDESAL REFER PLAN
P.C.C PEDESAL
M20 GRADE 12. ALL DIMENSIONS ARE IN MILLIMETER, CO-ORDINATES AND LEVEL
M20 GRADE ARE IN METER.
SECTION 4-4 300 13.THERE SHALL NO GAP BETWEEN PANEL AND GROUND, GROUND
SECTION 5-5 SECTION 6-6 SHALL BE APPROPRIATELY LEVELED AND ADEQUATELY COMPACTED
BEFORE ERECTION OF PANEL.
EXPANSION 25mm GAPE EVERY 30m
14. IN CASE THERE IS LEVEL DIFFERENCE IN GROUND ON OPPOSITE SIDE
OF BOUNDARY WALL/FOUNDATION, FOUNDATION DEPTH SHALL BE
MEASURED FROM GROUND ON LOWER LEVEL AND HEIGHT OF
300 DIA. PILE BOUNDARY WALL SHALL BE MEASURED FROM GROUND ON HIGHER
LEVEL, THIS MAY REQUIRED INCREASE IN LENGTH OF FOUNDATION
POST, IF POST FOR HIGHER LENGTH IS NOT AVALIABLE POST
EMBEDMENT DEPTH IN CONCRETE FOUNDATION MAY BE MEASURED
FROM FROM GROUND ON HIGHER LEVEL AND REINFORCEMENT CAGE
SHALL BE USED FOR THE ENTIRE DEPTH OF CONCRETE FOUNDATION.
15. FOUNDATION MEASUREMENT SHALL VARY IN ACCORDANCE TO
DETAIL AT EXPANSION JOIN STRATA FOUNDATION DEPTH SHALL MEASURED BELOW N.G.L.
DETAIL AT CORNER JOINT DETAIL AT INTERMEDIATE ( AT EVERY 30m INTERVAL)
LOCATION 16. 25mm GAP TO BE PROVED IN BETWEEN TWO FOUNDATION AT
EXPANSION JOINT SPACED AT EVERY 30 METER.
17. STRUCTURAL STEEL SHALL BE FY250.
18. M20 GRADE CONCRETE TO BE USED.

Date 21/01/2018 Client :- PRESTIGE GROUP DESCRIPTION :- INSTALLATION OF 30 MW SOLAR PVTITLE:- PRECAST BOUNDARY WALL DRAWING SIZE:- A1 SCALE:-NTS
1 Revison 1 28/01/2018 Prep. RK
EPC :- RAYS POWER INFRA PVT LTD., JAIPUR POWER PLANT AT KUSHTAGI KARNATAKA
0 First Issue 21/01/2018 Ckd. AG Consultant :- Tractebel Engineering Pvt. Ltd.
PROJECT DRG. NO.:-RPIPL-PG-PBW-001 REV.:-1 SH. 1 OF 1
Issue Remarks Date Approved NSG Original/Replacement for/Replaced by:- ORIGINAL