You are on page 1of 1

75mm Ø G.I.

PIPE
EMBEDDED POST
2'' x 4mm ANGLE BAR SCHEDULE 40
IN PAINT FINISH

POST - 2
2'' x 4mm ANGLE BAR

0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m
POST - 1
POST - 2

0.20 m 0.20 m

2'' x 4mm ANGLE BAR


2'' x 4mm ANGLE BAR

TRUSS DETAILS
SCALE: NTS

200

75mm Ø G.I. PIPE


1 21'' x 4mm ANGLE BAR 10 mm ɸ SQUARE BAR EMBEDDED POST
SCHEDULE 40
IN PAINT FINISH
100
1 21'' x 4mm ANGLE BAR 200

100
100
0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m
150
F.F.L. F.F.L.
0.20 m 0.20 m

1 21'' x 4mm ANGLE BAR


10 mm ɸ SQUARE BAR

BEAM DETAILS POST-1 DETAILS POST-2 DETAILS


SCALE: NTS SCALE: NTS SCALE: NTS

PROJECT NAME: PREPARED BY: RECOMMENN


DG
A
IPPROVAL: APPROVEB
D
Y: CONTENT: SHEET NO.:
1
IMPROVEMENT OF OUTDOOR 1 2'' x 4mm ANGLE BAR TRUSS DETAILS
BEAM DETAILS
HATCHERY BUILDING
ABDULLAH Y. MANGATONG MARICEL P. ANTIGA RAUL C. MILLANA. MFT
POST-1 DETAILS
6/7
LOCATION: ENGINEER II OIC, TOS-NABUNTURAN REGIONAL DIRECTOR
POST-2 DETAILS
KM. 92, NABUNTURAN, DAVAO DE ORO

You might also like