BP 2632-9 GB
Robust machines for economical High-rise conveying of concrete
and intelligent concrete conveying
2 3
For the tough daily operation, trailer The high-rise conveying of concrete Another storey can be concreted every
concrete pumps have to be powerful, makes very special demands on the three days – no problem for the potent
unflagging, robust, undemanding and concrete pump and the accessories. A BSA 14000 stationary pump and its
reliable. high delivery pressure must be available powerful placing booms. These ma-
but at the same time it must be possible chines are being successfully used in
This applies to smaller construction to transport a certain volume through Dubai, as in many other high-rise con-
sites where they render versatile service the delivery line. This of course calls struction sites around the world.
as inexpensive concrete pumps. In the for an appropriate engine performance.
case of large projects with extreme
high-rise and long-distance conveying Reliable advances in the construction
these machines also offer real power. of the Burj Dubai (Dubai Tower), which
Machines, concrete distributors, acces- (at over 700 m) will on completion be
sories and service, coupled with com- the tallest building in the world, have so
petent advice, make for a comprehensi- far been secured by several powerful
ve and economical solution. BSA 14000 SHPD super-high-pressure
pumps used in conjunction with MX 28
Putzmeister trailer concrete pumps are and MX 32 stationary booms. High-
based on technical pioneer achieve- pressure concrete has been successfully
ments. They keep attaining new records pumped to heights in excess of 400 m
in high-rise and long-distance convey- (as of March 2007) and then poured.
ing – and have been doing so for over
30 years!
2 BP 2632-9 GB BP 2632-9 GB 3
Long-distance Tunnel concreting
conveying of concrete Shotcreting
4 7
8
For long-distance conveying the pump Large amounts of concrete have to be The wet concrete spraying is the pio-
must be able to supply respectively transported over long distances for neering technology for modern tunnel
high pressure to be able to transport the BSA 14000 tunnel construction. Quite often it is only construction. But Putzmeister concrete
concrete reliably over extremely long BSA 2109 the Putzmeister concrete pumps that pumps also lead the way in securing
distances to the point of placement. All 15 m offer the most economical and quickest banks, slopes and excavations, sealing
line components are therefore tuned to solution, because in such cases high and refurbishing work, and also in plac-
an optimum flow of concrete. outputs and the reliability of all compo- ing textured and steel-fibre concrete.
nents in the system are required.
It was a Putzmeister concrete pump that Especially the compact trailer-mounted
achieved the world record in long- Hydraulic formwork distributors guided concrete pumps such as the P 715 or
distance conveying at the French Le on rails can be adjusted infinitely for the BSA 1002 are used for these appli-
Refrain – with 2105 metres. variable tunnel diameters. Flexible cations. Thanks to the fast switching
scissors-type delivery lines enable S-tube technology the concrete is
In operation was a BSA 14000 HP-D concreting of sections up to 12 m long sprayed without interruption and puls-
which is one of the most powerful 300 m without the line having to be opened. ation-free.
stationary concrete pumps available 15 m
world-wide. It was equipped with deli- 1700 m
very cylinders with 200 mm Ø and a Pumping record 2015 m
piston stroke of 2100 mm. As a control
measure, pressure sensors recorded
the hydraulic and concrete pressure
during placement of the concrete. BSA 1005 5
4 BP 2632-9 GB BP 2632-9 GB 5
Free Flow Hydraulics – EPS – Ergonic® Pump System –
the decisive ‘plus’ for pumping ensuring perfect operation inside
9 10
The advantages of EPS
When large amounts of concrete are ■ As there are no complicated control As an example: at a glance:
pumped, large amounts of oil also flow blocks, unnecessary warming of the For a BSA 1409-D with an output of
in the hydraulic system. oil is avoided which is also service- 94 m3/h and 71 bar (rod side oil sup- ■ smooth pumping process
friendly ply), 322 litres of oil flow in the closed ■ less noise emission thanks to the
The Free Flow Hydraulics of the FFH circuit within one minute (i=1:4.9); silence function
Putzmeister concrete pumps has consi- ■ All the oil flows in the closed circuit with piston side and the same amount ■ low wear
derable advantages: from the pump to the drive cylinder. of oil 106 bar is attained (i=1:3.3) in the ■ low fuel consumption
This means more performance and concrete. For a BSA 2110 HP-D with ■ fully electronic control of the
■ The closed oil circuit in the FFH less waste of energy compared to the 102 m3/h and 150 bar, it is 756 l/min concrete pump
generates more performance with open system with buffer oil tank. (i=1:2.3); with piston side and the same ■ fewer hydraulic components
less energy consumption amount of oil 220 bar pressure in the ■ doubly protected control
■ The reason why Putzmeister concrete concrete is attained (i=1.6).
■ Where valves would normally inter- pumps are so powerful and comfort-
rupt the flow of oil, the intelligent able is that the transmission is per- The Free Flow Hydraulics that has
monitoring system of the Putzmeister fectly adjusted: With the huge proven itself since 1981 brings more
pumps takes the oil to the drive amount of hydraulic oil used, a big performance, lowers costs and guaran-
cylinders without any loss oil pump together with big drive tees a reliable, long-life operation.
cylinders are generating high per- EPS (Ergonic® Pump System) is integrat- The switch-over of the transfer tubes, for Pump data, such as delivery pressure,
formances in every situation. ed in all BSA of the new generation and example, is adjusted to suit the consist- delivery rate, hydraulic pressure and
has considerable advantages over con- ency of concrete. This means that the many other signals, is actively and per-
ventional hydraulic controls: it regulates concrete does not “strike through” the fectly coordinated. This is not really pos-
the concrete pump fully electronically transfer tube, even if it is of a very soft sible with conventional hydraulic control
and ensures that the pumping process consistency. systems.
runs perfectly.
11
6 BP 2632-9 GB BP 2632-9 GB 7
The S-tube for placing difficult concrete
and high wear resistance
12
8 BP 2632-9 GB BP 2632-9 GB 9
World-record technology is a part of Performance and pressure
all Putzmeister concrete pumps adapted to every situation
16
The BSA series – the right concre- Superior with regard Superior with The surface ratio between the delivery High pressure oil
te pump for every application: to maintenance and service regard to operation piston (green in the diagram) and the Shuttle oil
hydraulic piston (red) determines the Conrete pressure
■ up to 571 kW drive with water hydraulic transmission ratio. The output Low-pressure oil
cooling* ■ Quick changing of the pistons due to ■ All essential operating elements are and concrete pressure depend upon this
Piston side
■ up to 200 m3/h concrete output* water box being open at top and bot- easily accessible and ergonomically ratio.
■ up to 320 bar concrete pressure* tom easily accessible water dischar- concentrated in one place
ge cock and automatic Piston Pull ■ Hot exhaust is guided upwards and With rod side pressurisation of the
* BSA 14000 SHPD System (for all HP machines) reduces the waste heat in the operat- hydraulic system the transmission is A3
■ Tidy interior providing good accessi- ing area greater compared to the piston side pres-
bility to all operating and maintenance ■ An hydraulic performance control surisation. This means a higher delivery Piston side = high concrete pressure
points automatically controls the relation- performance but a lower concrete pres- A2 low delivery performance
■ Practical level indicators – for Diesel ship between pressure and delivery sure. A1 A3
and hydraulic oil volume so that no manual adjustment i=
Superior in A1
■ Mini-gauge connections for quick is required when the maximum out- With piston side pressurisation a higher Rod side
operation
trouble-shooting put capacity is reached (standard as concrete pressure is attained with lower Rod side = low concrete pressure
■ All the essential points of lubrication from 2100 mm stroke) delivery performance. high delivery performance
■ Can be used under extreme tropical in the hopper area can be quickly ■ A hand winch with lifting force up to 3 A3
i=
conditions thanks to optimum air supplied via central lubrication with tonnes for set-up developed from site A2
flow with pressure ventilation progressive distributors experience (as from BSA 2100 mm) A2
■ Operation with closed hinged doors ■ Environmentally-friendly oil tray ■ Easily accessible connections for A1
for minimum noise emission ■ Smooth exterior surface for easy water (C-connection) and spray nozzle
■ Switch-over from rod to piston-side cleaning ■ Divided hinged doors protect against
operation is very simple rain and sun and against hot and
■ External gate-valve connection is rotating machine parts. Provide free
standard (as from 2100 mm stroke) access for easy maintenance.
■ Option: chassis with low-pressure
tyres for use on difficult terrain 15 17
■ Diagonal outriggers increase the Superior with Performance diagram As an example
support surface and improve the regard to quality BSA 14000 HP-D BSA 2110 HPD:
stability under load
■ Eyelets for additional tight clamping Pressurisation rod side piston side
of the machine, e.g. by turnbuckles ■ Minimum indoor temperature and
(as from 2100 mm stroke) low noise level with an enclosed Output 102 m3/h 76 m3/h
Pressure 150 bar 220 bar
machine Transmission i=1: 2.3 1.6
Stroke/min 28 19
10 BP 2632-8 GB BP 2632-8 GB 11
Useful details at a glance
18 19 25 26 27
Minimum operating noise thanks to fully soundproofed containers Level indicator for hydraulic oil The soot particle filter ist optional for all diesel Practical hinged doors for free access
(optional) versions of the new BSA generations. It is during service
already compulsory in Switzerland, parts of
Austria, the Benelux countries and Italy.
22 23 24 28 29 30
Central lubrication in the hopper area Easily accessible transfer tube switch-over Freely accessible water connection Simple connection of the remote control cable Clearly arranged display and control panel Mini-testing points for quick diagnosis
cylinders (as of 1400 mm stroke) (all BSAs of the new generation)
12 BP 2632-9 GB BP 2632-9 GB 13
Product range – everyday, special
and world-record breaking machines
BSA 700 and BSA 1000 – series BSA 2100 H / 2100 HP – series
The compact and quiet multi-purpose concrete pumps. The world-record setting long
Ideal also for shotcreting and conveying of fine (700) or stroke concrete pumps
normal concrete (1000) with high performance
32
33
31
P 715 TD BSA 1003-D BSA 1005-D* BSA 1005-E BSA 2109 H-D (E) BSA 2110 HP-D BSA 2107 HP-E
Output up to 20 m3/h 28 m3/h 54 m3/h 47 m3/h Output up to 95 m3/h (85 m3/h) 102 m3/h 71 m3/h
Concrete pressure up to 70 bar 80 bar 71 bar 55 bar Concrete pressure up to 152 bar 220 bar 220 bar
Drive 34 kW (Diesel) 47 kW (Diesel) 61 kW (Diesel) 45 kW (Electric) Drive 200 kW (Diesel) 330 kW (Diesel) 200 kW (Electric)
Delivery cylinder Ø 150 mm 150 mm 180 mm 180 mm 160 kW (Electric)
Piston stroke 700 mm 1000 mm 1000 mm 1000 mm Delivery cylinder Ø 200 mm 200 mm 200 mm
*SV version is optional Piston stroke 2100 mm 2100 mm 2100 mm
34
BSA 1405-E BSA 1407-D BSA 1408-E BSA 1409-D BSA 14000 HP-D BSA 14000 HP-E BSA 14000 SHP-D
Output up to 55 m3/h 71 m3/h 79 m3/h 94 m3/h Output up to 200 m3/h 95 m3/h 71 m3/h
Concrete pressure up to 106 bar 106 bar 106 bar 106 bar Concrete pressure up to 260 bar 220 bar 320 bar
Drive 75 kW (Electric) 115 kW (Diesel) 110 kW (Electric) 115 kW (Diesel) Drive 470 kW (Option 571 kW) 320 kW (Electric) 470 kW (Option 571 kW)
Delivery cylinder Ø 200 mm 200 mm 200 mm 200 mm Delivery cylinder Ø 180 / 200 / 280 mm 200 mm 180 mm
Piston stroke 1400 mm 1400 mm 1400 mm 1400 mm Piston stroke 2100 mm 2100 mm 2100 mm
*CAT standard
14 BP 2632-9 GB BP 2632-9 GB 15
The right power for pumping Putzmeister delivery lines
and accessories
36
With the concrete pressure performance Caution: The economical conveying of concrete
nomograph you can determine the amount Please use this nomogram for dimensioning with normal pumping concrete. The use does not only make great demands on
of power required to drive your concrete of concrete additives (plasticising admixtures) may heavily distort the result in the the concrete pump but also on delivery
pump for any given conveying task. lower right quadrant. lines and accessories.
40 cm and from there a horizontal are added to the 64 bar from the delivery
Cleaning connection for cleaning the delivery Cleaning accessories from left to right: sponge
line with air or water cleaning plugs, sponge cubes, sponge balls,
38 cleaning plugs 40
Mechanical distributor RV 13 for easy placing of concrete With shut-off valves and distribution valves,
complex pipeline systems with PM delivery lines
can be laid easily
16 BP 2632-9 GB BP 2632-9 GB 17
Putzmeister Services
43
Putzmeister offers you advanced and Technical Support: Putzmeister offer Knowledge Transfer: The Putzmeister
reliable machine technology – but what their customers a 24 hour emergency Academy provides thorough, individual
is important here is what stands behind service in Germany which is also steadi- training and seminars, hence making an
it: the people who are there when you ly being enlarged throughout Europe and important contribution to safety and
need them and who are able to help you overseas. Using Ergonic® Tele Service economic efficiency in concrete pump-
competently and quickly. (ETS), status and diagnostic data may be ing. This can take place in our modern
read and transmitted to our own work- in-house Academy facilities or on the
Putzmeister Services – your partner shop or to PM service partners using a customer’s premises (www.pm-akade-
world-wide for the conveying and plac- mobile phone. This ensures quick and mie.de). For large projects, our experts
ing of concrete. competent advice for service on site. and our customers together find the opti-
Each service being different and having mum solutions to their problems, no
Parts Service: Putzmeister delivers its own special focus, Putzmeister offers matter whether a calculation of the profit-
tested original spares with a guarantee tailored maintenance contracts which ability of the equipment is needed or a
precisely where they are needed, 24 guarantee availability of the concrete dependable spares supply has to be gua-
hours a day. With our electronic spares pump at all times. Depending on the cus- ranteed. Together with our customers, we
catalogue PEDOC 2007 with integrated tomer’s preference, Putzmeister provides form a proficient team to tackle any task.
ordering system via the Webshop, com- appropriate contracts for up to full ser-
piled individually for each type of con- vice to give optimum planning in terms
crete pump, our customers can identify of machine availability and cost. Expert
the original spare that they need, easily inspections of concrete pumps are sub-
and swiftly. As different requirements call ject to various national regulations. The
for different spare parts, we have develop- PM service organisation meets all re-
ed conveyor systems and accessories in quirements for manufacturer’s inspection
quality classes eco, key and proline. as recommended by VDMA: Qualified in-
They are all value for money in terms of spectors advise the fleet managers as
service life and purchasing price and, part of their formal responsibility for
what’s more, they are all original occupational safety, independent of the
Putzmeister parts. Selected spares may applicable legislation.
be ordered online from our internet shop
(http://www.elefantparts.com).
41 42 44 45 46
Supervision and parameterization of status data Tested Putzmeister quality parts Electronic list of spare parts, for your Most advanced training modules Individual training on site and in the PM
using Ergonic® Tele Service (ETS) convenience Academy
18 BP 2632-9 GB BP 2632-9 GB 19
You can find more information on all our station-
ary concrete pumps in the following brochures:
Putzmeister AG
Putzmeister Products and Services Max-Eyth-Str. 10 · 72631 Aichtal
Concrete Pumps · Industrial Technology PIT · P.O.Box 2152 · 72629 Aichtal
Telebelt · Mörtelmaschinen GmbH · Dynajet Tel. +49 (7127) 599-0
High Pressure Cleaners · Services · Concrete Fax +49 (7127) 599-520
Project Division CPD · Consulting and Data Internet: www.putzmeister.de
Technology · Academy E-mail: pmw@pmw.de
BP 2632-9 GB Right to make technical amendments reserved · © by Putzmeister AG 2007 · All rights reserved · Printed in Germany (20707RR)