1. GENERAL DESCRIPTION OF WORK: 19.

PLUMBING: REPUB LIC OF THE PHILIPPINES


The work to be done and executed shall include
the furnishing of labor and materials, equipment (See Addt'l Specifications on Plans) EARTH CHANGE NOTES: DRAWING INDEX
and specialized work in the construction of the All plumbing installation shall conform C I T Y E N G I N E E R S' O F F I C E
house completely as shown in the drawing and as with National Plumbing Code of the 1.0 STRIP ALL TOP SOIL IN CONSTRUCTION AREA AND STOCKPILE
specified herein. All reference to details and plans Philippines. All pipings and Arc- 01,,, Architectural
in the specifications, when not included in the set
of drawings,shall furnished later upon the request. fixtures shall be of good quality brand ap 2.0 TREES SHALL BE RETAINED AND PROTECTED DURING CONSTRUCTION
2. PROPORTION OF CONCRETE: proved by the Architect and the Owner(s). WHENEVER POSSIBLE.
All concrete work shall be done on strict accordance
20. LANDSCAPE AND INTERIOR DESIGNS:
with the Dept. of Public Works specifications for 3.0 ALL EXCESS MATERIAL SHALL BE GRADED EVENLY THROUGHOUT AREA
concrete and revised proportioning as follows: Landscape and Interior designs shall be
Use Class A (1:2:4) concrete mixture, unless approved by the Architects and the Owner(s). SCARED BY CONSTRUCTION STOCKPILED.
otherwise for footings, beams, columns, steps and
floors.Use Class B (1:2.5:5) concrete mixture,
4.0 TOP SOIL SHALL BE GRADED EVENLY THROUGHOUT CONSTRUCTION AREA.
ILOILO C I TY
unless otherwise specified for all thicker than Arc- 02,,, Architectural
100mm steps on fill, floor slabs on fill, concrete wall,
concrete drainage and catch basin, and other 5.0 ADDITIONAL FRUIT AND ORNAMENTAL TREES SHALL BE ENCOURAGED.
works of similar nature.
3. CONSISTENCY: Arc- 03,,, Architectural
It is being recognized that an excess of water 6.0 BUSH BERM ALONG EDGE OF CONSTRUCTION AREA TO PREVENT EROSION.
seriously reduces the strength of concrete, the
mixture shall be made as dry as possible to
7.0 SOIL TYPE ___________________________
produced of workable concrete.
4. REINFORCING STEEL BARS
Unless otherwise specified on plain, reinforcing 8.0 ZONING DISTRICT _____________________________________
steel bars shall be deformed bars and in accordance
with the metal reinforcing requirements of standard

T
specifications on highways and bridges as adopted

LO
by the government. when placed in work, it shall be LAND USE & ZONING
free dirt, paints, spills of other foreign substance.

NT
5. WOOD FORMS: 3

CE
Wood forms shall be sound, good quality, free from
large loose knots and otherwise suitable to facilitate

JA
finishing exposed concrete as specified. Arc- 04,,, Architectural

AD
6. CURING:
Use water curing which shall be affected by keeping
FI
AD

the forms at all times sufficiently wet with clean RE


W
water to prevent the joints in the forms of opening. AL
RO

Concrete surface not protected by forms shall be L


protected from the loss of surface moisture by
covering with craft paper quilts or burlaps. Protected
materials shall be kept thoroughly wet for the
duration of curing period which shall not less than 7
S - 01,,, Structural
days.
LINE&GRADE
7. EXCAVATIONS FOOTING AND
FOUNDATIONS:
The bottoms of all excavations for footing and
foundation which shall be undisturbed, earth
properly leveled off, tampered and approved by
the Architect. Excavations shall be entirely free
from water during the pouring of concrete.
8. CONCRETE FLOORS AND STEPS 4
ON FILL OR ON GROUND:
Concrete from steps on fill shall be laid on prepared LOT 19 BLOCK - 25
foundation which shall be placed as follow:
The earth or sand fill shall be laid to a uniform
2 AREA = 120 SQ. M. TECHNICAL DESCRIPTION S - 02,,, Structural
grade below the excavation of the finished floors,
being placed in the layers not exceeding 15cm in LINES BEARINGS DISTANCES
thickness,its layer being thoroughly wetted and ARCHITECTURAL
tampered.The said fill shall be made as concrete LOT 19, BLOCK - 25
walls and foundation shall have sufficient strength.
Concrete floor surface and other surface exposed
after removed of forms shall be kept moist for a 1-2 12.00 M.
period of at least 7 days after being placed.

T
All concrete placed during hot weather shall be FI

LO
protected from the rays of the sun and thoroughly
RE
W 2-3 10.00 M.
AL
wetted at least three times during the first 7 days.
NT
L
9. FOUNDATIONS: 3-4 12.00 M.
CE
All foundations shall be Class "A" (1:2:4) concrete
P - 01,,, Plumbing
JA

mixture with the necessary reinforcement indicated


T

in the plans. All zocalos shall be 0.15m thick 4-1 10.00 M.


LO

AD

concrete hollow blocks and shall be filled with


TIE LINE:
NT

class "B"(1:3:5) mortar mixture with the necessary


reinforcement as indicated in the plan. STRUCTURAL
CE

10. FLOORINGS: (See Schedule on Plan)


1 FROM MON #34,
JA

Unless otherwise noted on the plan, all flooring


shall be 0.10m thick concrete slab on fill on SITE DEVELOPMENT PLAN AGONOA CAD 8
AD

SCALE 1 : 110 MTS


at 0.50m on center bothways.
11. WALLS:
All exterior and interior walls shall be of concrete
hollow blocks with the necessary reinforcement
P - 02,,, Plumbing
unless otherwise indicated in the plans. S
A
L
12. CEILING: SE
O
G
R
All ceiling boards shall be of 6mm thick ordinary N.
BE I
V
NIG
E
plywoodnon 0.05x1.05m ceiling joist spaced at NO
AV R
ENU
SE
0.60m on center bothways. N.
BE
EW
ES
NIG TD
NO Parks IVE
13. DOORS AND WINDOWS : AV
and
Playground RS
IO

(See schedule on Plans)


EN
UE
WE
ST
DIV
N
RO
AD ELECTRICAL
ER CADELVA SUBD.

14. CABINETS: SIO


N

All cabinets shall be of ordinary plywood. 3 RO


AD

All cabinet doors shall be a 12mm thick plywood


and louver as indicated in the follow-up design. E - 01,,, Electrical
ROAD LOT 26 8.00 WIDE LOT 21 BLOCK 25 Parks
15. ROOFING: and
Playground
Unless otherwise noted on the plan, concrete
P N H C
roofing shall be 0.15m thick and shall be applied of
water proofing. Temp bars spaced at 0.50m on JARO
center bothways.
16. FINISHING HARDWARES: CADELVA SUBD.
All finishing hardwares shall be of first quality brand
4
MANDURRIAO
acceptable to the Architect and the Owner(s). LOT 19 BLOCK - 25
2 AREA = 120 SQ. M.
17. PAINTINGS:
All concrete walls shall received at least two coats SANITARY
of approved cement paint. All exposed lumber shall
PLAZA
received at least three coats of semi gloss paints
or varnish as per specifications of the Architects. ILOILO
AIRPORT
18. ELECTRICAL:
(See Addt'l Specifications on Plans) LOT 20 BLOCK 25
LOT 17 BLOCK 25 SM
All electrical installations shall conform CITY
E - 02,,, Electrical
with the latest National Electrical Code
of the Philippines and with the approval 1
of local Electrical Utility Company.
All electrical wiring and fixtures shall
be of good quality brand approved by
the Architect and the Owner(s).
MECHANICAL
CERTIFIED BY : PROJECT TITLE : OWNER : SHEET CONTENTS: SHEET NO.:

STRUCTURAL ENGINEER

REG. NO.:

PTR NO.:
PLACE:

DATE:
PROPOSED TWO STOREY RESIDENTIAL BUILDING
APPROVED
AS SHOWN
A-1