DAILY WELDING REPORT GRESIK GAS COGENERATION PLANT PROJECT

AREA LOCATION : WORKSHOP PT PLMB BALARAJA

Sheet Spool Joint Weld Type


No. Drawing Number
No. No. No. BW/FW

1 GGCP-03-LO-IM-011-PP 5 of 9 J-1 BW

2 GGCP-03-LO-IM-011-PP 5 of 9 J-2 BW

3 GGCP-03-LO-IM-011-PP 5 of 9 J-3 FW

4 GGCP-03-LO-IM-011-PP 5 of 9 J-4

5 GGCP-03-LO-IM-011-PP 5 of 9 J-5

6 GGCP-03-LO-IM-011-PP 5 of 9 J-6

7 GGCP-03-LO-IM-011-PP 5 of 9 J-7

8 GGCP-03-LO-IM-011-PP 5 of 9 J-8

9 GGCP-03-LO-IM-011-PP 5 of 9 J-9

10 GGCP-03-LO-IM-011-PP 5 of 9 J-10

11 GGCP-03-LO-IM-011-PP 5 of 9 J-11

12 GGCP-03-LO-IM-011-PP 5 of 9 J-12

13 GGCP-03-LO-IM-011-PP 5 of 9 J-13

14 GGCP-03-LO-IM-011-PP 5 of 9 J-14
15 GGCP-03-LO-IM-011-PP 5 of 9 J-15

16 GGCP-03-LO-IM-011-PP 5 of 9 J-16

17 GGCP-03-LO-IM-011-PP 5 of 9 J-17

18 GGCP-03-LO-IM-011-PP 5 of 9 J-18

TECHNICAL COMMENTS

Legend :
SW = Shop Weld NPS = Nominal Pipe Size
FW = Fillet Weld Thk = Thickness
BW = Butt Weld ACC = Accept

Prepared by, Checked/Reviewed by,


PT PLMB
PROJECT : GRESIK GAS COGENERATION PLANT PROJ
End User : PT Pupuk Indonesia Energi
Sub Contractor : PT Pembangunan Perumahan
Sub Contractor : PT Pacific Process Engineering
Ref. Standard :

Document No. : MP Steam Desuperheater

Ref. Drawing : GGCP-03-LO-IM-011-PP Rev.

Material
Component NPS Size (inch) Sch Rating Spec. Heat No.

14" 80

14"x10" 80

10"x1" #3000
RC = Re -Cap
N/A = Not Applicable

cked/Reviewed by, Witnessed/Reviewed by,


COGENERATION PLANT PROJECT
Report No. : 001/DWR-160346/MB-QC/IV/17
Date :

Page 5 of 9

Line No : 14"-MPS-3A-003-H-135

Welding Welder Electrode (AWS) Date Visual Inspection


WPS No.
Process Stamp Root Fill/Ca Fit Up Welding Fit Up

15/MB/GT-SM/VIII/07, GTAW W.07


16-Feb
20/MB/GMAW/IV/08 GMAW W.30
15/MB/GT-SM/VIII/07, GTAW W.07
17-Feb
20/MB/GMAW/IV/08 GMAW W.30
15/MB/GT-SM/VIII/07,
GTAW W.06 4-Mar
20/MB/GMAW/IV/08
15/MB/GT-SM/VIII/07,
20/MB/GMAW/IV/08
15/MB/GT-SM/VIII/07,
20/MB/GMAW/IV/08
15/MB/GT-SM/VIII/07,
20/MB/GMAW/IV/08
15/MB/GT-SM/VIII/07,
20/MB/GMAW/IV/08
15/MB/GT-SM/VIII/07,
20/MB/GMAW/IV/08
d/Reviewed by, Witnessed/Reviewed by,
Visual Inspection
Remarks
Welding

ACC

ACC

ACC
ed/Reviewed by,
DAILY WELDING REPORT GRESIK GAS COGENERATION PLANT PROJECT
AREA LOCATION : WORKSHOP PT PLMB BALARAJA

Sheet Spool Joint Weld Type


No. Drawing Number
No. No. No. BW/FW
1 GGCP-03-LO-IM-011-PP 4 of 9 J-1
2 GGCP-03-LO-IM-011-PP 4 of 9 J-2
3 GGCP-03-LO-IM-011-PP 4 of 9 J-3
4 GGCP-03-LO-IM-011-PP 4 of 9 J-4
TECHNICAL COMMENTS

Legend :
SW = Shop Weld NPS = Nominal Pipe Size
FW = Fillet Weld Thk = Thickness
BW = Butt Weld ACC = Accept

Prepared by, Checked/Reviewed by,


PT PLMB
PROJECT : GRESIK GAS COGENERATION PLANT PRO
End User : PT Pupuk Indonesia Energi
Sub Contractor : PT Pembangunan Perumahan
Sub Contractor : PT Pacific Process Engineering
Ref. Standard :

Document No. : MP Steam Desuperheater

Ref. Drawing : GGCP-03-LO-IM-011-PP Rev.

Material
Component NPS Size (inch) Sch Rating Spec. Heat No.

RC = Re -Cap
N/A = Not Applicable

cked/Reviewed by, Witnessed/Reviewed by,


COGENERATION PLANT PROJECT
Report No. : 001/DWR-160346/MB-QC/IV/17
Date :

Page 4 of 9

Line No : 14"-MPS-3A-003-H-135

Welding Welder Electrode (AWS) Date


WPS No.
Process Stamp Root Fill/Ca Fit Up Welding

10-Apr

d/Reviewed by, Witnessed/Reviewed by,


Visual Inspection
Remarks
Fit Up Welding

Witnessed/Reviewed by,
DAILY WELDING REPORT GRESIK GAS COGENERATION PLANT PROJECT
AREA LOCATION : WORKSHOP PT PLMB BALARAJA

Sheet Spool Joint Weld Type


No. Drawing Number
No. No. No. BW/FW
1 GGCP-03-LO-IM-011-PP 3 of 9 J-1 BW
2 GGCP-03-LO-IM-011-PP 3 of 9 J-2 BW
3 GGCP-03-LO-IM-011-PP 3 of 9 J-3 FW
4 GGCP-03-LO-IM-011-PP 3 of 9 J-4 BW
5 GGCP-03-LO-IM-011-PP 3 of 9 J-5 BW
6 GGCP-03-LO-IM-011-PP 3 of 9 J-6 BW
7 GGCP-03-LO-IM-011-PP 3 of 9 J-7
8 GGCP-03-LO-IM-011-PP 3 of 9 J-8
9 GGCP-03-LO-IM-011-PP 3 of 9 J-9
10 GGCP-03-LO-IM-011-PP 3 of 9 J-10 BW
11 GGCP-03-LO-IM-011-PP 3 of 9 J-11 BW
TECHNICAL COMMENTS

Legend :
SW = Shop Weld NPS = Nominal Pipe Size
FW = Fillet Weld Thk = Thickness
BW = Butt Weld ACC = Accept

Prepared by, Checked/Reviewed by,


PT PLMB
PROJECT : GRESIK GAS COGENERATION PLANT PROJE
End User : PT Pupuk Indonesia Energi Report No.
Sub Contractor : PT Pembangunan Perumahan Date
Sub Contractor : PT Pacific Process Engineering
Ref. Standard :

Document No. : MP Steam Desuperheater Page 3 of 9

Ref. Drawing : GGCP-03-LO-IM-011-PP Rev. Line No

Material
WPS No.
Component NPS Size (inch) Sch Rating Spec. Heat No.
2" 40S 1/MB/GTAW/X/06
2" 40S 1/MB/GTAW/X/06
2" 3000 1/MB/GTAW/X/06
2" 40S 1/MB/GTAW/X/06
2" 40S 1/MB/GTAW/X/06
2" 40S 1/MB/GTAW/X/06

2" 40S 1/MB/GTAW/X/06


2" 40S 1/MB/GTAW/X/06

RC = Re -Cap
N/A = Not Applicable

cked/Reviewed by, Witnessed/Reviewed by,


N PLANT PROJECT
: 001/DWR-160346/MB-QC/IV/17
:

: 2"-BFW-4SSB-002-H45

Welding Welder Electrode (AWS) Date Visual Inspection


Remarks
Process Stamp Root Fill/Ca Fit Up Welding Fit Up Welding
GTAW W.06 22-Feb ACC
GTAW W.06 18-Feb ACC
GTAW W.06 18-Feb ACC
GTAW W.06 18-Feb ACC
GTAW W.06 20-Feb ACC
GTAW W.06 20-Feb ACC

GTAW W.06 20-Feb ACC


GTAW W.06 21-Feb ACC

Witnessed/Reviewed by,
DAILY WELDING REPORT GRESIK GAS COGENERATION PLANT PROJECT
AREA LOCATION : WORKSHOP PT PLMB BALARAJA

Weld
Sheet Spool Joint
No. Drawing Number Type
No. No. No.
BW/FW
1 GGCP -03-LO-IM-011-PP 2 of 9 J-1 BW
2 GGCP -03-LO-IM-011-PP 2 of 9 J-2
3 GGCP -03-LO-IM-011-PP 2 of 9 J-3
4 GGCP -03-LO-IM-011-PP 2 of 9 J-4
5 GGCP -03-LO-IM-011-PP 2 of 9 J-5 BW
6 GGCP -03-LO-IM-011-PP 2 of 9 J-6
7 GGCP -03-LO-IM-011-PP 2 of 9 J-7
8 GGCP -03-LO-IM-011-PP 2 of 9 J-8 BW
9 GGCP -03-LO-IM-011-PP 2 of 9 J-9
10 GGCP -03-LO-IM-011-PP 2 of 9 J-10
11 GGCP -03-LO-IM-011-PP 2 of 9 J-11
12 GGCP -03-LO-IM-011-PP 2 of 9 J-12 BW
TECHNICAL COMMENTS

Legend :
SW = Shop Weld NPS = Nominal Pipe Size
FW = Fillet Weld Thk = Thickness
BW = Butt Weld ACC = Accept

Prepared by, Checked/Reviewed by,


PT PLMB
PROJECT : GRESIK GAS COGENERATION PLANT PROJE
End User : PT Pupuk Indonesia Energi Report No.
Sub Contractor : PT Pembangunan Perumahan Date
Sub Contractor : PT Pacific Process Engineering
Ref. Standard :

Document No. : MP Steam Desuperheater Page 2 of 9

Ref. Drawing : GGCP-03-LO-IM-011-PP Rev. Line No.

Material
WPS No.
Component NPS Size (inch) Sch Rating Spec. Heat No.
2" 40S 1/MB/GTAW/X/06

2" 40S 1/MB/GTAW/X/06

2" 40S 1/MB/GTAW/X/06

2" 40s 1/MB/GTAW/X/06

RC = Re -Cap
N/A = Not Applicable

hecked/Reviewed by, Witnessed/Reviewed by,


N PLANT PROJECT
: 001/DWR-160346/MB-QC/IV/17
:

: 2"-BFW-4SSB-002-H45

Welding Welder Electrode (AWS) Date Visual Inspection


Remarks
Process Stamp Root Fill/Ca Fit Up Welding Fit Up Welding
GTAW W.07 25-Feb ACC

GTAW W.07 25-Feb ACC

GTAW W.06 25-Feb ACC

GTAW W.06 25-Feb ACC

Witnessed/Reviewed by,
PROJECT : GRESIK GAS COGENERATION PLANT PROJECT
End User : PT Pupuk Indonesia Energi Report No. : 001/DWR/MB/IV/17
Sub Contractor: PT Pembangunan Perumahan Date :
Sub Contractor: PT Pacific Process Engineering
Ref. Standard :
Document No. : LP Steam Desuperheater Page 1 of 9
DAILY WELDING REPORT GRESIK GAS COGENERATION PLANT PROJECT
AREA LOCATION : WORKSHOP PT PLMB BALARAJA

Drawing Number/Line Sheet Joint Weld Material Welding Welder Date Visual Inspection
No. WPS No. Remarks
No. No. No. Type Component Size (inch)Class/Sch Spec. Heat No. Process Stamp Fit Up Welding Fit Up Welding
GGCP-03-LO-IM-011-PP Pipe 1'' 40S
1 1 of 9 J-1
2"-BFW-4SSB-002-H45 Tee 1'' #6000
GGCP-03-LO-IM-011-PP Tee 1'' #6000
2 1 of 9 J-2 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 Pipe 1'' 40S W.07 ### ACC
GGCP-03-LO-IM-011-PP Pipe 1'' 40S
3 1 of 9 J-3 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 Elbow 1'' #6000 W.07 ### ACC
GGCP-03-LO-IM-011-PP Elbow 1'' #6000
4 1 of 9 J-4 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 Pipe 1'' 40S W.07 ### ACC
GGCP-03-LO-IM-011-PP Pipe 1'' 40S
5 1 of 9 J-5
2"-BFW-4SSB-002-H45 Valve 1'' #1500
GGCP-03-LO-IM-011-PP Valve 1'' #1500
6 1 of 9 J-6
2"-BFW-4SSB-002-H45 Pipe 1'' 40S
GGCP-03-LO-IM-011-PP Pipe 1'' 40S
7 1 of 9 J-7 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 Elbow 1'' #6000 W.07 ### ACC
GGCP-03-LO-IM-011-PP Tee 1'' #6000
8 1 of 9 J-8 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 Pipe 1'' 40S W.07 ### ACC
GGCP-03-LO-IM-011-PP Pipe 1'' 40S
9 1 of 9 J-9 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 Valve 1'' #1500 W.07 ### ACC
GGCP-03-LO-IM-011-PP Valve 1'' #1500
10 1 of 9 J-10
2"-BFW-4SSB-002-H45 Pipe 1'' 40S
GGCP-03-LO-IM-011-PP Pipe 1'' 40S
11 1 of 9 J-11 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 Tee 1'' #6000 W.07 ### ACC
GGCP-03-LO-IM-011-PP Tee 1'' #6000
12 1 of 9 J-12 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 Pipe 1'' 40S W.07 ### ACC
GGCP-03-LO-IM-011-PP Pipe 1'' 40S
13 1 of 9 J-13 BW 1/MB/GTAW/X/06 GTAW
2"-BFW-4SSB-002-H45 End cap 1'' #3000 W.07 ### ACC
Legend :
SW = Shop Weld N/A = Not Applicable
FW = Fillet Weld
BW = Butt Weld

Prepared by, Checked/Reviewed by, Witnessed/Reviewed by, Witnessed/Reviewed by,


PT PLMB
PROJECT : GRESIK GAS COGENERATION PLANT PROJECT
End User : PT Pupuk Indonesia Energi Report No. : 001/DWR-346/MB/IV/17
Sub Contractor: PT Pembangunan Perumahan Date :
Sub Contractor: PT Pacific Process Engineering
Ref. Standard :
Document No. : LP Steam Desuperheater Page 1 of 9
DAILY WELDING REPORT GRESIK GAS COGENERATION PLANT PROJECT
AREA LOCATION : WORKSHOP PT PLMB BALARAJA

Sheet Weld Material Welding Welder Date Visual Inspection


No. Drawing Number Joint No. WPS No. Remarks
No. Type Component Size (inch)Class/Sch Spec. Heat No. Process Stamp Fit Up Welding Fit Up Welding

1 GGCP-03-LO-IM-011-PP 1 of 9 J-1
1" 40S
2 GGCP-03-LO-IM-011-PP 1 of 9 J-2 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
1" 40S
3 GGCP-03-LO-IM-011-PP 1 of 9 J-3 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
1" 40S
4 GGCP-03-LO-IM-011-PP 1 of 9 J-4 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
5 GGCP-03-LO-IM-011-PP 1 of 9 J-5

6 GGCP-03-LO-IM-011-PP 1 of 9 J-6
1" 40S
7 GGCP-03-LO-IM-011-PP 1 of 9 J-7 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
1" 40S
8 GGCP-03-LO-IM-011-PP 1 of 9 J-8 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
1" 40S
9 GGCP-03-LO-IM-011-PP 1 of 9 J-9 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
10 GGCP-03-LO-IM-011-PP 1 of 9 J-10
2" 40S
11 GGCP-03-LO-IM-011-PP 1 of 9 J-11 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
2" 40S
12 GGCP-03-LO-IM-011-PP 1 of 9 J-12 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
2" 40S
13 GGCP-03-LO-IM-011-PP 1 of 9 J-13 BW 1/MB/GTAW/X/06 GTAW
W.07 ### ACC
Legend :
SW = Shop Weld N/A = Not Applicable
FW = Fillet Weld
BW = Butt Weld

Prepared by, Checked/Reviewed by, Witnessed/Reviewed by, Witnessed/Reviewed by,


PT PLMB