MEPL Reference dwg no: NOTE


MEPL/19-20/DWG/034 for Total earthing layout.
A MEPL/19-20/DWG/035 for Switch yard earthing. 1. All dimensions are in mm. A

MEPL/19-20/DWG/036 for Transformer hall earthing. 2. 50x12mm MS flat used for earth
MEPL/19-20/DWG/037 for Power house earthing. grid(equivalent size of conductor to be
MEPL/19-20/DWG/038 for Butterfly valve chamber earthing. used).
MEPL/19-20/DWG/039 for BOQ. 3. All joints shall be painted using
Bituminous paint to avoid corrosion.
B B

SJVNL Refer dwg no:


PH-C2-AR3-C01/R1
TB-3-405-316-001(01of02)
Electrical Motor TB-3-405-316-001(02of02)
PH-AR3-BID-003
C
PH-AR3-BID-017 C

PH-AR3-BID-014
PH-AR3-BID-015
PH-AR3-BID-016
PH-AR3-BID-012
PH-AR3-BID-019
PH-C2-AR3-C23/R1
D PH-C2-AR3-C21 D

PH-C2-AR3-C17/R1
PH-C2-AR3-C34
PH-C2-AR3-C35 LEGEND
PH-C2-AR3-C36
PH-C2-AR3-C37
PH-C2-AR3-C38
E
PH-C2-AR3-C39 E

1 50x12mm MS Flat

F F

1
F.F.L
PROJECT:
GROUNDING SYSTEM DESIGN OF ARUN-3, HEP
CLIENT:
G SJVN Arun-3 Power Development Company(SAPDC) G

SAPDC'S CONSULTANT:
SJVN LIMITED
EARTHING CONSULTANT:
To Be Connected With MANAV ENERGY PVT LTD®
Sheet.Size
Protective Earth busbar/Main A3
DESIGN
NAME

MANI
SIGN DATE

21/10 /'19
TITLE

EARTHING FOR ELECTRIC MOTOR


Earth Grid CHKD.
APPD.
VIJAY
NAVEEN
22/10 /'19
23/10 /'19
MANAV DWG NO: CID:400 SCALE PROJECTION

H
12/02 /'20 03
01/02 /'20 02
Updated as per comments received on 7th February 2020
Updated as per comments received on 3rd January 2020
VIJAY NAVEEN
VIJAY NAVEEN
MEPL/19-20/DWG/033 NTS H

20/12 /'19 01
25/10 /'19 00
Updated as per comments received on 15thand 28th
November 2019
INITIAL RELEASE
VIJAY NAVEEN
VIJAY NAVEEN
MANAV ENERGY PVT. LTD
DATE REV.NO. DESCRIPTION CHECKED APPROVED SUBMITTED FOR APPROVAL INFORMATION REFERENCE RECORDS CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 P.No:9 of 47 16 17

You might also like