NOTE
MEPL Reference dwg no:
A MEPL/19-20/DWG/034 for Total earthing layout. 1. All dimensions are in mm. A

MEPL/19-20/DWG/035 for Switch yard earthing. 2. 50x12mm MS flat used for earth grid.
MEPL/19-20/DWG/036 for Transformer hall earthing. 3. All joints shall be painted using
MEPL/19-20/DWG/037 for Power house earthing. Bituminous paint to avoid corrosion.
MEPL/19-20/DWG/038 for Butterfly valve chamber earthing.
MEPL/19-20/DWG/039 for BOQ.

B Rebar B

SJVNL Refer dwg no:


PH-C2-AR3-C01/R1
TB-3-405-316-001(01of02)
TB-3-405-316-001(02of02)
C
PH-AR3-BID-003 C

PH-AR3-BID-017
PH-AR3-BID-014
PH-AR3-BID-015
Arc welding PH-AR3-BID-016
PH-AR3-BID-012
D
PH-AR3-BID-019 D

PH-C2-AR3-C23/R1
PH-C2-AR3-C21
PH-C2-AR3-C17/R1
PH-C2-AR3-C34 LEGEND
Equivalent size of Cu cable PH-C2-AR3-C35
PH-C2-AR3-C36
E PH-C2-AR3-C37 E

PH-C2-AR3-C38
PH-C2-AR3-C39

F F

PROJECT:
GROUNDING SYSTEM DESIGN OF ARUN-3, HEP
CLIENT:
G
SJVN Arun-3 Power Development Company(SAPDC) G

SAPDC'S CONSULTANT:
SJVN LIMITED
EARTHING CONSULTANT:

50x12mm MS flat MANAV ENERGY PVT LTD®


Sheet.Size
NAME SIGN DATE TITLE
A3
main earth grid DESIGN
CHKD.
MANI
VIJAY
21/10 /'19
22/10 /'19
REBAR TO EARTH GRID
CONNECTION
APPD. NAVEEN 23/10 /'19
MANAV DWG NO: CID:400 SCALE PROJECTION

H
12/02 /'20 03
01/02 /'20 02
th
Updated as per comments received on 7 February 2020
Updated as per comments received on 3rd January 2020
VIJAY NAVEEN
VIJAY NAVEEN
MEPL/19-20/DWG/033 NTS H

20/12 /'19 01
25/10 /'19 00
Updated as per comments received on 15thand 28th
November 2019

INITIAL RELEASE
VIJAY NAVEEN
VIJAY NAVEEN
MANAV ENERGY PVT. LTD
DATE REV.NO. DESCRIPTION CHECKED APPROVED SUBMITTED FOR APPROVAL INFORMATION REFERENCE RECORDS CONSTRUCTION