SAUDI ARAMCO INSPECTION CHECKLIST
Laboratory Testing Inspection SAIC-A-1009 24-Mar-16 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Laboratory CBR tests should use the "three-point" method along with soil
SAES-A-113
A3 density results to estimate the in-situ CBR and the CBR at recommended
Sec. 6.5.2
compaction density
All soil and rock samples shall be retained for a minimum of two months
SAES-A-113
A5 after completion of the geotechnical investigation. Samples must be kept
Sec. 5.5
according to ASTM D4220 and D5079.
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-113 -- Geotechnical Engineering Requirements, 19 June 2012