CURRICULAM VITAE

GNS VARSHA
gnsvarsha@gmail.com
Ph. No: 9676466378

CAREER OBJECTIVE

I wish to work with an organization, which gives more exposure and best standards. Where
I can widen my knowledge base and work hard. I would like to be an asset to the organization
for which I am working and improve my career by rendering effective contribution to the
organization.

EDUCATIONAL QUALIFICATIONS

 Master of Technology in Construction Planning and Management(CPM) - 2018


Shri Shirdi Sai Institute of Science and Engineering, (Affiliated to JNTU-Anantapur),
Anantapur, A.P.
(Waiting for Provisional Certificate)

 Bachelor of Technology in Civil Engineering - 2013


PVKK Institute of Technology, (Affiliated to JNTU-Anantapur),
Anantapur, A.P.
Graduated with 70.94%

PERSONAL STRENGHTS

 Zeal to learn new technologies and undertake challenging tasks


 Ability to work with challenges, self motivator, Team player
 Good Oral & written communication skills in English

TECHNICAL SKILLS

 AutoCAD, MS Office (Word & Excel)

PERSONAL DETAILS

 Name : G N S Varsha
 Father Name : GS Naidu
 Marital status: Married
 Date of Birth : 17/07/1992
 Sex : Female
 Languages Known: Telugu, English, Hindi
 Contact Address: Door No: 3-662/6, Guest House Road,
Opp: Suzuki Show room, Undavalli center,
Guntur, A.P., 522501

DECLARATION

I, GNS Varsha the undersigned, certify that to the best of my knowledge and belief, this data
correctly describes my qualifications and other details.

Date: 19/02/2019 Signature:


Place: Vijayawada Name: GNS Varsha
International Journal of General Science
and Engineering (IJGSE)
Certificate of Publication
This is to certify that the manuscript entitled
AN INVESTIGATIONAL REPORT ON CONSTRUCTION DELAY
AND DISTRUPTION ANALYSIS IN CONSTRUCTION
Authored by
Govindu Nirmal Stanley Varsha
has be Published in Volume-6 Issue-4-2018
In
International Journal of General Science and Engineering (IJGSE)
the mentioned paper measured upto the required standard

E-Certificate Number-IJGSE-098020907156842609
International Journal of General Science and Engineering
Volume-6 Issue-4 April-2018
ISSN 2349 8439
AN INVESTIGATIONAL REPORT ON CONSTRUCTION
DELAY AND DISTRUPTION ANALYSIS IN CONSTRUCTION
Govindu Nirmal Stanley Varsha1, C.Nagarjuna2
1
M.Tech Student, Dept. of Construction Planning and Management, Shri Shiridi Sai
Institute of Science and Engineering.
2
Assistant Professor, Dept. of Construction Planning and Management, Shri Shiridi Sai
Institute of Science and Engineering.
__________________________________________________________________________________________
ABSTRACT: Construction delays are widespread in most projects around the world. Some
delays may happen in the preconstruction phase which is defined as the period beginning
from the initial conception of the project to the signing of the contract between the owner and
the contractor; however some of them may happen in the construction phase that is the period
when actual construction is under way. Project schedules are consistently dynamic and
uncertain. Several controllable and uncontrollable factors can adversely affect the project
schedule and cause delays. These delays definitely create negative impacts on project
performance. Schedule delay in the completion of a construction project may be a major
difficulty for contractors leading to costly disputes and adverse relationships between project
participants.challenge are to measure the net impact of construction delays accurately.
Otherwise, there may appear delay claims between all parties involved in the construction
process. The method of schedule delay analysis technique should be acceptable to all
participants through the project.
There are many studies on construction schedule delays and several techniques are proposed
for analyzing schedule delays. Schedule delay analysis is used in order to identify delays and
to measure the net impacts of delays on a project. Basic tools which are used in the schedule
analysis are known as bar chart schedules and critical path method (CPM) schedules. As
stated before, many articles have presented common schedule analysis techniques and some
of them also have proposed new methodologies to the construction industry. However, there
is no single method used for all kind of delay claims that is applicable in all kind of projects
since each of the technique has its own advantages and disadvantages. Common
methodologies covered in the literature are; As-planned versus as-built, Impacted as-planned,
Collapsed as-built, Window analysis, Relative importance index (RII) and Time impact
analysis. These methods were studied and two of them were applied to this project.
Delays in the completion of construction projects are often unavoidable. The project schedule
which is planned at the beginning of the project is prone to being changed for many times and
unfortunately causes delays. As a result, schedule delays may be a major problem for

Govindu Nirmal Stanley Varsha, C.Nagarjuna 30