BORELOG
Ground Engineering Services & Solutions
BOREHOLE NO.
(Geotechnical Engineering Department)
BH-01
PROJ.: GEOTECHNICAL SITE INVESTIGATION - LSP044 Drilling Started on:

MOZA JEEVAN PURA KHURD FAISALABAD ROAD, TEHSIL AND DISTRICT 08-03-2019
LOCATION:
SHEIKHUPURA. Drilling Completed on:
08-03-2019
CLIENT: IKAN ENGINEERING SERVICES (PVT.) LTD. Inspector:
DRILLING INFORMATION Faizan
PROJECT NO: AJK/GT/333-110 Driller:
METHOD OF DRILLING: Auger/Percussion
SAMPLING METHODS CO-ORDINATES: Saleem
WEIGHT: 63.5 Kg North: 31.69314 East: 73.98524 Direction / Inclination:
DROP: 76cm GROUND WATER TABLE: Not Encountered. Vertical
1 2 3 4 5 6 7 8 9
SAMPLE TYPE /

N VALUES
Std. Penetration Test
Depth (m)

SPT
Data
Profile
NO.

Subsurface Description BLOWS


Blows per 30cm
6" 6" 6" 0 10 20 30 40 50
0.0 Plot Level w.r.t adjacent road = Equal 0.0

1.0 S-1 FILLING MATERIAL 1 2 2 4 1.0

Silty Clay, Pieces of Bricks, etc.

2.0 S-2 SILTY CLAY 2 2 1 3 2.0

Brown, Soft,

3.0 S-3 Brown, Medium Stiff, 2 2 2 4 3.0

4.0 S-4 SILTY SAND 2 3 3 6 4.0

Greyish Brown, Loose,

5.0 S-5 Grey, Loose, 3 3 4 7 5.0

6.0 6.0

6.5 S-6 Grey, Medium Dense, 4 6 8 14

7.0 7.0

8.0 S-7 ‒ ‒ ‒ same as above ‒ ‒ ‒ 6 7 9 16 8.0

9.0 9.0

10.0 S-8 ‒ ‒ ‒ same as above ‒ ‒ ‒ 7 8 9 17 10.0

L E G E N D:

SPT/S Standard Penetration Test & Number CPT/C Cone Penetration Test & Number
U Undisturbed Sample R N Value > 50
SHEET 1 OF 1
GEOTECHNICAL ENGINEERING DEPARTMENT

Head Office :3rd Floor, 72 West, Opposite Saudi Pak Tower, Blue Area, Islamabad. Ph: 92.51.2803010 Fax: 92.51.2803011
Lahore Office: G-5, Al-Hafeez View, 67-D/1, Sir Syed Road, Liberty Commercial Zone, Gulberg III, Lahore. Ph: 92.42.35789953 Fax: 92.42.35789954
Email: info@ajk.net.pk
AJK
Graph Between Width of Foundation and Allowable Bearing Capacity
Tower Foundation
(Isolated / Raft) Settlement = 25mm
400
Depth = 3.00 m

350
Allowable Bearing Capacity (kPa)

300

250

200

150

100

50

0
1 2 3 4 5 6 7 8 9

Width of Foundation (m)

* Bearing Capacity is based on soil improvement. It is recommended to remove and replace loose/fill material up to 0.5m below the
foundation level and replace with well graded granular material (compacted layers). Each Layer thickness should not be more than
150mm.
Bearing Capacity Chart
CLIENT: For Tower FIGURE: 2

SITE ID: LSP044 Isolated / Raft Foundation


REVISION: 0
PROJECT NO. AJK/GT/333-110 Settlement = 25mm

Head Office :3rd Floor, 72 West, Opposite Saudi Pak Tower, Blue Area, Islamabad. Ph: 92.51.2803010 Fax: 92.51.2803011
Lahore Office: G-5, Al-Hafeez View, 67-D/1, Sir Syed Road, Liberty Commercial Zone, Gulberg III, Lahore. Ph: 92.42.35789953 Fax: 92.42.35789954
Email: info@ajk.net.pk
AJK
Graph Between Width of Foundation and Allowable Bearing Capacity
Tower Foundation
(Isolated / Raft) Settlement = 50mm
400
Depth = 3.00 m

350
Allowable Bearing Capacity (kPa)
300

250

200

150

100

50

0
1 2 3 4 5 6 7 8 9

Width of Foundation (m)

* Bearing Capacity is based on soil improvement. It is recommended to remove and replace loose/fill material up to 0.5m below the
foundation level and replace with well graded granular material (compacted layers). Each Layer thickness should not be more than
150mm.
Bearing Capacity Chart
CLIENT: For Tower FIGURE: 3

SITE ID: LSP044 Isolated / Raft Foundation


REVISION: 0
PROJECT NO. AJK/GT/333-110 Settlement = 50mm

Head Office :3rd Floor, 72 West, Opposite Saudi Pak Tower, Blue Area, Islamabad. Ph: 92.51.2803010 Fax: 92.51.2803011
Lahore Office: G-5, Al-Hafeez View, 67-D/1, Sir Syed Road, Liberty Commercial Zone, Gulberg III, Lahore. Ph: 92.42.35789953 Fax: 92.42.35789954
Email: info@ajk.net.pk
AJK
Graph Between Width of Foundation and Allowable Bearing Capacity
Generator Foundation
Depth of Foundation = 1.0m Settlement = 25mm
200
Square Footing Strip Footing

180

Allowable Bearing Capacity (kPa) 160

140

120

100

80

60

40

20

0
0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8

Width of Foundation (m)

* Bearing Capacity is based on soil improvement. It is recommended to remove and replace loose/fill material up to 1.0m below the
foundation level and replace with well graded granular material (compacted layers). Each Layer thickness should not be more than
150mm.
Bearing Capacity Chart
CLIENT: For Generator FIGURE: 4

SITE ID: LSP044 Square / Strip Foundation


REVISION: 0
PROJECT NO. AJK/GT/333-110

Head Office :3rd Floor, 72 West, Opposite Saudi Pak Tower, Blue Area, Islamabad. Ph: 92.51.2803010 Fax: 92.51.2803011
Lahore Office: G-5, Al-Hafeez View, 67-D/1, Sir Syed Road, Liberty Commercial Zone, Gulberg III, Lahore. Ph: 92.42.35789953 Fax: 92.42.35789954
Email: info@ajk.net.pk

You might also like