You are on page 1of 2

REV- 00 VBSLP-RAJVDE-BC-L0-DR-C-0068 NO.

3 4 5 6 7 8 9 10 11 12 13 14 15 16
DWG.

Directions missing
A A

NOTES :

1. FOR GENERAL NOTES REFER TO DWG. NO.


VBSLP-RAJVDE-CC-00-DR-S-0019.

2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS


WITH RESPECT TO MEAN SEA LEVEL UNLESS NOTED OTHERWISE

3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH

50
N2 HIGHWAY DRAWINGS No. VBSLP-RAJVDE-CR-L3-DR-C-0019 TO
B 106
ON HOLD B

707
VBSLP-RAJVDE-CR-L3-DR-C-0024 AND ELECTRICAL DRAWINGS
9 50 VBSLP-RAJVDE-EL-L3-DR-E-0041 TO VBSLP-RAJVDE-EL-L3-DR-E-0043.

E2
4. SPANS ARE MEASURED ALONG ALIGNMENT.
℄ ABUT. "B3A2"
STA. 664.104 ℄ PIER "B311" 5. FOR PILE G.A & R.C. DETAILS REFER TO DWG
℄ PIER "B310"
MEASURED ALONG DECK ℄ STA. 0+605.507 VBSLP-RAJVDE-BC-L0-DR-S-0112.
ᴖ58800 STA. 0+545.503 ℄ PIER "B309"
E 270879.969 MEASURED ALONG RAMP 3 ALIGMET ᴖ 58597 ᴖ 60000
N 2106996.778 ᴖ 60000
STA. 0+485.488 6.FOR ABUTMENT PILE CAP DETAILS REFER TO DWG
E 270878.989 ᴖ60004 VBSLP-RAJVDE-BC-L1-BR-S-104
E 270883.602 N 2106998.635 ᴖ 60015
N 2106996.319 E 270878.294 E 270772.182
C N 2106946.527 C
N 2106993.521
"1" "2"
E 270876.336 "1"
"3" N 2106997.236 "1"
T.P.
"4" "5" T.P.
E 270878.010
"6" N 2107000.493 Pile GA is missing
"2"
"7" "8" "2"
in the said drawing
0+600 only RC details are
E 270881.643 Pile cap details and provided.
0+500

N 24°13'50" W
℄ DECK D
N 27°47'48" W

D N 2107000.034 BC-RAMP_03 RAMP_03 dimensions re


E 270874.377

N 24°17'44" W
ALIGNMENT missing in the said

N 24°33'18" W
N 2107000.952

MATCH LINE "VBSLP-RAJVDE-BC-L0-DR-S-0069


drawing.

W.C.B.
E 270879.685
W.C.B.

E 270769.713

W.C.B.
N 2107003.750 N 2106951.995

00

W.C.B.
708
50

E2
708

N2
107
E2

0 00
N2 E
106
9 50
E

Remove extra
lines.

F F

Founding Level/
G PILECAP SETTING OUT PLAN Pile termination
level missing also it
G

SC. 1 : 300 should be included


FOUNDATION SETTING-OUT DATA-68 in the Pile Concrete
dimension /General
PIER S.O.P PILE CUT SOCKET LENGTH (m) legends only
arrangement
PILE pertaining to the
W.C.B. OFF PILE LENGTH Pile_Casing_ PILE DIA. PILE CAP drawing.
PIER / ABUT. STATION IN WEATHERED IN SOUND E.G.L REINF. drawing shall be
EASTING NORTHING DEGREES LEVEL (m) (m) Length (m) (m) TYPE
ROCK ROCK TYPE LEGEND : mentioned.
(MSL)
℄ ABUT. "B3A2" 0+664.104 270878.989 2106998.635 N 27°47'48" W 0.875 16.5 4.0 1.0 6.50 5.0 1.2 BP2 ABUTMENT SC. SCALE H
H
STA. STATION
C.J. CONSTRUCTION JOINT
E.J. EXPANSION JOINT
F.G.L. FINISHED GROUND LEVEL
Sign & Stamp of Proof E.G.L. EXISTING GROUND LEVEL
& Safety consultant are F.R.L. FINISHED ROAD LEVEL
Presentation of missing T.P. TANGENT POINT
levels is not correct. Reference of the
level w.r.t datum / LIGHTING POLE
I should be either
"+" or "-" w.r.t MSL MSL is not clear. GULLY

I Highlight the SIGN GANTRY I


structure under
consideration 0 3000 6000 9000
N

L PI ER
C
"B114"
STA .
0+428.510

3 72 50
N

C
L
PI
" B ER
11
0 +46
5"
S TA.
5 .76
0
SCALE 1:300 @ A1
50 4 14 68
3 72
NT 68
4 14
PI ER3" A LIG
NME
L TA . 6 0 C
C" B11 S 91.2 LI NE DECK
3 N G
0+ G D
MAIALON
URE
ALON
D
URE MEAS
MEAS L
0+
00

N
0

RAMP 4
R
700

" . 74
372 PIE 02 A
ST 4.6
0

7 E.J. 414 50 L
C" B1 03
0+
0+0

68
3 920 0+
7 97
00

0+ 400
ER 9
PI 08"STA. . 62
L
C"B4 767
0+
0
500

3 27 97
DE CK C
27 97
3LONG
D A

MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LTD.


ASURE
ME " 0
9

80 8
.61

L 014
0

58 58
700
ST 201 R
50

007

C-0
"

. 0+ "

"
C"B PIE

E - 59
"

09
0+

0
LIN -DR 008
08

H
00

TC C-0 C
00
1 09

-L3 -
A
- C-

109 MA BC E
- C-

LIN -DR
00

00
00 E- H
J. 327 AJVD TC -L3
7

-DR

500 00
79

E. 0 -R MA BC
LIN -DR

500 97 E-
32

K C 25 SLP
T
-L3
MA BC LIN E

37 AJVD
-L3
E

DEC "VB
-R
4 250 9

MEN
4 408

G
R AJV MA T BC

IGN SLP
D E- H
ENT

AL
H

A LON "VB
0

D E-

4
TC
L
IGNM

P
C" B1 50

R ED

AUTHORITY
C

556 00
R AJV
PIE 16" A . 10
K

RAM
563

ER
DEC

42

PI 07" . 62 9 ASU
AL

ER
PI 3" A . 62
0+

L STA . ME NG
ST 3.0

LP-

L
NE

L 10 ST 4.2
LP-

C"B4 717 ALO


ONG

C"B 09
LI

0+
" VBS

R ED

Bandra Worli Sea Link Project Office, Mumbai, India


0+
" VBS
N
AL

ASU
MAI
R ED

ME

..
ONG
ASU

N
10
AL
ME

54 .
.0
" B1PI ER

A
R ED

0+3 S T"
L

12
"
0 14

700
ASU

5 000
L
C

0
C- 0

ME

4 083

E.J
5 000

00
.

02
MA TC -L3 -DR- MA BC -L3 -DR-

600
3 2797

608
3 7250

00
C- 0TC H LINE

0+
500 00 7 00 0+1
500 00 R " . 61
PIE 02 STA 3.2
"
0 13

C-0015"

0+

L
0+
C-0008"

C" B2 06
AJVDE-

00

9 50
08

0+
0

PI ER4" .
0
3

L TA 6 4
L

C" B10 S 55.0


C" B11 S 45.5

ER
PI 06" . 9
0+316.760

PI 7"

MA TC C -L3-DR-

1
LP-R

L STA . 62 0+
ER

E.J

C -L3-DR-
0+5

"B4
STA .

C 667
H LINE

H LINE
"B111"
L PI ER

0+
" VBS

TA. 1 0

AJVDE-B H LINE

95
00
0
BC

N
50
C

500
MA TC
AJVDE-B
AJVDE-

57

5TH Floor,Tower -B , Surinder Jakhar Bhavan


5 0017

00
LP-R

"VBSLP-R

"VBSLP-R
" VBS

0+ 30 0
5 000

"
500

014

AUTHORITY
0 00
-
C-0
" 60
E
327 50
372

LIN -DR 015


00 0 H
TC -L3 C-0
L
97

C" B11

0 MA BC E -
500 LIN -DR ER
PI 5" .
PI 8"

L
500 E- H 1
ER

Louis Berger
AJVD TC -L3 L STA 0

(IFFCO), Plot No.3,Sector-32,Gurgaon,


0+5

K C T -R MA BC C" B10 26 .0
S TA. 2

DEC SLP E- 0+0 .


95.5

MEN E.J
G "VB AJVD PI ER .
ER IGN -R 5" STA 5 9
PI 05"STA. 62 9

B
AL
. A LON SLP 00 " B10 25
.2
7

L 4
C"B4 617 P "VB 50 0+0 R . 86
R ED
0+ RAM PIE 3" STA 7.1
ASU L 20
ME NG C"B 03
E.J.

ENGINEER
L ALO 0+
L
C" B
PI ER "

R ED
1 10STA . 1 0
0 +279

ASU 00 00
6 00 6 48
0+6

50
" VBS L P-
" VBS

0+ 190
ME 60
00
360 88
.5

- 0+0
L P R AJVD

Haryana 122001 India


N
408

L
5 000

00
C PIE
-

"B1
00
R

L ABUT 09"R ER
N
0

L PI
0 +300
AJVD

06 " .
500

C"B4A1"
STA . 0 +2 STA " B1 S TA
C
MA

9
MA

86 .64
E-B

0+371.275 38 .
E-B

0 +0
TCHC LIN
TCHC -L

L PI ER . 622
470 00

"B401"
C
STA PI ER 00
03

. L 4 04 " TA .
LIN

0+6
475

500 82
-L E R-

S 7

J
0+419.978 C"B .64
500

489
00
5 68
3-D
E R-

L PI ER
3-D

0+
4 994

J
"B402"
00

STA .
ME ASURE D L PI ER
0+469.978
A LONG DE CK C
" B1 08 L PI ER
3

L PI ER
C-0 012

L
C-0

C " " B107"


C
ME ASURE D
ALONG RA MP
C"B403"
STA . S STA .
48800 0 +1 TA . 3
013

4 AL IGNME 0+519.732 700


NT 48703 93 .88 0+147.31 00
7 6 00 0
"

64
"

K 6 06
5 00 00 DE C C
LONG
5 00 00 40 D A NT
4 4 0 00 A LIGNME
ME ASURE
5 00

0+400 E.J. 7 35 LI NE
L
C

MAI N
" B11

5 00 00 5 00 00 L
0

PI 9"

4 89 15 D ALONG
ER

49754
0+6

ME ASURE
9
4.18
S TA. 0

0 +08S TA.
5 00 0

"B2PI ER
45.5

04"

44000
0+500

RELIANCE ASTALDI-JV
E.J. 46574 E.J.
CL
0
5 00 0

00
0+ 10 50
" VBS
5000

0
0+

" VBS
10

LP-
0

LP-

R AJV MA T BC
R AJV

00
50

EPC
MA BC LIN E DR
D E- H L3-
00
05

D E-

TC
4 75
4 70

H L3-
LIN
-
-

"

Reliance Center Sanatacruz East


008 "
DR

C-0 007
-

E -
500

C-0
C-

LIN -DR
E -
C-

H LIN -DR
00

TC -L3

ASTALDl
00

H
00

MA BC TC -L3
10

E-
MA BC
11

"

AJVD E-
"

-R AJVD
SLP - R

CONTRACTOR
"VB SLP
"VB
4
31.19

Mumbai Maharashtra - 400055


0 +1S TA.
05 "

0
C"B2PI ER
L

7 00
C" B12 S 95.5

" VBS

L ABUT
PI 0"

" VBS

C"B3A2"
ER

STA .
0+6

L
LP-

0+664.282
LP-
TA. 0 0

R AJV

ME ASURED
A LONG DE
L CK L PI ER
R AJV

C
MA BC

C
D E-

ME ASURED "B311"
STA . N
ALONG RA 00
MA BC

TC
D E-

MP 3 AL IGNME 58800 0+605.507


NT 50
H L3-
TC

58775
L PI ER
H L3-

LIN
-

C
"B310"
LIN

STA
-

6 00 00 .
4 75 00

0+545.503
4 70 54
E

DR

6 00 04
DR

L PI ER
00
N
0+7

C-
00

C
"B309" 50
C-
0+7

00

60000
00

STA .
11
00

60015 0+485.488
"
07

L PI ER N
C
"

"B308"
STA .
5 00 0

0+ 70 0
E.J. 6 00 00 0+425.473 L PI ER
500

6 00 15 C
"B307"

DAR AL-HANDASAH CONSULTANTS


ME ASURED
00

A LONG DE STA .
" VBS

L CK
C 0+365.459 L PI ER
5 00 0

" VBS

0+ 60 0 ME ASURED
ALONG RA C"B306"
LP-

MP 3 AL IGNME 6 00 00
NT STA .
LP-

6 00 15
R AJV MAE- BC

0+305.444 L PI ER
60000
R AJV

C
5 00 0

ME ASURED "B305"
MA BC
D E- TC H -L3-

60015 A LONG DE
L CK STA .
TC
D

C 0+245.441 L PI ER
ME ASURED
H L3-

0+ 50 0 ALONG RA 60000 C
"B304"
MP 3 AL IGNME
LIN
-

NT 60003 STA .
LIN

0+185.441
0+178.248

6 00 00
E DR -
DR

L PI
C" B12 S 45.5

6 00 00
5000

- C-

STA .

C ER
" B303
PI 1"

"B206"

"
ER

L PI ER

E.J.
0+7

DESIGNER
C-
-L3-DR- C-0003"

00
-L3-DR- C-0004"

S TA
0+ 400 7000

Verdum Street, Dar A1-Handasah Bldg. P.O. Box: 11-7159,


0 +1 .
07"
5000

00

TA. 0 0

35 .785
C
06"

00
5000

0+ 300 50
MA TC H LINE

"VBSLP-R AJVDE-BCH LINE


"VBSLP-R AJVDE-BC

-L3-DR- C-0005"
-L3-DR- C-0004"
MA TC

RAMP 3
0+ 200 00
50
E.J.
0+ 20 0
7 00

Beirut 1107 2230, Lebanon


MA TC H LINE

0
MA TC H LINE

47500
47059
-L3-DR- C-0005"

5 00 00
-L3-DR- C-0006"
"VBSLP-R AJVDE-BC
"VBSLP-R AJVDE-BC

N
500

4 96 56
00
"VBSLP-R AJVDE-BCH LINE

"VBSLP-R AJVDE-BCH LINE

0
5 0000 10
4 9660
0+
MA TC

MA TC

7 00

07
0+225.3
STA .
0

L
C" B12

"B207"
PI 2"

L PI ER
ER
0+7

S TA. 0

C
95.5

L
C
7 00 0
" B3PI ER
02
0

0+0 S T"

9th Floor,Infinity Tower - "C", DLF Cyber City,


A
86. .

PROOF
12
LAND P ILES MARINE PILES 5 500
496
5 00
00
0
64
00 0+8

Bandra Connector
0+8 00

500
E.
J.

00

4 70 58
4 75 00

E.
J.

CONSULTANT DLF Phase II, Gurugram, Haryana , India, Pin 122002


L
C" B3

PIE 01"STA
R
0+
03

. 61
6.4

5
72 .36
C" B2 08 STA .
0 +2
"
ER
L PI
E.
E.J.
J.
00
0+0

AlmondzGlobal Infra-Consultant Limited (AGICL)


L
C" B12 S 45.5

SAFETY
PI 3"
ER

300
0+8

0+
TA. 0 0

(A Wholly Owned Subsidiary of Almondz Global Securities (AGSL)


CONSULTANT
C

the infrastructure specialist


L
0 +9
"10
PI 0"
S TA.5 .0
24

ER
0
0+3

F- 33/3,Okhla Industrial Area, Phase-II, New Delhi -20


0

K K
VI AD
MA UCT
00

IN
0+9
0+9
00

DAR AL-HANDASAH CONSULTANTS


ARCHITECT Verdun Street, Dar A1-Handasah Bldg. P.O. Box: 11-7159,
Beirut 1107 2230, Lebanon
1+0
00
1+0
00

PROJECT NAME VERSOVA BANDRA SEA LINK (VBSL) MUMBAI

DRAWING BANDARA CONNECTOR


TITLE PILE AND PILECAP SETTING OUT PLAN SH. 1/13
Seal of RAJV Design CONSULTANT DRAWING NO IN18036-0100D- EX- BC-FD- BR- 0062 REV. 00

L
KEY PLAN director is missing DRAWN :

APPROVED :
H.F. CHECKED : A.BARAKA SCALE: As indicated METHOD OF
PROJECTION L
G.H. REVIEWED : A.B. DATE : 07-08-2019
SC. 1 : 5000 HKG
DESIGN
APPROVED ISSUE G.H. A.BARAKA H.F. 00 07-08-2019
DRAWING NO. STATUS REV.
NATURE OF REVISION & DESCRIPTION APPROVED CHECKED DRAWN REV. DATE
DIRECTOR VBSLP-RAJVDE-BC-L0-DR-C-0068 S4 00
REVIEWED BY RELIANCE -ASTALDI JV REVIEWED BY DAR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
REV- 00 VBSLP-RAJVDE-BC-L1-DR-S-0104 NO. 3 4 5 6 7 8 9 10 11 12 13 14 15 16
DWG.

Wearing coat Total Deck Width Position of


thickness missing. missing Pocket for approach slab is
A S.O.L DECK expansion joint not not correct. Kindly A
BC-RAMP 3 Cross Slope of B ℄ ABUT. "B3A2" Crash barrier
Reference level for ALIGNMENT -------
0104 shown in Dirt wall STA. 664.104 provide as per
deck Missing
PGL marking is as well as in deck Standards.
slab CAST-IN-SITU NOTES:-
incorrect.
PARAPET
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS WITH
1500 3250 4750 RESPECT TO MEAN SEA LEVEL UNLESS NOTED OTHERWISE.
Incorrect 150mm thick PCC
representation of below approach 2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
3251
4751
Anti-crash barrier slab missing. VBSLP-RAJVDE-CR- HIGHWAY DRAWINGS No. VBSLP-RAJVDE-CR-L3-DR-C-0019 TO
1500 100
L3-DR-C-0022 VBSLP-RAJVDE-CR-L3-DR-C-0024 AND ELECTRICAL DRAWINGS
10.689 10.717
B FRL 10.689 VBSLP-RAJVDE-EL-L3-DR-E-0041 TO VBSLP-RAJVDE-EL-L3-DR-E-0043. B
10.452 P.G.L. 10.582
Missing
3. FOR PILE REFER TO DRAWINGS No. VBSLP-RAJVDE-BC-L0-DR-S-0112.
Filter Media

50

50
50
missing 4. FOR ABUTMENT SECTIONS REFER TO DWG No. VBSLP-RAJVDE-BC-L1-
DR-S-0106.

5.PLINTH DIMENSIONS TO BE VERIFIED WITH BEARING DIMS.


APRON SLAB
6. FOR CRASH BARRIER DETAILS REFER TO DWG No. VBSLP-RAJVDE-
Projections of CC-00-DR-S-0020 .
bracket for
approach slab Wing wall
3450

C 300 Cross Slope of Add Notes for: C


missing requirement as per
1500 abutment cap soil slope of 1:1.5 1) Materials used. Concrete, steel, PCC etc.
1500
Missing shall be satisfied 2) Back filling details and materials as per IRC 78.
WING WALL 3) Filter media details and specifications.
If retaining wall 4) Weep Holes details and specifications.
provided beyond

500
wing wall, the
Levels are not 6.910 Weep holes details and
correct w.r.t the 6.687 missing. presentations are

1000
P&P Drawing 1418 1581 810 500 missing. Nomenclature of
D Weep holes components missing. Like D
missing. mark Abutment stem,
Abutment Cap, Dirtwall,

660
NGL Missing curtain wall, return wall,
N.G.L. N.G.L.
pilecap, anti-crash barrier,
approach slab...etc..

4750 4750 650 650

Add Legends E
700 700 COAL TAR
E EPOXY COATING
COAL TAR
EPOXY COATING
1300 3200
2.600

Dimensions of Pile
Dimensions of Pile
cap missing.
cap missing.

1800
F F

Change to "80mm
Change to "80mm
80mm BLINDING CONCRETE Leveling Coarse"
80mm BLINDING CONCRETE Leveling Course"

PILE TYPE PILE TYPE


"BP2" "BP2"

G Pile dimensions G
SECTION A VIEW B and spacings are
A 1 : 50
Pile dimensions
and spacings are
B 1 : 50
missing.

missing.

Kindly explain the


purpose of this box
BC-RAMP 3
ALIGNMENT
H H
BC-RAMP 3
ALIGNMENT
10.345 10.582
INCREASING STA.

Start of curve and


20 20
DIRECTION OF

its distance from

4000
INCREASING STA.
the abutment shaft Dirtwall details
missing.

DIRECTION OF
shall be mentioned.
700 700 700
3850

3040

R 310000
I S.O.P. S.O.P. I
Overlapping texts. LIFTING POINTS
STA. 0+664.104 TYP.
R 300500 E 270878.989 It seems drawing
N 2106998.635 not reviewed prior

300
20
to submission.

500
10.452 10.689
650

600 MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LTD.


600 AUTHORITY
1 A
1300

7700

S.O.L ABUT "B3A2" Bandra Worli Sea Link Project Office, Mumbai, India
..
810
0047 -----
0104 W.C.B. N 27°47'48" W
5TH Floor,Tower -B , Surinder Jakhar Bhavan
1460
650

A
1300

℄ BEARINGS AUTHORITY

600
S.O.L ABUT "B3A2" L
B Louis Berger (IFFCO), Plot No.3,Sector-32,Gurgaon,
-------
0104 ENGINEER
W.C.B. N 27°47'48" W Haryana 122001 India
650

J J
580 ℄ BEARINGS RELIANCE ASTALDI-JV
9500 EPC Reliance Center Sanatacruz East
CONTRACTOR ASTALDl
Mumbai Maharashtra - 400055
300 3033 1417 1582 2868 300 DAR AL-HANDASAH CONSULTANTS
Details of Pile, DESIGNER Verdum Street, Dar A1-Handasah Bldg. P.O. Box: 11-7159,
Beirut 1107 2230, Lebanon
spacing and 4750 4750
dimensions are PROOF 9th Floor,Infinity Tower - "C", DLF Cyber City,
CONSULTANT DLF Phase II, Gurugram, Haryana , India, Pin 122002
missing. 9500
AlmondzGlobal Infra-Consultant Limited (AGICL)
SAFETY
(A Wholly Owned Subsidiary of Almondz Global Securities (AGSL)
CONSULTANT the infrastructure specialist
F- 33/3,Okhla Industrial Area, Phase-II, New Delhi -20
K K
DAR AL-HANDASAH CONSULTANTS
ARCHITECT Verdun Street, Dar A1-Handasah Bldg. P.O. Box: 11-7159,
Beirut 1107 2230, Lebanon

PROJECT NAME VERSOVA BANDRA SEA LINK (VBSL) MUMBAI

DRAWING BANDARA CONNECTOR


TITLE ABUTMENT "B3A2" G.A. DETAILS
Dimension of

L
pilecap missing in TOP PLAN CONSULTANT DRAWING NO IN18036-0100D- EX- BC-FD- BR- 0098

DRAWN : M.F. CHECKED : A.BARAKA SCALE: 1 : 50


REV. 00

the drawing.
FOUNDATION PLAN SC. 1 : 50
HKG APPROVED ISSUE G.H. A.BARAKA M.F. 00 07-08-2019
APPROVED : G.H. REVIEWED : A.B. DATE : 07-08-2019
METHOD OF
PROJECTION L

DRAWING NO.
SC. 1 : 50 DESIGN
NATURE OF REVISION & DESCRIPTION APPROVED CHECKED DRAWN REV. DATE
STATUS REV.
DIRECTOR VBSLP-RAJVDE-BC-L1-DR-S-0104 S4 00
REVIEWED BY RELIANCE -ASTALDI JV REVIEWED BY DAR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like