Professional Documents
Culture Documents
Guruvayur Railway Over Bridge
Guruvayur Railway Over Bridge
116 HECTARES) OF
MORE LAND APART FROM EXISTING ROAD IN BLOCK 23 OF GURUVAYUR MUNCIPALITY BELONGING TO
32 SURVEY . LAND FROM 26 LAND HOLDINGS ARE REQUIRED.WITH THE COMPLETION OF .5 KM LONG
AND 9.5 M WIDE PROJECT THE PRESENT LEVEL CROSS CEASES TO BE IN EXISTENCE AND TRAFFIC
OBSTRUCTION IS SOLVED.THE ROADS AND BRIDGES DEVELOPMENT CORPORATION IS RESPONSIBLE FOR
THE MASTER PLAN FOR RAILWAY OVER BIDGE AT GURUVAYUR. THE ESTIMATED COST OF THE OVER
BRIDGE IS RS21.5 CRORE.