Living Room/ Dining Room/Family Area/Kitchen/Office/Maids Room/Guest Room Superimposed Deadload
Super Imposed
Components
Deadload
Ceiling Parking Superimposed
Gypsum board (per mm thickness) 0.008kPa Deadload
Suspended steel channel 0.10kPa
Super Imposed
Covering Components
Deadload
Gypsum
Coveringsheating,13mm 0.10kPa
Floor Fill sheating,13mm
Gypsum 0.10kPa
Cinder concrete per mm
Floor Fill 0.017kPa
Floor andconcrete
Cinder Floor Finishes
per mm 0.017kPa
Concrete
Floor andfillFloor
finishFinishes 0.023kPa
Ceramic
Concrete tilefillonfinish
25mm mortar bed 1.10kPa
0.023kPa
Frame Partitions
Frame Partitions
Steel
Steelstuds,
studs,13mm 13mmgypsum
gypsumboard
boardeach
eachside
side 0.38kPa
0.38kPa
Frame Walls
Concrete Masonry Units
Windows,
Unplastered glass, frame and sash 0.38kPa
0.24kPa
Concrete Masonry Units
Total Super Imposed Deadload = 0.760kPa
Unplastered 0.24kPa
Total Super Imposed Deadload = 2.348kPa
Laundry Superimposed Deadload
Super Imposed
Components
Deadload
Ceiling
Gypsum board (per mm thickness) 0.008kPa
Suspended steel channel 0.10kPa
Covering
Gypsum sheating,13mm 0.10kPa
Floor Fill
Cinder concrete per mm 0.017kPa
Floor and Floor Finishes
Concrete fill finish 0.023kPa
Ceramic tile on 25mm mortar bed 1.10kPa
Concrete Masonry Units
Unplastered 0.24kPa
Total Super Imposed Deadload = 1.588kPa
*DEADLOAD OF COLUMNS
Deadload of Column = Unit weight of Concrete x Volume of Column
Volume of Column = Area of Column x Length of Column x No. of Column
Volume of Column = 0.2m x 0.4m x 1.5m x 17
Volume of Column = 2.04m3
*DEADLOAD OF FLOOR
Deadload of Floor = Unit weight of Concrete x Volume of Floor
Volume of Floor = Thickness of Floor x Floor Area of Floor
Floor Area of Floor = Total Floor Area – Area of Stair – Area of Columns
Total Floor Area = (13m x 3.2m) + (12m x 7.8m)
Total Floor Area = 135.2m2
Area of Stair = 1.85m x 2.38m
Area of Stair = 4.403m2
Area of Columns = 0.2m x 0.4m x 17
Area of Columns = 1.36m2
Floor Area of Floor = 135.2m2 - 4.403m2 - 1.36m2
Floor Area of Floor = 129.437m2
Volume of Floor = 129.437m2 x 0.15m
Volume of Floor = 19.4156m3
*Components
Master Bedroom Superimposed Deadload
Super Imposed
Components
Deadload
Ceiling Bedrooms Superimposed
Gypsum board (per mm thickness) 0.008kPa Deadload
Suspended steel channel 0.10kPa
Super Imposed
Covering Components
Deadload
Gypsum
Ceiling sheating,13mm 0.10kPa
Floor Fill board (per mm thickness)
Gypsum 0.008kPa
Cinder concrete
Suspended steelperchannel
mm 0.017kPa
0.10kPa
Floor and
Covering Floor Finishes
Concrete
Gypsumfill finish
sheating,13mm 0.023kPa
0.10kPa
Ceramic tile
Floor Fill on 25mm mortar bed 1.10kPa
Frame
CinderPartitions
concrete per mm 0.017kPa
Steel studs, 13mm
Floor and Floor Finishes gypsum board each side 0.38kPa
Movable
Concretepartitions
fill finish 0.24kPa
0.023kPa
Frame Walls
Ceramic tile on 25mm mortar bed 1.10kPa
Windows, glass,
Frame Partitions frame and sash 0.38kPa
Concrete
MovableMasonry
partitionsUnits 0.24kPa
Unplastered
Frame Walls 0.24kPa
Windows, glass, Total Super
frame andImposed
sash Deadload = 2.588kPa 0.38kPa
Concrete Masonry Units
Unplastered 0.24kPa
Total Super Imposed Deadload = 2.208kPa
*DEADLOAD OF COLUMNS
Deadload of Column = Unit weight of Concrete x Volume of Column
Volume of Column = Area of Column x Length of Column x No. of Column
Volume of Column = 0.2m x 0.4m x 2.85m x 17
Volume of Column = 3.876m3Gy
*DEADLOAD OF BEAMS
Deadload of Beams = Unit weight of Concrete x Total Volume of Beams
Total Volume of Beams = Area of Beams x Length of Beams
Designation Area Length Volume
B-1 0.2m x 0.4m 4.81m 0.3848 m3
B-2 0.2m x 0.4m 3.50m 0.2800 m3
B-3 0.2m x 0.4m 2.29m 0.1832 m3
B-4 0.2m x 0.4m 3.70m 0.2960 m3
B-5 0.2m x 0.4m 3.70m 0.2960 m3
B-6 0.2m x 0.4m 3.70m 0.2960 m3
B-7 0.2m x 0.4m 3.70m 0.2960 m3
B-8 0.2m x 0.4m 3.70m 0.2960 m3
B-9 0.2m x 0.4m 4.81m 0.3848 m3
B-10 0.2m x 0.4m 3.50m 0.2800 m3
B-11 0.2m x 0.4m 2.29m 0.1832 m3
B-12 0.2m x 0.4m 3.30m 0.2640 m3
B-13 0.2m x 0.4m 3.30m 0.2640 m3
B-14 0.2m x 0.4m 3.30m 0.2640 m3
B-15 0.2m x 0.4m 3.30m 0.2640 m3
B-16 0.2m x 0.4m 3.11m 0.2488 m3
B-17 0.2m x 0.4m 3.09m 0.2472 m3
B-18 0.2m x 0.4m 4.58m 0.3664 m3
B-19 0.2m x 0.4m 0.80m 0.0640 m3
B-20 0.2m x 0.4m 2.60m 0.2080 m3
B-21 0.2m x 0.4m 2.60m 0.2080 m3
B-22 0.2m x 0.4m 2.60m 0.2080 m3
B-23 0.2m x 0.4m 2.60m 0.2080 m3
B-24 0.2m x 0.4m 3.11m 0.2488 m3
B-25 0.2m x 0.4m 3.09m 0.2472 m3
B-26 0.2m x 0.4m 5.80m 0.4640m3
TOTAL VOLUME = 6.9504m3
3 3
Deadload of Beam = 23.6 KN/m x 6.9504m
Deadload of Beam = 164.0294KN
*DEADLOAD OF SLABS
Deadload of Slab = Unit weight of Concrete x Volume of Slab
Volume of Slab = Thickness of Slab x Floor Area of Slab
Floor Area of Slab = Total Floor Area – Area of Stair – Area of Columns
Total Floor Area = (13m x 3.2m) + (12m x 7.8m)
Total Floor Area = 135.2m2
Area of Stair = 1.85m x 2.38m
Area of Stair = 4.403m2
Area of Columns = 0.2m x 0.4m x 17
Area of Columns = 1.36m2
Floor Area of Slab = 135.2m2 - 4.403m2 - 1.36m2
Floor Area of Slab = 129.437m2
Volume of Slab = 129.437m2 x 0.15m
Volume of Slab = 19.4156m3
*Components
Theater Room and Living Room Superimposed Deadload
Super Imposed
Components
Deadload
Ceiling
Gypsum board (per mm thickness) 0.008kPa
Suspended steel channel 0.10kPa
Covering
Gypsum sheating,13mm 0.10kPa
Floor Fill
Cinder concrete per mm 0.017kPa
Floor and Floor Finishes
Concrete fill finish 0.023kPa
Ceramic tile on 25mm mortar bed 1.10kPa
Frame Partitions
Steel studs, 13mm gypsum board each side 0.38kPa
Frame Walls
Windows, glass, frame and sash 0.38kPa
Concrete Masonry Units
Unplastered 0.24kPa
Total Super Imposed Deadload = 2.348kPa
Super Imposed
Components Storage Room and Dance
Deadload
Ceiling Studio Superimposed
Gypsum board (per mm thickness) 0.008kPa Deadload
Suspended steel channel 0.10kPa
Covering
Gypsum sheating,13mm 0.10kPa
Floor Fill
Cinder concrete per mm 0.017kPa
Floor and Floor Finishes
Concrete fill finish 0.023kPa
Ceramic tile on 25mm mortar bed 1.10kPa
Frame Walls
Windows, glass, frame and sash 0.38kPa
Concrete Masonry Units
Unplastered 0.24kPa
Total Super Imposed Deadload = 1.968kPa
Balcony Superimposed Deadload
Super Imposed
Components
Deadload
Ceiling
Gypsum board (per mm thickness) 0.008kPa
Suspended steel channel 0.10kPa
Covering
Gypsum sheating,13mm 0.10kPa
Floor Fill
Cinder concrete per mm 0.017kPa
Floor and Floor Finishes
Concrete fill finish 0.023kPa
Ceramic tile on 25mm mortar bed 1.10kPa
Frame Walls
Windows, glass, frame and sash 0.38kPa
Concrete Masonry Units
Unplastered 0.24kPa
Total Super Imposed Deadload = 1.953kPa
*DEADLOAD OF COLUMNS
Deadload of Column = Unit weight of Concrete x Volume of Column
Volume of Column = Area of Column x Length of Column x No. of Column
Volume of Column = 0.2m x 0.4m x 2.7m x 17
Volume of Column = 3.672m3
*DEADLOAD OF BEAMS
Deadload of Beams = Unit weight of Concrete x Total Volume of Beams
Total Volume of Beams = Area of Beams x Length of Beams
Designation Area Length Volume
B-1 0.2m x 0.4m 4.81m 0.3848 m3
B-2 0.2m x 0.4m 3.50m 0.2800 m3
B-3 0.2m x 0.4m 2.29m 0.1832 m3
B-4 0.2m x 0.4m 3.70m 0.2960 m3
B-5 0.2m x 0.4m 3.70m 0.2960 m3
B-6 0.2m x 0.4m 3.70m 0.2960 m3
B-7 0.2m x 0.4m 3.70m 0.2960 m3
B-8 0.2m x 0.4m 3.70m 0.2960 m3
B-9 0.2m x 0.4m 4.81m 0.3848 m3
B-10 0.2m x 0.4m 3.50m 0.2800 m3
B-11 0.2m x 0.4m 2.29m 0.1832 m3
B-12 0.2m x 0.4m 3.30m 0.2640 m3
B-13 0.2m x 0.4m 3.30m 0.2640 m3
B-14 0.2m x 0.4m 3.30m 0.2640 m3
B-15 0.2m x 0.4m 3.30m 0.2640 m3
B-16 0.2m x 0.4m 3.11m 0.2488 m3
B-17 0.2m x 0.4m 3.09m 0.2472 m3
B-18 0.2m x 0.4m 4.58m 0.3664 m3
B-19 0.2m x 0.4m 0.80m 0.0640 m3
B-20 0.2m x 0.4m 2.60m 0.2080 m3
B-21 0.2m x 0.4m 2.60m 0.2080 m3
B-22 0.2m x 0.4m 2.60m 0.2080 m3
B-23 0.2m x 0.4m 2.60m 0.2080 m3
B-24 0.2m x 0.4m 3.11m 0.2488 m3
B-25 0.2m x 0.4m 3.09m 0.2472 m3
B-26 0.2m x 0.4m 5.80m 0.4640m3
TOTAL VOLUME = 6.9504m3
Deadload of Beam = 23.6 KN/m3 x 6.9504m3
Deadload of Beam = 164.0294KN
*DEADLOAD OF SLABS
Deadload of Slab = Unit weight of Concrete x Volume of Slab
Volume of Slab = Thickness of Slab x Floor Area of Slab
Floor Area of Slab = Total Floor Area – Area of Stair – Area of Columns
Total Floor Area = (13m x 3.2m) + (12m x 7.8m)
Total Floor Area = 135.2m2
Area of Stair = 1.85m x 2.38m
Area of Stair = 4.403m2
Area of Columns = 0.2m x 0.4m x 17
Area of Columns = 1.36m2
Floor Area of Slab = 135.2m2 - 4.403m2 - 1.36m2
Floor Area of Slab = 129.437m2
Volume of Slab = 129.437m2 x 0.15m
Volume of Slab = 19.4156m3
*Roof 1
Assigned Area Length Qty Volume
1 0.1524m x 0.0095m 3.50m 2 0.0102m3
1 0.1524m x 0.0095m 3.83m 2 0.0111m3
2 0.1016m x 0.0095m 1.55m 1 0.0015m3
3 0.1016m x 0.0032m 1.16m 2 0.0008m3
3 0.1016m x 0.0032m 1.24m 2 0.0008m3
3 0.1016m x 0.0032m 1.42m 2 0.0009m3
4 0.1016m x 0.0064m 0.33m 2 0.0004m3
4 0.1016m x 0.0064m 0.62m 2 0.0008m3
4 0.1016m x 0.0064m 0.77m 2 0.0010m3
4 0.1016m x 0.0064m 0.93m 2 0.0012m3
4 0.1016m x 0.0064m 0.94m 2 0.0012m3
Total Volume = 0.0284m3
No. of Trusses = 4
*Roof 2
Assigned Area Length Qty Volume
1 0.1524m x 0.0095m 6.00m 2 0.0174m3
1 0.1524m x 0.0095m 6.50m 2 0.0189m3
2 0.1016m x 0.0095m 2.50m 1 0.0024m3
3 0.1016m x 0.0032m 1.92m 2 0.0012m3
3 0.1016m x 0.0032m 2.00m 2 0.0013m3
3 0.1016m x 0.0032m 2.33m 2 0.0015m3
4 0.1016m x 0.0064m 0.50m 2 0.0007m3
4 0.1016m x 0.0064m 1.00m 2 0.0013m3
4 0.1016m x 0.0064m 1.30m 2 0.0017m3
4 0.1016m x 0.0064m 1.50m 2 0.0020m3
4 0.1016m x 0.0064m 1.56m 2 0.0021m3
Total Volume = 0.0694m3
No. of Trusses = 9
ADDITIONAL DEADLOAD
*DEADLOAD OF COLUMNS
Deadload of Column = Unit weight of Concrete x Volume of Column
Volume of Column = Area of Column x Length of Column x No. of Column
Volume of Column = 0.2m x 0.4m x 1.35 x 17
Volume of Column = 3.876m3
Parameters:
Standard Occupancy Structure, I = 1.00
Zone 4 = 0.4
Soil Type = Sc
Seismic Source Type = C
Na = 1.0
Nv = 1.0
Ca (0.40Na) = 0.40
Cv (0.56Nv) = 0.56
R (SMRF) = 8.5
Summary of Deadload
LEVEL DEADLOAD
Second Floor 972.2329KN
Third Floor 941.5295KN
Roof 88.9374KN
WD 2002.6998KN
T = Ct x hn3/4
Ct = 0.0731
hn = 8.4m
T = 0.0731 x 8.43/4
T = 0.3607s
V = (CvI/RT) x WD
V = (0.56 x 1.00)/(8.5 x 0.3607) x 2002.6998
V = 365.7959KN
LIMITS
V = (2.5CaI/R) x WD
V = (2.5 x 0.40 x 1.00)/8.5 x 2002.6998
V = 235.6117KN
V = (0.11CaI) x WD
V = 0.11 x 0.40 x 1 x 2002.6998
V = 88.1188KN
V = (0.8NvIZ/R) x WD
V = (0.8 x 1.00 x 1.00 x 0.4)/8.5 x 2002.6998
V = 75.3958KN
Since, V = (CvI/RT) x WD > V = (2.5CaI/R) x WD
Therefore, use V = 365.7959KN
Parameters:
Basic Wind Speed, V = 250KPH
Wind Directionality Factor = 0.85
Importance Factor = 1.0
Exposure Category = C
Topographic Factor, Kzt = 1.0
Gust Effect Factor = 0.85
Enclosure Classification = Partially Enclosed Building
Internal Pressure Coefficient, GCpi = +-0.55
External Pressure Coefficient, Cp = 0.8
α = 7
Zg = 365.17
Kz = 2.01(4.5/Zg)2/ α
Kz = 2.01(4.5/365.17)2/7
Kz = 0.5724
Kz = 2.01(Z/Zg)2/ α
Kz = 2.01(5.7/365.17)2/7
Kz = 0.6124
Kz = 2.01(Z/Zg)2/ α
Kz = 2.01(8.4/365.17)2/7
Kz = 0.6841
Velocity Pressure, qz
qz = 47.3x10-6KdKzKztV2I
For Roof
qz = 47.3x10-6(0.85)(0.6841)(1.0)(250)2(1.0)
qz = 1.7190kN/m2
For Roof
p = (1.7190)(0.85)(0.8) – (1.7190)(0.55)
p = 0.2235 kN/m2
For Roof
Windload = (0.2235) kN/m2 x 3m x 1.35m)
Windload = 0.9052kN = 905.2N