No. Sub-con Location(Plot Plan) Remarks 1 Descriptions
Target Date Status
3 CC1 Boiler #1 4-May-20 Work done Missing ITP form no.1 Work done: Đã thi công xong - chưa đóng
hồ sơ - 25/49 ~ 51%
4 CC1 Pulverizer in Boiler 1 22-Apr-20 Work Done Missing ITP form no.1
5 CC1 PAF (Primary Air Fan) - A&B in Boiler 1 15-Apr-20 Work Done Missing ITP form no.1
6 CC1 Blowdown Pit in Boiler 1 15-Apr-20 Work done Missing ITP form no.1
8 CC1 Pulverizer in Boiler 2 18-May-20 Work Done Missing ITP form no.1
9 CC1 FDF (Forced Draft Fan) - A&B in Boiler 2 11-May-20 Work done Missing ITP form no.1
10 CC1 PAF (Primary Air Fan) - A&B in Boiler 2 11-May-20 Work Done Missing ITP form no.1
11 CC1 Blowdown Pit in Boiler 2 11-May-20 Work Done Missing ITP form no.1
12 CC1 ESP unit 1 22-Apr-20 Work Done Missing ITP form no.1
13 CC1 Duct Support unit 1 (ESP 1 ~ FGD 1) 25-May-20 Work Done Missing ITP form no.1
14 CC1 Duct Support unit 2 (ESP 2 ~ FGD 2) 25-May-20 Work Done Missing ITP form no.1
15 CC1 ID Fan unit 1 15-Apr-20 Work done Missing ITP form no.1
Subcon Subcon.
No. Sub-con Location(Plot Plan) Target Date Status Remarks 1 Descriptions
16 CC1 ID Fan unit 2 11-May-20 Work done Missing ITP form no.1
17 CC1 Plant and Fire Water Storage Tank A & B 25-Mar-20 Work done Missing ITP form no.1
18 CC1 Demi. Water Storage Tank A & B 25-Mar-20 Work done Missing ITP form no.1
19 CC1 LDO Storage Tank A & B 8-Apr-20 Work done Missing ITP form no.1 - Test report
20 CC1 Portable Water Storage Tank 1-Apr-20 Work done Missing ITP form no.1 - Test report
21 CC1 Pressurized Service Water Tank 1-Apr-20 Work done Missing ITP form no.1 - Test report
22 CC1 LDO Truck Unloading Station 8-Jun-20 Work Done Not submitted yet
23 CC1 Water Treatment Building 15-Jul-20 Work done Not submitted yet
24 CC1 Pretreatment Area Pump Shelter 8-Jun-20 Work done Not submitted yet
26 CC1 Fire Fighting Pump House - Concrete work 30-May-20 Work Done Not submitted yet
27 CC1 Coal Electrical BLGD (South of Coal Area) 22-Jun-20 Work Done Not submitted yet
28 CC1 Ash Pipe Rack unit 1 Open Open: Chưa thi công xong - 22/49 ~ 45%
40 CC1 Coal Electrical BLGD (South of Coal Area) - Finishing work Open