You are on page 1of 50

NOTIFICATION FOR INSPECTION (Overall Informa

PJ. : NSRP / Zone-2 / CC1-Piling work

Inspection Sub
No. Location NFI No. ITP No.
Time Date contractor
PILING WORK

1 11/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0001 ITP-PIL-CC1-001

2 14/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0002 ITP-PIL-CC1-001

3 17/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0003 ITP-PIL-CC1-001

4 10:00~ 18/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0004 ITP-PIL-CC1-001

5 9:00~ 18/3/2014 AG00 CC1 ITP-PIL-CC1-001

6 14:00~ 18/3/2014 AG00 (AGRP003) CC1 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001

7 15:00~ 18/3/2014 AG00 (AGRP003) CC1 ITP-PIL-CC1-001

8 10:00~ 19/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0006 ITP-PIL-CC1-001

9 14:00~ 19/3/2014 AG00 (AGRP003) CC1 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001

10 15:00~ 19/3/2014 AG00 (AGRP003) CC1 ITP-PIL-CC1-001

Fecon Factory - Ha
11 07:00~ 19/3/2014 CC1 ITP-PIL-CC1-001
Nam Province

9 08:00~ 20/3/2014 AG00 (AGRP003) CC1 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001

13 07:30~ 20/3/2014 AG00 (AGRP003) CC1 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001

9 08:00~ 21/3/2014 AG00 (AGRP003) CC1 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001

14 07:30~ 21/3/2014 AG00 (AGRP003) CC1 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001

15 10:00~ 21/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0006 ITP-PIL-CC1-001

9 08:00~ 22/3/2014 AG00 (AGRP003) CC1 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001

14 07:30~ 22/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001


17 07:30~ 22/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0008 ITP-PIL-CC1-001

18 07:30~ 23/3/2014 AG00 CC1 ITP-PIL-CC1-001

19 08:00~ 23,24/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0009 ITP-PIL-CC1-001

20 08:30~ 23,24/3/2014 AG00 CC1 ITP-PIL-CC1-001

21 09:00~ 25/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0010 ITP-PIL-CC1-001

22 07:30~ 25/3/2014 AG00 CC1 ITP-PIL-CC1-001

23 08:00~ 25/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0011 ITP-PIL-CC1-001

24 08:30~ 25/3/2014 AG00 CC1 ITP-PIL-CC1-001

25 07:30~ 26/3/2014 AG00 CC1 ITP-PIL-CC1-001

26 08:00~ 26/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0012 ITP-PIL-CC1-001

27 08:30~ 26/3/2014 AG00 CC1 ITP-PIL-CC1-001

28 07:30~ 27/3/2014 Zone-2 CC1 ITP-PIL-CC1-001

29 07:30~ 27/3/2014 AG00 CC1 ITP-PIL-CC1-001

30 08:00~ 27/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0013 ITP-PIL-CC1-001

31 08:30~ 27/3/2014 AG00 CC1 ITP-PIL-CC1-001

32 09:00~ 28/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0014 ITP-PIL-CC1-001


33 07:30~ 28/3/2014 AG00 CC1 ITP-PIL-CC1-001

34 08:00~ 28/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0015 ITP-PIL-CC1-001

35 08:30~ 28/3/2014 AG00 CC1 ITP-PIL-CC1-001

36 09:00~ 29/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0016 ITP-PIL-CC1-001

37 07:30~ 29/3/2014 AG00 CC1 ITP-PIL-CC1-001

38 08:00~ 29/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-0017 ITP-PIL-CC1-001

39 08:30~ 29/3/2014 AG00 CC1 ITP-PIL-CC1-001

40 09:00~ 31/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-00018 ITP-PIL-CC1-001

41 07:30~ 30,31/3/2014 AG00 CC1 ITP-PIL-CC1-001

42 08:00~ 30,31/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-00019 ITP-PIL-CC1-001

43 08:30~ 30,31/3/2014 AG00 CC1 ITP-PIL-CC1-001

44 09:00~ 31/3/2014 AG00 CC1 NFI-PIL-CC1-Z2-00020 ITP-PIL-CC1-001

45 09:00~ 1-Apr-2014 AG00 CC1 NFI-PIL-CC1-Z2-00021 ITP-PIL-CC1-001

46 07:30~ 1-Apr-2014 AG00 CC1 ITP-PIL-CC1-001

47 08:00~ 1-Apr-2014 AG00 CC1 NFI-PIL-CC1-Z2-00022 ITP-PIL-CC1-001


48 08:30~ 1-Apr-2014 AG00 CC1 ITP-PIL-CC1-001

49 07:30~ 2-Apr-2014 AG00 CC1 ITP-PIL-CC1-001

50 08:00~ 2-Apr-2014 AG00 CC1 NFI-PIL-CC1-Z2-00023 ITP-PIL-CC1-001

51 08:30~ 2-Apr-2014 AG00 CC1 ITP-PIL-CC1-001

52 07:30~ 3-Apr-2014 AG00 CC1 NFI-PIL-CC1-Z2-0022 ITP-PIL-CC1-001

53 08:00~ 3-Apr-2014 AG00 CC1 NFI-PIL-CC1-Z2-00023 ITP-PIL-CC1-001

54 07:30~ 3-Apr-2014 AG00 CC1 ITP-PIL-CC1-001

55 08:00~ 3-Apr-2014 AG00 CC1 NFI-PIL-CC1-Z2-0024 ITP-PIL-CC1-001

56 08:30~ 3-Apr-2014 AG00 CC1 ITP-PIL-CC1-001

57 07:30~ 4/4/2014 AG00 CC1 NFI-PIL-CC1-Z2-0022 ITP-PIL-CC1-001

58 08:00~ 4/4/2014 AG00 CC1 NFI-PIL-CC1-Z2-00023 ITP-PIL-CC1-001


59 08:00~ 4/4/2014 AG00 CC1 NFI-PIL-CC1-Z2-00024 ITP-PIL-CC1-001

60 07:30~ 4/4/2014 AG00 CC1 ITP-PIL-CC1-001

61 08:00~ 4/4/2014 AG00 CC1 NFI-PIL-CC1-Z2-00025 ITP-PIL-CC1-001

62 08:30~ 4/4/2014 AG00 CC1 ITP-PIL-CC1-001

63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
FOR INSPECTION (Overall Information)
Date of Notification: 11-May-2021

Inspection Mode Inspector


Activity (Inspection Item) IPMT
JGCS IPMT Sub-con JGCS

1. Pile Material Mr. Tien Mr. Thang


W S
SPUN pile D600 for AG00 (firts time) 0903.288.616 0915.663.183
1. Pile Material Mr. Tien Mr. Thang
W S
SPUN pile D600 for AG00 (lot 02) 0903.288.616 0915.663.183
1. Pile Material Mr. Tien Mr. Thang
W S
SPUN pile D600 for AG00 (lot 03) 0903.288.616 0915.663.183
1. Pile Material Mr. Tien Mr. Thang
W S
SPUN pile D600 for AG00 (lot 04) 0903.288.616 0915.663.183
4.1 Field Survey Level Mr. Tien Mr. Thang
S S
Prior to driving, 6 piles: Pc284 -> Pc289 0903.288.616 0915.663.183
4.3 Pile Driving Mr. Tien Mr. Thang
W S
6 piles: Pc284 -> Pc289 0903.288.616 0915.663.183
5.1 Pile connection (welding) Mr. Tien Mr. Thang
IW S
6 piles: Pc284 -> Pc289 0903.288.616 0915.663.183
1. Pile Material Mr. Tien Mr. Thang
W S
SPUN pile D600 for AG00 (lot 05) 0903.288.616 0915.663.183
3.3 Pile Driving Mr. Tien Mr. Thang
W S
6 piles: Pc284 -> Pc289 0903.288.616 0915.663.183
5.1 Pile connection (welding) Mr. Tien Mr. Thang
IW S
6 piles: Pc284 -> Pc289 0903.288.616 0915.663.183
1. Pile Material Mr. Tien Mr. Thang
W S
Pile Bending Test 0903.288.616 0915.663.183

4.3 Pile Driving (5 piles) Mr. Tien Mr. Thang


W S
5 piles: Pc284 -> Pc288 0903.288.616 0915.663.183

4.3 Pile Driving (17 piles)


3 piles: Pc273->275
Mr. Tien Mr. Thang
3 piles: Pc263->264 W S
0903.288.616 0915.663.183
3 piles: Pc125->127
8 piles: Pa357->364

4.3 Pile Driving Mr. Tien Mr. Thang


W S
4 piles: Pc284->286,Pc288 0903.288.616 0915.663.183

4.3 Pile Driving (14 piles)


3 piles: Pc273->275
Mr. Tien Mr. Thang
3 piles: Pc263->264 W S
0903.288.616 0915.663.183
2 piles: Pc126,127
6 piles: Pa358,360->364
1. Pile Material Mr. Tien Mr. Thang
W S
SPUN pile D600 for AG00 (lot 05) 0903.288.616 0915.663.183
4.3 Pile Driving Mr. Tien Mr. Thang
W S
2 piles: Pc284,285 0903.288.616 0915.663.183
4.3 Pile Driving (11piles)
3 piles: Pc273->275 Mr. Tien Mr. Thang
W S
3 piles: Pc263->264 0903.288.616 0915.663.183
5 piles: Pa360->364
4.3 Pile Driving (11 piles)
3 piles: Pc122->124
Mr. Tien Mr. Thang
3 piles: 111->113 W S
0903.288.616 0915.663.183
2 piles: 284,285
3 piles: 273->27
4.1 Field Survey Level (22 piles)
10piles:Pc200->202,197->199,83,84,87,88 S S Mr. Tien Mr. Thang
12 piles: Pa591->594, 413->415, 347->351
4.3 Pile Driving (22 piles)
10piles:Pc200->202,197->199,83,84,87,88;
W S Mr. Tien Mr. Thang
12piles:Pa591->594,
413->415, 347->351
4.4 Pile connection (welding)
10piles:Pc200->202,197->199,83,84,87,88 IW S Mr. Tien Mr. Thang
12piles:Pa591->594,413->415, 347->351
1. Pile Material
W S Mr. Tien Mr. Thang
SPUN pile D600 for AG00 (lot 06)
4.1 Field Survey Level (31 piles)
Pa 245->247,595, 447->451,419->421,337-
S S Mr. Tien Mr. Thang
>341,219->223
Pc 09->12; Pd 06->10
4.3 Pile Driving (31 piles)
Pa 245->247,595, 447->451,419->421,337-
W S Mr. Tien Mr. Thang
>341,219->223
Pc 09->12; Pd 06->10
4.3 Pile Conection (31 piles)
Pa 245->247,595, 447->451,419->421,337-
IW S Mr. Tien Mr. Thang
>341,219->223
Pc 09->12; Pd 06->10
4.1 Field Survey Level (35 piles)
Pb 37->40,145; Pa583->586, 457->461,337-
S S Mr. Tien Mr. Thang
>341,151->153,157->159
Pd 09,10; Pc 69->72, 78
4.3 Pile Driving (35 piles)
Pb 37->40,145; Pa583->586, 457->461,337-
W S Mr. Tien Mr. Thang
>341,151->153,157->159
Pd 09,10; Pc 69->72, 78
4.3 Pile Conection (35 piles)
Pb 37->40,145; Pa583->586, 457->461,337-
IW S Mr. Tien Mr. Thang
>341,151->153,157->159
Pd 09,10; Pc 69->72, 78
Inspection system Temporary Bench Mark
Mr. Tien Mr. Thang
at the site
4.1 Field Survey Level (37 piles)
Pb45-49, 55->59, 145->148; Pa 464->469,
S S Mr. Tien Mr. Thang
329,330,337,340, 151->153, 157->159; Pc 13-
>15; Pd 04-10
4.3 Pile Driving (37 piles)
Pb45-49, 55->59, 145->148; Pa 464->469,
W S Mr. Tien Mr. Thang
329,330,337,340, 151->153, 157->159; Pc 13-
>15; Pd 04-10
4.3 Pile Conection (37 piles)
Pb45-49, 55->59, 145->148; Pa 464->469,
IW S Mr. Tien Mr. Thang
329,330,337,340, 151->153, 157->159; Pc 13-
>15; Pd 04-10
1. Pile Material
W S Mr. Tien Mr. Thang
SPUN pile D600 for AG00 (lot 07)
4.1 Field Survey Level (41 piles)
Pb 46,47,49, 55->59, 145->148; Pa 470->
S S Mr. Tien Mr. Thang
473,479,152, 157->159; Pc 29->34; Pd 01-
>07,61->63, 67->69
4.3 Pile Driving ( 41 piles)
Pb 46,47,49, 55->59, 145->148; Pa 470->
W S Mr. Tien Mr. Thang
473,479,152, 157->159; Pc 29->34; Pd 01-
>07,61->63, 67->69
4.3 Pile Conection (41piles)
Pb 46,47,49, 55->59, 145->148; Pa 470->
IW S Mr. Tien Mr. Thang
473,479,152, 157->159; Pc 29->34; Pd 01-
>07,61->63, 67->69
1. Pile Material
W S Mr. Tien Mr. Thang
SPUN pile D600 for AG00 (lot 08)
4.1 Field Survey Level (32 piles)
Pa 480-> 483,163->165,169->171; Pb 156->162; S S Mr. Tien Mr. Thang
Pc 39->44, 241->246; Pd 55->57
4.3 Pile Driving ( 32 piles)
Pa 480-> 483,163->165,169->171; Pb 156->162; W S Mr. Tien Mr. Thang
Pc 39->44, 241->246; Pd 55->57
4.3 Pile Conection (32piles)
Pa 480-> 483,163->165,169->171; Pb 156->162; IW S Mr. Tien Mr. Thang
Pc 39->44, 241->246; Pd 55->57
1. Pile Material
W S Mr. Tien Mr. Thang
SPUN pile D600 for AG00 (lot 09)
4.1 Field Survey Level (53 piles)
Pa 577,563-> 568,489->491,495->498,175-
S S Mr. Tien Mr. Thang
>177,181->185; Pb 56,59,65->67,71->73; Pc 49-
>52, 156->163; Pd 61,01->05,563->568,

4.3 Pile Driving (53 piles)


Pa 577,563-> 568,489->491,495->498,175-
>177,181->185;
W S Mr. Tien Mr. Thang
Pb 56,59,65->67,71->73;
Pc 49->52, 156->163;
Pd 61,01->05,563->568,

4.3 Pile Connection (53 piles)


Pa 577,563-> 568,489->491,495->498,175-
IW S Mr. Tien Mr. Thang
>177,181->185; Pb 56,59,65->67,71->73; Pc 49-
>52, 156->163; Pd 61,01->05,563->568,
3.9 PDA Testing
W S Mr. Tien Mr. Thang
Pile no.Pa 592, Pc 39
1. Pile Material
W S Mr. Tien Mr. Thang
SPUN pile D600 for AG00 (lot 10)
4.1 Field Survey Level (36 piles)
Pa 191->195,495->498,563->566;
Pb 160,165,166,171,77->81;
S S Mr. Tien Mr. Thang
Pc 148->151;
Pd 43->47;
Ps58->61

4.3 Pile Driving (36 piles)


Pa 191->195,495->498,563->566;
Pb 160,165,166,171,77->81;
W S Mr. Tien Mr. Thang
Pc 148->151;
Pd 43->47;
Ps58->61
4.3 Pile Connection (36 piles)
Pa 191->195,495->498,563->566;
Pb 160,165,166,171,77->81;
IW S Mr. Tien Mr. Thang
Pc 148->151;
Pd 43->47;
Ps58->61

4.1 Field Survey Level (15 piles)


Pa 182,183,185,191,195;
Pb 106,165,170,171; S S Mr. Tien Mr. Thang
Pc 154;
Pd 11,12,16->1

4.3 Pile Driving (15 piles)


Pa 182,183,185,191,195;
Pb 106,165,170,171; W S Mr. Tien Mr. Thang
Pc 154;
Pd 11,12,16->18

4.3 Pile Connection (15 piles)


Pa 182,183,185,191,195;
Pb 106,165,170,171; IW S Mr. Tien Mr. Thang
Pc 154;
Pd 11,12,16->18

4.3 Pile Driving (5 piles)


Pa 563; Mr. Tien Mr. Thang
W S
Pb 80; 0903288616 01238256666
Pc 148,150,151;

4.3 Pile Driving (15 piles)


Pa 182,183,185,191,195;
Pb 106,165,170,171; W S Mr. Tien Mr. Thang
Pc 154;
Pd 11,16,17

4.1 Field Survey Level (37 piles)


Pa 551-556,207-209,213,215,496-498;
Pb 161,162,166,311-314;
S S Mr. Tien Mr. Thang
Pc 140-143;
Pd 13-15,18-20,88,91,97,99;
Ps 62,64.

4.3 Pile Driving (37 piles)


Pa 551-556,207-209,213,215,496-498;
Pb 161,162,166,311-314;
W S Mr. Tien Mr. Thang
Pc 140-143;
Pd 13-15,18-20,88,91,97,99;
Ps 62,64.

4.3 Pile Connection (37 piles)


Pa 551-556,207-209,213,215,496-498;
Pb 161,162,166,311-314;
IW S Mr. Tien Mr. Thang
Pc 140-143;
Pd 13-15,18-20,88,91,97,99;
Ps 62,64.

4.3 Pile Driving (4 piles) Mr. Tien Mr. Thang


Pb 80; W S 0903288616 01238256666
Pc 148,150,151;

4.3 Pile Driving (13 piles)


Pa 182,183,185,191,195;
Pb 106,165,170,171; W S Mr. Tien Mr. Thang
Pc 154;
Pd 11,16,17
4.3 Pile Driving (35 piles)
Pa 551-555,207-209,213,215,496-498;
Pb 161,162,166,311-314; W S Mr. Tien Mr. Thang
Pc 140-143;
Pd 13-15,18,20,88,91,97,99;
Ps 62,64.

4.1 Field Survey Level (44 piles)


Pa 556,542,213-215,219-223,469,498;
Pb 88,91,170,171,160,166,173,161,196,320-322,326-
328; S S Mr. Tien Mr. Thang
Pc 57-60,73-76,11;
Pd 70-72;
Ps 62,64.

4.3 Pile Driving (44 piles)


Pa 556,542,213-215,219-223,469,498;
Pb 88,91,170,171,160,166,173,161,196,320-322,326-
328; W S Mr. Tien Mr. Thang
Pc 57-60,73-76,11;
Pd 70-72;
Ps 62,64.

4.4 Pile Connection (44 piles)


Pa 556,542,213-215,219-223,469,498;
Pb 88,91,170,171,160,166,173,161,196,320-322,326-
Mr. Tien Mr. Thang
328; IW S
Pc 57-60,73-76,11;
Pd 70-72;
Ps 62,64.
11-May-2021

Inspection Report
Remark
Issued date No. Result By Remark

RIR-PIL-CC1-Z2-0001 Accepted Mr.Thang 135 segment

RIR-PIL-CC1-Z2-0002

Postponed

Postponed

Postponed

Only Pc289, The rest


were postponed
Only Pc289, The rest
were postponed

Only Pc287,
The rest were postponed

Done: Pa357,359
Pc125

Done: Pc286, 288


The rest were postponed

done: Pa358
Pc126,127

Continue

Continue

continue
Continue

Continue

Continue

Continue
Inspection Log.

PJ. : NSRP / Zone-2 / CC1-Piling work

No. NFI No. ITP No. Location Inspection items & Tag No.

PILING WORK
1. Pile Material
1 NFI-PIL-CC1-Z2-0001 ITP-PIL-CC1-001 AG00
SPUN
1. pile D600 for AG00 (firts time)
Pile Material
2 NFI-PIL-CC1-Z2-0002 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 02)
1. Pile Material
3 NFI-PIL-CC1-Z2-0003 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 03)
1. Pile Material
4 NFI-PIL-CC1-Z2-0004 ITP-PIL-CC1-001 AG00 4.1 Field Survey
SPUN pile D600 Level
for AG00 (lot 04)
5 ITP-PIL-CC1-001 AG00 Prior to driving, 6 piles: Pc284 ->
4.3
Pc289Pile Driving
6 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003)
6 piles:
5.1 Pile Pc284 -> Pc289
connection (welding)
7 ITP-PIL-CC1-001 AG00 (AGRP003)
6 piles:
1. Pc284 -> Pc289
Pile Material
8 NFI-PIL-CC1-Z2-0006 ITP-PIL-CC1-001 AG00
SPUN
3.3 Pilepile D600 for AG00 (lot 05)
Driving
9 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003)
6 piles: Pc284 -> Pc289
5.1 Pile connection (welding)
10 ITP-PIL-CC1-001 AG00 (AGRP003)
Fecon Factory - Ha Nam 6
1. Pile Material-> Pc289
piles: Pc284
11 ITP-PIL-CC1-001
Province PilePile
4.3
4.3 Bending
Pile Test
Driving
Driving (17piles)
(5 piles)
9 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003) 3
5 piles:
piles: Pc273->275
Pc284 -> Pc288
13 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001 AG00 (AGRP003) 3 piles: Pc263->264
4.3
4.3 Pile Driving
Driving (14 piles)
Pile Pc125->127
9 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003) 3 piles:
3
4 piles:
piles: Pc273->275
Pc284->286,Pc288
8 piles: Pa357->364
14 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001 AG00 (AGRP003) 3 piles: Pc263->264
1. Pile Material
2 piles: Pc126,127
15 NFI-PIL-CC1-Z2-0006 ITP-PIL-CC1-001 AG00
SPUN
6 pile D600 for AG00 (lot 05)
9 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003) 4.3 Pile Pa358,360->364
4.3piles:
Pile Driving
Driving (11piles)
2 piles:
4.3
3 piles: Pc284,285
Pile Pc273->275
Driving (11 piles)
14 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001 AG00 3
3 piles:
4.1 FieldPc122->124
piles: Pc263->264
Survey Level (22 piles)
17 NFI-PIL-CC1-Z2-0008 ITP-PIL-CC1-001 AG00 3
5 piles:
piles: 111->113
4.3 Pile Pa360->364
10piles:Pc200->202,197-
Driving (22 piles)
18 ITP-PIL-CC1-001 AG00 2 piles: 284,285
>199,83,84,87,88
10piles:Pc200->202,197-
4.4 Pile connection (welding)
3 piles:
12 piles:273->27
Pa591->594, 413->415, 347-
19 NFI-PIL-CC1-Z2-0009 ITP-PIL-CC1-001 AG00 >199,83,84,87,88;
10piles:Pc200->202,197-
>351
12piles:Pa591->594,
20 ITP-PIL-CC1-001 AG00 >199,83,84,87,88
413->415,
1. Pile 347->351
Material
12piles:Pa591->594,413->415,
4.1 Field Survey Level (31 piles)347-
21 NFI-PIL-CC1-Z2-0010 ITP-PIL-CC1-001 AG00
SPUN
>351
Pa pile D600 for447->451,419-
245->247,595, AG00 (lot 06)
22 ITP-PIL-CC1-001 AG00 4.3 Pile Driving (31 piles)
>421,337->341,219->223
Pa 245->247,595,
23 NFI-PIL-CC1-Z2-0011 ITP-PIL-CC1-001 AG00 4.3 Pile Conection 447->451,419-
(31 piles)
Pc 09->12; Pd 06->10
>421,337->341,219->223
Pa 245->247,595,
4.1 447->451,419-
24 ITP-PIL-CC1-001 AG00 Pc 09->12; Pd 06->10 (35 piles)
Field Survey Level
>421,337->341,219->223
Pb 37->40,145; Pa583->586, 457-
25 ITP-PIL-CC1-001 AG00 Pc 09->12; Pd 06->10
>461,337->341,151->153,157->159
Pd 09,10; Pc 69->72, 78
4.3 Pile Driving (35 piles)
Pb 37->40,145; Pa583->586, 457-
26 NFI-PIL-CC1-Z2-0012 ITP-PIL-CC1-001 AG00
>461,337->341,151->153,157->159
Pd 09,10; Pc 69->72, 78

4.3 Pile Conection (35 piles)


Pb 37->40,145; Pa583->586, 457-
27 ITP-PIL-CC1-001 AG00
>461,337->341,151->153,157->159
Pd 09,10; Pc 69->72, 78

Inspection system Temporary Bench


28 ITP-PIL-CC1-001 Zone-2 Mark
at the site

4.1 Field Survey Level (37 piles)


Pb45-49, 55->59, 145->148; Pa 464-
29 ITP-PIL-CC1-001 AG00
>469, 329,330,337,340, 151->153,
157->159; Pc 13->15; Pd 04-10
4.3 Pile Driving (37 piles)
Pb45-49, 55->59, 145->148; Pa 464-
30 NFI-PIL-CC1-Z2-0013 ITP-PIL-CC1-001 AG00
>469, 329,330,337,340, 151->153,
157->159; Pc 13->15; Pd 04-10

4.3 Pile Conection (37 piles)


Pb45-49, 55->59, 145->148; Pa 464-
31 ITP-PIL-CC1-001 AG00
>469, 329,330,337,340, 151->153,
157->159; Pc 13->15; Pd 04-10

1. Pile Material
32 NFI-PIL-CC1-Z2-0014 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 07)

4.1 Field Survey Level (41 piles)


Pb 46,47,49, 55->59, 145->148; Pa
33 ITP-PIL-CC1-001 AG00
470-> 473,479,152, 157->159; Pc 29-
>34; Pd 01->07,61->63, 67->69

4.3 Pile Driving ( 41 piles)


Pb 46,47,49, 55->59, 145->148; Pa
34 NFI-PIL-CC1-Z2-0015 ITP-PIL-CC1-001 AG00
470-> 473,479,152, 157->159; Pc 29-
>34; Pd 01->07,61->63, 67->69

4.3 Pile Conection (41piles)


Pb 46,47,49, 55->59, 145->148; Pa
35 ITP-PIL-CC1-001 AG00
470-> 473,479,152, 157->159; Pc 29-
>34; Pd 01->07,61->63, 67->69

1. Pile Material
36 NFI-PIL-CC1-Z2-0016 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 08)
4.1 Field Survey Level (32 piles)
Pa 480-> 483,163->165,169->171; Pb
37 ITP-PIL-CC1-001 AG00
156->162; Pc 39->44, 241->246; Pd
55->57
4.3 Pile Driving ( 32 piles)
Pa 480-> 483,163->165,169->171; Pb
38 NFI-PIL-CC1-Z2-0017 ITP-PIL-CC1-001 AG00
156->162; Pc 39->44, 241->246; Pd
55->57
4.3 Pile Conection (32piles)
Pa 480-> 483,163->165,169->171; Pb
39 ITP-PIL-CC1-001 AG00
156->162; Pc 39->44, 241->246; Pd
55->57
1. Pile Material
40 NFI-PIL-CC1-Z2-00018 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 09)

4.1 Field Survey Level (53 piles)


Pa 577,563-> 568,489->491,495-
41 ITP-PIL-CC1-001 AG00 >498,175->177,181->185; Pb
56,59,65->67,71->73; Pc 49->52, 156-
>163; Pd 61,01->05,563->568,

4.3 Pile Driving (53 piles)


Pa 577,563-> 568,489->491,495-
>498,175->177,181->185;
42 NFI-PIL-CC1-Z2-00019 ITP-PIL-CC1-001 AG00
Pb 56,59,65->67,71->73;
Pc 49->52, 156->163;
Pd 61,01->05,563->568,
4.3 Pile Connection (53 piles)
Pa 577,563-> 568,489->491,495-
43 ITP-PIL-CC1-001 AG00 >498,175->177,181->185; Pb
56,59,65->67,71->73; Pc 49->52, 156-
>163; Pd 61,01->05,563->568,

3.9 PDA Testing


44 NFI-PIL-CC1-Z2-00020 ITP-PIL-CC1-001 AG00
Pile no.Pa 592, Pc 39
1. Pile Material
45 NFI-PIL-CC1-Z2-00021 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 10)
4.1 Field Survey Level (36 piles)
Pa 191->195,495->498,563->566;
Pb 160,165,166,171,77->81;
46 ITP-PIL-CC1-001 AG00
Pc 148->151;
Pd 43->47;
Ps58->61

4.3 Pile Driving (36 piles)


Pa 191->195,495->498,563->566;
Pb 160,165,166,171,77->81;
47 NFI-PIL-CC1-Z2-00022 ITP-PIL-CC1-001 AG00
Pc 148->151;
Pd 43->47;
Ps58->61

4.3 Pile Connection (36 piles)


Pa 191->195,495->498,563->566;
Pb 160,165,166,171,77->81;
48 ITP-PIL-CC1-001 AG00
Pc 148->151;
Pd 43->47;
Ps58->61
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
Inspection Mode Inspection Report
Inspection date Remark
JGCS IPMT Issued date No. Result By

11/3/2014 W S RIR-PIL-CC1-Z2-0001 Accepted Mr.Thang


14/3/2014 W S RIR-PIL-CC1-Z2-0002
17/3/2014 W S
18/3/2014 W S
18/3/2014 S S
18/3/2014 W S Postponed
18/3/2014 IW S Postponed
19/3/2014 W S Postponed
Only Pc289,
19/3/2014 W S The rest were
Only Pc289,
19/3/2014 IW S postponed
The rest were
19/3/2014 W S postponed
Only Pc287,
20/3/2014 W S TheDone:
rest were
20/3/2014 W S postponed
Done: Pc286,
Pa357,359
288
Pc125
21/3/2014 W S
The rest
done: were
Pa358
21/3/2014 W S postponed
Pc126,127
21/3/2014 W S Continue
22/3/2014 W S Continue
22/3/2014 W S continue
22/3/2014 W S
23/3/2014 S S
23,24/3/2014 W S
23,24/3/2014 IW S
25/3/2014 W S
25/3/2014 S S
25/3/2014 W S
25/3/2014 IW S
26/3/2014 S S

26/3/2014 W S

26/3/2014 IW S

27/3/2014

27/3/2014 S S
27/3/2014 W S

27/3/2014 IW S

28/3/2014 W S

28/3/2014 S S

28/3/2014 W S

28/3/2014 IW S

29/3/2014 W S

29/3/2014 S S

29/3/2014 W S

29/3/2014 IW S

31/3/2014 W S

30,31/3/2014 S S

30,31/3/2014 W S
30,31/3/2014 IW S

31/3/2014 W S

41730 W S

41730 S S

41730 W S

41730 IW S
Remark

135 segment
NOTIFICATION FOR INSPECTION (Over

PJ. : NSRP / Zone-2 / CC1-Civil work


Inspection Sub
No. Location NFI No.
Time Date contractor

1 08:00~ 5/3/2014 AG00 CC1

2 08:00~ 5/3/2014 AG00 CC1 TSF-Z2-CC1-0001

3 08:00~ 17/3/2014 B100, B200 CC1 NFI-CVL-CC1-Z2-0002

4 09:00~ 19/3/2014 B300 CC1 NFI-CVL-CC1-Z2-0003

5 09:00~ 24/3/2014 B400 CC1 NFI-CVL-CC1-Z2-0004

6 10:00~ 24/3/2014 AG00 CC1 NFI-CVL-CC1-Z2-0005

7 09:00~ 26/3/2014 B100, B200 CC1

8 10:00~ 27/3/2014 B400 CC1 NFI-CVL-CC1-Z2-0006

9 14:00~ 27/3/2014 AG00, B300 CC1

+ Tan Thanh 6 Batching


Plant - Truong Lam
Commune (10 km from
10 09:00~ 27/3/2014 NSRP site) CC1 NFI-CVL-CC1-Z2-0007
+ Phuong Bac Lab 702 - Hai
Thuong Commune (3km
from NSRP site)

11 08:00~ 29/3/2014 B500 CC1 NFI-CVL-CC1-Z2-0008

Dung Toan bowrow pit, Nam


12 7:00~ 31/03/2014 CC1 NFI-CVL-CC1-Z2-0009
Dan, Nghe An

13 10:00~ '1/4/2014 B500 CC1 NFI-CVL-CC1-Z2-0008

15 7:00~ 2/4/2014 Nam Phuong bowrow pit CC1 NFI-CVL-CC1-Z2-0010

16 7:00~ 2/4/2014 Cement Nghi Son factory CC1 NFI-CVL-CC1-Z2-0010

17 7:00~ 2/4/2014 At site CC1 NFI-CVL-CC1-Z2-0010

18 7:00~ 2/4/2014 At site CC1 NFI-CVL-CC1-Z2-0010

14 10:00~ 3/4/2014 AG00, B100 CC1 NFI-CVL-CC1-Z2-0011

14
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
NOTIFICATION FOR INSPECTION (Overall Information)

Inspection Mode Inspector


ITP No. Activity (Inspection Item)
JGCS IPMT Sub-con

1.3 Field Survey level Mr. Tien


CC1-NSRP-FIPSRIF-001 S S
After top soil removal and compaction 0903288616
2.1 Visual inspection after removing top soil Mr. Tien
CC1-NSRP-FIPSRIF-001 W S
After top soil removal and compaction 0903288616
2.1 Visual inspection after removing topsoil (After Mr. Thai
ITP-CVL-CC1-001 W S
topsoil remove and compaction) 0918.231.087
2.1 Visual inspection after removing topsoil (After Mr. Thai
ITP-CVL-CC1-001 W S
topsoil remove and compaction) 0918.231.087
2.1 Visual inspection after removing topsoil (After Mr.Thai
ITP-CVL-CC1-001 W S
topsoil remove and compaction) 0918.231.087
Mr.Thai
ITP-CVL-CC1-001 3.2 Suitable Material Filling W S
0918.231.087
Mr.Thai
ITP-CVL-CC1-001 2.2 Disposal of Excavated Topsoil S S
0918.231.087
2.1 Visual inspection after removing topsoil (After Mr.Thai
ITP-CVL-CC1-001 W S
topsoil remove and compaction) 0918.231.087
Mr.Thai
ITP-CVL-CC1-001 2.2 Disposal of Excavated Topsoil S S
0918.231.087

+ Material sampling at Batching Plant Mr. Huy


ITP-CVL-CC1-001 R R
+ Trial mix at laboratory 0933104844

2.1 Visual inspection after removing topsoil (After Mr.Thai


ITP-CVL-CC1-001 W S
topsoil remove and compaction) 0918.231.087
Mr.Thai
ITP-CVL-CC1-001 Sand sampling for concrete R R
0918231087
2.1 Visual inspection after removing topsoil (After Mr.Thai
ITP-CVL-CC1-001 W S
topsoil remove and compaction) 0918.231.087
Stone (1x2) sampling Mr.Thai
ITP-CVL-CC1-001 R R
Cement Nghi Son sampling 0918231087
Mr.Thai
ITP-CVL-CC1-001 Cement Nghi Son sampling R R
0918231087
Mr.Thai
ITP-CVL-CC1-001 Admixture (Sika) sampling R R
0918231087
Mr.Thai
ITP-CVL-CC1-001 Water sampling R R
0918231087
Mr.Thai
ITP-CVL-CC1-001 3.2 Suitable Material Filling W S
0918.231.087
Inspector Inspection Report
IPMT Remark
JGCS Issued date No. Result

Mr. Lee

Mr. Lee

Mr. Thang IR-CVL-B100-0001


0915.663.183 IR-CVL-B200-0001
Mr. Thang
IR-CVL-B300-0001
0915.663.183
Mr. Thang
Rejected Rejected
0915.663.183
Mr. Thang
Rejected
0915.663.183
Mr. Thang
0915.663.183
Mr. Thang
IR-CVL-B400-0001
0915.663.183
Mr. Thang
0915.663.183

Mr. Thang
0915663183

Mr. Thang
Postponed IR-CVL-B500-0001
0915.663.183
Mr.Thang
0915663183
Mr. Thang
Repeat
01238256666
Mr. Thang
01238256666
Mr. Thang
01238256666
Mr. Thang
01238256666
Mr. Thang
01238256666
Mr. Thang
0915.663.183
ction Report
By Remark
Inspection Log.

PJ. : NSRP / Zone-2 / CC1-Civil work


No. NFI No. ITP No. Location
CIVIL WORK
1 CC1-NSRP-FIPSRIF-001 AG00
2 TSF-Z2-CC1-0001 CC1-NSRP-FIPSRIF-001 AG00
3 NFI-CVL-CC1-Z2-0002 ITP-CVL-CC1-001 B100, B200
4 NFI-CVL-CC1-Z2-0003 ITP-CVL-CC1-001 B300
5 NFI-CVL-CC1-Z2-0004 ITP-CVL-CC1-001 B400
6 NFI-CVL-CC1-Z2-0005 ITP-CVL-CC1-001 AG00
7 ITP-CVL-CC1-001 + Tan B100,
ThanhB200
6 Batching
8 NFI-CVL-CC1-Z2-0006 ITP-CVL-CC1-001 Plant - B400
Truong Lam
9 ITP-CVL-CC1-001 AG00,(10
Commune B300
km from
10 NFI-CVL-CC1-Z2-0007 ITP-CVL-CC1-001 NSRP site)
11 NFI-CVL-CC1-Z2-0008 ITP-CVL-CC1-001 + Phuong Bac Lab 702 - Hai
B500
Dung Toan
Thuong bowrow(3km
Commune pit,
12 NFI-CVL-CC1-Z2-0009 ITP-CVL-CC1-001
Nam
fromDan,
NSRPNghe An
site)
13 NFI-CVL-CC1-Z2-0008 ITP-CVL-CC1-001 B500
15 NFI-CVL-CC1-Z2-0010 ITP-CVL-CC1-001 Nam Phuong bowrow pit
16 NFI-CVL-CC1-Z2-0010 ITP-CVL-CC1-001 Cement Nghi Son factory
17 NFI-CVL-CC1-Z2-0010 ITP-CVL-CC1-001 At site
18 NFI-CVL-CC1-Z2-0010 ITP-CVL-CC1-001 At site
14 NFI-CVL-CC1-Z2-0011 ITP-CVL-CC1-001 AG00, B100
14
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Inspection Mode
Inspection items & Tag No. Inspection date Remark
JGCS IPMT
1.3 Field Survey level
5/3/2014 S S
After top soil
2.1 Visual removal after
inspection and compaction
removing top soil
5/3/2014 W S
AfterVisual
2.1 top soil removal after
inspection and compaction
removing topsoil (After
17/3/2014 W S
topsoil
2.1 remove
Visual and compaction)
inspection after removing topsoil (After
19/3/2014 W S
topsoil
2.1 remove
Visual and compaction)
inspection after removing topsoil (After
24/3/2014 W S Rejected
topsoil remove and compaction)
3.2 Suitable Material Filling 24/3/2014 W S Rejected
2.2 Disposal of Excavated Topsoil 26/3/2014 S S
2.1 Visual inspection after removing topsoil (After
27/3/2014 W S
topsoil remove and compaction)
2.2 Disposal of Excavated Topsoil 27/3/2014 S S
+ Material sampling at Batching Plant
27/3/2014 R R
+ Trial
2.1 mixinspection
Visual at laboratory
after removing topsoil (After
29/3/2014 W S Postponed
topsoil remove and compaction)
Sand sampling for concrete 31/03/2014 R R
2.1 Visual inspection after removing topsoil (After
'1/4/2014 W S Repeat
topsoil(1x2)
Stone remove and compaction)
sampling
2/4/2014 R R
Cement Nghi Son sampling
Cement Nghi Son sampling 2/4/2014 R R
Admixture (Sika) sampling 2/4/2014 R R
Water sampling 2/4/2014 R R
3.2 Suitable Material Filling 3/4/2014 W S
Inspection Report
Issued date No. Result By Remark

IR-CVL-B100-0001
IR-CVL-B200-0001
IR-CVL-B300-0001
Rejected

IR-CVL-B400-0001

IR-CVL-B500-0001
Inspection Log.

PJ. : NSRP / Zone-2


Inspection
Sub
No. Location NFI No. ITP No.
Time Date contractor

PILING WORK
ZONE-2 B100
1 24-Jan-2014 CC1 PIL-Z2-CC1-0001 CC1-NSRP-FIPPW-001
(Refer to dwg)
Zone-2
2 24-Jan-2014 CC1 PIL-Z2-CC1-0002 CC1-NSRP-FIPPW-001
B200,AG00,B300
Zone-2
3 25~26-Jan-14 CC1 CC1-NSRP-FIPPW-001
B200,AG00,B300
Zone-2
4 25~26-Jan-14 CC1 PIL-Z2-CC1-0003 CC1-NSRP-FIPPW-001
B200,AG00,B300
Zone-2
5 25~26-Jan-14 Zone-2: B200, CC1 PIL-Z2-CC1-0003 CC1-NSRP-FIPPW-001
B200,AG00,B300
AG00, B300
6 13-Feb-2014 CC1 PIL-Z2-CC1-0004 CC1-NSRP-FIPPW-001
(refer to attached
Zone-2 B100
10 20-Feb-14 drawing)
(refer to attached CC1 PIL-Z2-CC1-0008 CC1-NSRP-FIPPW-001
Zone-2 B100
drawing)
11 20-Feb-14 (refer to attached CC1 PIL-Z2-CC1-0008 CC1-NSRP-FIPPW-001
Zone-2 B100
drawing)
12 20-Feb-14 (refer to attached CC1 PIL-Z2-CC1-0008 CC1-NSRP-FIPPW-001
Zone-2 B200
drawing)
13 19-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0009 CC1-NSRP-FIPPW-001
Zone-2, AG00
drawing)
7 15-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0005 CC1-NSRP-FIPPW-001
drawing)
8 18-Feb-2014 Zone-2, AG00 CC1 PIL-Z2-CC1-0006 CC1-NSRP-FIPPW-001
Zone-2, B300
9 18-Feb-2014 CC1 PIL-Z2-CC1-0007 CC1-NSRP-FIPPW-001
(DEMINE&FUEL)
Zone-2 B300
14 21-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0010 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
15 22-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0011 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
16 22-Feb-2014 (refer to attached CC1 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
17 22-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0011 CC1-NSRP-FIPPW-001
Zone-2 B200
drawing)
18 22-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0012 CC1-NSRP-FIPPW-001
Zone-2 B100, B400
drawing)
19 24-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0013 CC1-NSRP-FIPPW-001
Zone-2 B100
drawing)
20 27-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0014 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
21 8:00~17:00 01-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0015 CC1-NSRP-FIPPW-001
Zone-2 B100
drawing)
22 8:00~15:00 3-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0016 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
23 8:00~15:00 4-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0017 CC1-NSRP-FIPPW-001
Zone-2 B200
drawing)
24 8:00~15:00 5-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0018 CC1-NSRP-FIPPW-001
Zone-2 AG00
drawing)
25 8:00~15:00 6-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0019 CC1-NSRP-FIPPW-001
Zone-2 AG00
drawing)
26 8:00~ 11-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0020 CC1-NSRP-FIPPW-001
drawing)
27 14/3/2014 AG00 CC1 No need (Mr. Lee) ITP-PIL-CC1-001
28 17/3/2014 B200, AG00 CC1 No need (Mr. Lee) ITP-PIL-CC1-001
29 19/3/2014 B400 CC1 No need (Mr. Lee) ITP-PIL-CC1-001

End of Preliminary Pile, For Permanent Pile please see the next sheet
TOPSOIL REMOVE AND INITIAL FILLING WORK

Zone-2 AG00
1 8:00~ 5-Mar-2014 (refer to attached CC1 CC1-NSRP-FIPSRIF-001
drawing)
Zone-2 AG00
2 8:00~ 5-Mar-2014 (refer to attached CC1 TSF-Z2-CC1-0001 CC1-NSRP-FIPSRIF-001
drawing)
Inspection Mode Inspector
Activity (Inspection Item) IPMT
JGCS IPMT Sub-con JGCS

1. Pile material
Mr. Tien
Site inspection of pile quality before W S Mr. JE,OH
3.1 Field Survey 0903288616
using(D400, 600)Level Mr. Tien
(Site survey and making for coordinate and S S Mr. JE,OH
0903288616 Agreed to
existing level of piling location(TP600-5,6,7)
3.3 Pile Driving Mr. Tien
W S Mr. JE,OH proceed by Mr.
(Preliminary load test pile:TP600-5,6,7)
5.1 Pile connection(welding) 0903288616
Mr. Tien LoiAgreed to
on 27-Jan
(Preliminary load test pile : S IW Mr. JE,OH proceed by Mr.
3.5 TP600-5,6,7)
PDA Testing 0903288616
Mr. Tien LoiAgreed to
on 27-Jan
(Preliminary
6. Pile load test pile :
head treatment W IW Mr. JE,OH proceed by Mr.
0903288616
TP600-5,6,7)
Check pile head cutting and treatment prior to Mr. Tien Mr. Cho Loi on 27-Jan
W W Mr. Ooi
Load Testing. 0903288616 0916310818
3.3
PilePile
No.:Driving
TP-600-05, TP-600-06, TP-600-07 Mr. Tien
W S Mr. Lee
(Preliminary pile no.TP 400-07 / D400) 0903288616
5.1 Pile Connection (Welding) Mr. Tien
S IW Mr. Lee
(Preliminary pile: TP 400-07 / D400) 0903288616
3.5 PDA Testing Mr. Tien
W IW Mr. Lee
(Preliminary
3.4 Pile Loadpile: TP 400-07 / D400)
testing 0903288616
Mr. Tien
Static compression load testing of pile no. TP 600- W IW Mr. Lee
3.4 0903288616
05 Pile load testing Mr. Tien Mr. Cho
Static compression load test W IW Mr. Woo
3.4 0903288616 0916310818
PilePile load testing
no.TP-600-06 Mr. Tien Mr. Cho
Static lateral load test W IW
3.4 0903288616 0916310818
PilePile load testing
no.TP-600-06 Mr. Tien Mr. Cho
Static compression load test W IW
0903288616 0916310818
Pile no.TP-600-07
3.4 Pile Load testing Mr. Tien
W IW Mr. Lee
Static lateral load testing of pile no. TP 600-07 0903288616
3.3 Pile driving Mr. Tien
W S Mr. Lee
Driving preliminary pile no. TP 400-08 0903288616
5.1 Pile Connection (Welding) Mr. Tien
S IW Mr. Lee
(Preliminary pile: TP 400-08 / D400) 0903288616
3.5 PDA Testing Mr. Tien
W IW Mr. Lee
(Preliminary pile: TP 400-08 / D400) 0903288616
3.4 Pile load testing Mr. Tien
W IW Mr. Lee
Lateral
6. load testing
Pile head treatment of pile no.TP-600-05 0903288616
Mr. Tien
Pile head cutting prior to load test commencement W W Mr. Lee
3.4 Pile load testing 0903288616
for TP-400-07, TP-400-08 Mr. Tien
Static compression load testing of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-400-07 Mr. Tien
Static compression load testing of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-400-08 Mr. Tien
Lateral load testing of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-400-07 Mr. Tien
Lateral load testing of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-400-08 Mr. Tien
Tensile test of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-600-05 Mr. Tien
Tensile test of pile W IW Mr. Lee
1. Pile material 0903288616
no.TP-600-06 Mr. Tien
Site inspection of pile quality before W S Mr. Lee
0903288616
using(D600)
1. PDA Test/ second times Mr. Tien Mr. Thang
W IW
Preliminary pile no. TP-600-07 0903.288.616 0915.663.183
1. PDA Test/ second times Mr. Tien Mr. Thang
W IW
Preliminary pile no. TP-600-05; TP-600-06 0903.288.616 0915.663.183
3.5 PDA Test / Second Times Mr. Tien Mr. Thang
W IW
Preliminary piles TP-400-08 0903.288.616 0915.663.183
1.3 Field Survey level Mr. Tien
S S Mr. Lee
After top soil removal and compaction 0903288616

2.1 Visual inspection after removing top soil Mr. Tien


W S Mr. Lee
After top soil removal and compaction 0903288616
Inspection Report

Issued Remark
No. Result
date

24-Jan-14 CC1-NSRP-PIL-Z2-0001 Accept


24-Jan-14 CC1-NSRP-PIL-Z2-0002
*CC1-NSRP-PIL-Z2-0003/0003- Accept
1/0003-2
26-Jan-14 Accept [ IW ]
*CC1-NSRP-PIL-Z2-0005/0005-
CC1-NSRP-PIL-Z2-0004
1/0005-2
26-Jan-14 Accept
/0004-1/0004-2
26-Jan-14 01/IGE-NSRP Accept
--- Need Repair

* Preliminary pile D400 welding


allowed

waiting for rusult report

PDA Test on 23-Feb-2014


(because final set not sastify on
22-Feb-2014)