Inspection Sub
No. Location NFI No. ITP No.
Time Date contractor
PILING WORK
Fecon Factory - Ha
11 07:00~ 19/3/2014 CC1 ITP-PIL-CC1-001
Nam Province
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
FOR INSPECTION (Overall Information)
Date of Notification: 11-May-2021
Inspection Report
Remark
Issued date No. Result By Remark
RIR-PIL-CC1-Z2-0002
Postponed
Postponed
Postponed
Only Pc287,
The rest were postponed
Done: Pa357,359
Pc125
done: Pa358
Pc126,127
Continue
Continue
continue
Continue
Continue
Continue
Continue
Inspection Log.
No. NFI No. ITP No. Location Inspection items & Tag No.
PILING WORK
1. Pile Material
1 NFI-PIL-CC1-Z2-0001 ITP-PIL-CC1-001 AG00
SPUN
1. pile D600 for AG00 (firts time)
Pile Material
2 NFI-PIL-CC1-Z2-0002 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 02)
1. Pile Material
3 NFI-PIL-CC1-Z2-0003 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 03)
1. Pile Material
4 NFI-PIL-CC1-Z2-0004 ITP-PIL-CC1-001 AG00 4.1 Field Survey
SPUN pile D600 Level
for AG00 (lot 04)
5 ITP-PIL-CC1-001 AG00 Prior to driving, 6 piles: Pc284 ->
4.3
Pc289Pile Driving
6 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003)
6 piles:
5.1 Pile Pc284 -> Pc289
connection (welding)
7 ITP-PIL-CC1-001 AG00 (AGRP003)
6 piles:
1. Pc284 -> Pc289
Pile Material
8 NFI-PIL-CC1-Z2-0006 ITP-PIL-CC1-001 AG00
SPUN
3.3 Pilepile D600 for AG00 (lot 05)
Driving
9 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003)
6 piles: Pc284 -> Pc289
5.1 Pile connection (welding)
10 ITP-PIL-CC1-001 AG00 (AGRP003)
Fecon Factory - Ha Nam 6
1. Pile Material-> Pc289
piles: Pc284
11 ITP-PIL-CC1-001
Province PilePile
4.3
4.3 Bending
Pile Test
Driving
Driving (17piles)
(5 piles)
9 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003) 3
5 piles:
piles: Pc273->275
Pc284 -> Pc288
13 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001 AG00 (AGRP003) 3 piles: Pc263->264
4.3
4.3 Pile Driving
Driving (14 piles)
Pile Pc125->127
9 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003) 3 piles:
3
4 piles:
piles: Pc273->275
Pc284->286,Pc288
8 piles: Pa357->364
14 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001 AG00 (AGRP003) 3 piles: Pc263->264
1. Pile Material
2 piles: Pc126,127
15 NFI-PIL-CC1-Z2-0006 ITP-PIL-CC1-001 AG00
SPUN
6 pile D600 for AG00 (lot 05)
9 NFI-PIL-CC1-Z2-0005 ITP-PIL-CC1-001 AG00 (AGRP003) 4.3 Pile Pa358,360->364
4.3piles:
Pile Driving
Driving (11piles)
2 piles:
4.3
3 piles: Pc284,285
Pile Pc273->275
Driving (11 piles)
14 NFI-PIL-CC1-Z2-0007 ITP-PIL-CC1-001 AG00 3
3 piles:
4.1 FieldPc122->124
piles: Pc263->264
Survey Level (22 piles)
17 NFI-PIL-CC1-Z2-0008 ITP-PIL-CC1-001 AG00 3
5 piles:
piles: 111->113
4.3 Pile Pa360->364
10piles:Pc200->202,197-
Driving (22 piles)
18 ITP-PIL-CC1-001 AG00 2 piles: 284,285
>199,83,84,87,88
10piles:Pc200->202,197-
4.4 Pile connection (welding)
3 piles:
12 piles:273->27
Pa591->594, 413->415, 347-
19 NFI-PIL-CC1-Z2-0009 ITP-PIL-CC1-001 AG00 >199,83,84,87,88;
10piles:Pc200->202,197-
>351
12piles:Pa591->594,
20 ITP-PIL-CC1-001 AG00 >199,83,84,87,88
413->415,
1. Pile 347->351
Material
12piles:Pa591->594,413->415,
4.1 Field Survey Level (31 piles)347-
21 NFI-PIL-CC1-Z2-0010 ITP-PIL-CC1-001 AG00
SPUN
>351
Pa pile D600 for447->451,419-
245->247,595, AG00 (lot 06)
22 ITP-PIL-CC1-001 AG00 4.3 Pile Driving (31 piles)
>421,337->341,219->223
Pa 245->247,595,
23 NFI-PIL-CC1-Z2-0011 ITP-PIL-CC1-001 AG00 4.3 Pile Conection 447->451,419-
(31 piles)
Pc 09->12; Pd 06->10
>421,337->341,219->223
Pa 245->247,595,
4.1 447->451,419-
24 ITP-PIL-CC1-001 AG00 Pc 09->12; Pd 06->10 (35 piles)
Field Survey Level
>421,337->341,219->223
Pb 37->40,145; Pa583->586, 457-
25 ITP-PIL-CC1-001 AG00 Pc 09->12; Pd 06->10
>461,337->341,151->153,157->159
Pd 09,10; Pc 69->72, 78
4.3 Pile Driving (35 piles)
Pb 37->40,145; Pa583->586, 457-
26 NFI-PIL-CC1-Z2-0012 ITP-PIL-CC1-001 AG00
>461,337->341,151->153,157->159
Pd 09,10; Pc 69->72, 78
1. Pile Material
32 NFI-PIL-CC1-Z2-0014 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 07)
1. Pile Material
36 NFI-PIL-CC1-Z2-0016 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 08)
4.1 Field Survey Level (32 piles)
Pa 480-> 483,163->165,169->171; Pb
37 ITP-PIL-CC1-001 AG00
156->162; Pc 39->44, 241->246; Pd
55->57
4.3 Pile Driving ( 32 piles)
Pa 480-> 483,163->165,169->171; Pb
38 NFI-PIL-CC1-Z2-0017 ITP-PIL-CC1-001 AG00
156->162; Pc 39->44, 241->246; Pd
55->57
4.3 Pile Conection (32piles)
Pa 480-> 483,163->165,169->171; Pb
39 ITP-PIL-CC1-001 AG00
156->162; Pc 39->44, 241->246; Pd
55->57
1. Pile Material
40 NFI-PIL-CC1-Z2-00018 ITP-PIL-CC1-001 AG00
SPUN pile D600 for AG00 (lot 09)
26/3/2014 W S
26/3/2014 IW S
27/3/2014
27/3/2014 S S
27/3/2014 W S
27/3/2014 IW S
28/3/2014 W S
28/3/2014 S S
28/3/2014 W S
28/3/2014 IW S
29/3/2014 W S
29/3/2014 S S
29/3/2014 W S
29/3/2014 IW S
31/3/2014 W S
30,31/3/2014 S S
30,31/3/2014 W S
30,31/3/2014 IW S
31/3/2014 W S
41730 W S
41730 S S
41730 W S
41730 IW S
Remark
135 segment
NOTIFICATION FOR INSPECTION (Over
14
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
NOTIFICATION FOR INSPECTION (Overall Information)
Mr. Lee
Mr. Lee
Mr. Thang
0915663183
Mr. Thang
Postponed IR-CVL-B500-0001
0915.663.183
Mr.Thang
0915663183
Mr. Thang
Repeat
01238256666
Mr. Thang
01238256666
Mr. Thang
01238256666
Mr. Thang
01238256666
Mr. Thang
01238256666
Mr. Thang
0915.663.183
ction Report
By Remark
Inspection Log.
IR-CVL-B100-0001
IR-CVL-B200-0001
IR-CVL-B300-0001
Rejected
IR-CVL-B400-0001
IR-CVL-B500-0001
Inspection Log.
PILING WORK
ZONE-2 B100
1 24-Jan-2014 CC1 PIL-Z2-CC1-0001 CC1-NSRP-FIPPW-001
(Refer to dwg)
Zone-2
2 24-Jan-2014 CC1 PIL-Z2-CC1-0002 CC1-NSRP-FIPPW-001
B200,AG00,B300
Zone-2
3 25~26-Jan-14 CC1 CC1-NSRP-FIPPW-001
B200,AG00,B300
Zone-2
4 25~26-Jan-14 CC1 PIL-Z2-CC1-0003 CC1-NSRP-FIPPW-001
B200,AG00,B300
Zone-2
5 25~26-Jan-14 Zone-2: B200, CC1 PIL-Z2-CC1-0003 CC1-NSRP-FIPPW-001
B200,AG00,B300
AG00, B300
6 13-Feb-2014 CC1 PIL-Z2-CC1-0004 CC1-NSRP-FIPPW-001
(refer to attached
Zone-2 B100
10 20-Feb-14 drawing)
(refer to attached CC1 PIL-Z2-CC1-0008 CC1-NSRP-FIPPW-001
Zone-2 B100
drawing)
11 20-Feb-14 (refer to attached CC1 PIL-Z2-CC1-0008 CC1-NSRP-FIPPW-001
Zone-2 B100
drawing)
12 20-Feb-14 (refer to attached CC1 PIL-Z2-CC1-0008 CC1-NSRP-FIPPW-001
Zone-2 B200
drawing)
13 19-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0009 CC1-NSRP-FIPPW-001
Zone-2, AG00
drawing)
7 15-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0005 CC1-NSRP-FIPPW-001
drawing)
8 18-Feb-2014 Zone-2, AG00 CC1 PIL-Z2-CC1-0006 CC1-NSRP-FIPPW-001
Zone-2, B300
9 18-Feb-2014 CC1 PIL-Z2-CC1-0007 CC1-NSRP-FIPPW-001
(DEMINE&FUEL)
Zone-2 B300
14 21-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0010 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
15 22-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0011 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
16 22-Feb-2014 (refer to attached CC1 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
17 22-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0011 CC1-NSRP-FIPPW-001
Zone-2 B200
drawing)
18 22-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0012 CC1-NSRP-FIPPW-001
Zone-2 B100, B400
drawing)
19 24-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0013 CC1-NSRP-FIPPW-001
Zone-2 B100
drawing)
20 27-Feb-2014 (refer to attached CC1 PIL-Z2-CC1-0014 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
21 8:00~17:00 01-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0015 CC1-NSRP-FIPPW-001
Zone-2 B100
drawing)
22 8:00~15:00 3-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0016 CC1-NSRP-FIPPW-001
Zone-2 B400
drawing)
23 8:00~15:00 4-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0017 CC1-NSRP-FIPPW-001
Zone-2 B200
drawing)
24 8:00~15:00 5-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0018 CC1-NSRP-FIPPW-001
Zone-2 AG00
drawing)
25 8:00~15:00 6-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0019 CC1-NSRP-FIPPW-001
Zone-2 AG00
drawing)
26 8:00~ 11-Mar-2014 (refer to attached CC1 PIL-Z2-CC1-0020 CC1-NSRP-FIPPW-001
drawing)
27 14/3/2014 AG00 CC1 No need (Mr. Lee) ITP-PIL-CC1-001
28 17/3/2014 B200, AG00 CC1 No need (Mr. Lee) ITP-PIL-CC1-001
29 19/3/2014 B400 CC1 No need (Mr. Lee) ITP-PIL-CC1-001
End of Preliminary Pile, For Permanent Pile please see the next sheet
TOPSOIL REMOVE AND INITIAL FILLING WORK
Zone-2 AG00
1 8:00~ 5-Mar-2014 (refer to attached CC1 CC1-NSRP-FIPSRIF-001
drawing)
Zone-2 AG00
2 8:00~ 5-Mar-2014 (refer to attached CC1 TSF-Z2-CC1-0001 CC1-NSRP-FIPSRIF-001
drawing)
Inspection Mode Inspector
Activity (Inspection Item) IPMT
JGCS IPMT Sub-con JGCS
1. Pile material
Mr. Tien
Site inspection of pile quality before W S Mr. JE,OH
3.1 Field Survey 0903288616
using(D400, 600)Level Mr. Tien
(Site survey and making for coordinate and S S Mr. JE,OH
0903288616 Agreed to
existing level of piling location(TP600-5,6,7)
3.3 Pile Driving Mr. Tien
W S Mr. JE,OH proceed by Mr.
(Preliminary load test pile:TP600-5,6,7)
5.1 Pile connection(welding) 0903288616
Mr. Tien LoiAgreed to
on 27-Jan
(Preliminary load test pile : S IW Mr. JE,OH proceed by Mr.
3.5 TP600-5,6,7)
PDA Testing 0903288616
Mr. Tien LoiAgreed to
on 27-Jan
(Preliminary
6. Pile load test pile :
head treatment W IW Mr. JE,OH proceed by Mr.
0903288616
TP600-5,6,7)
Check pile head cutting and treatment prior to Mr. Tien Mr. Cho Loi on 27-Jan
W W Mr. Ooi
Load Testing. 0903288616 0916310818
3.3
PilePile
No.:Driving
TP-600-05, TP-600-06, TP-600-07 Mr. Tien
W S Mr. Lee
(Preliminary pile no.TP 400-07 / D400) 0903288616
5.1 Pile Connection (Welding) Mr. Tien
S IW Mr. Lee
(Preliminary pile: TP 400-07 / D400) 0903288616
3.5 PDA Testing Mr. Tien
W IW Mr. Lee
(Preliminary
3.4 Pile Loadpile: TP 400-07 / D400)
testing 0903288616
Mr. Tien
Static compression load testing of pile no. TP 600- W IW Mr. Lee
3.4 0903288616
05 Pile load testing Mr. Tien Mr. Cho
Static compression load test W IW Mr. Woo
3.4 0903288616 0916310818
PilePile load testing
no.TP-600-06 Mr. Tien Mr. Cho
Static lateral load test W IW
3.4 0903288616 0916310818
PilePile load testing
no.TP-600-06 Mr. Tien Mr. Cho
Static compression load test W IW
0903288616 0916310818
Pile no.TP-600-07
3.4 Pile Load testing Mr. Tien
W IW Mr. Lee
Static lateral load testing of pile no. TP 600-07 0903288616
3.3 Pile driving Mr. Tien
W S Mr. Lee
Driving preliminary pile no. TP 400-08 0903288616
5.1 Pile Connection (Welding) Mr. Tien
S IW Mr. Lee
(Preliminary pile: TP 400-08 / D400) 0903288616
3.5 PDA Testing Mr. Tien
W IW Mr. Lee
(Preliminary pile: TP 400-08 / D400) 0903288616
3.4 Pile load testing Mr. Tien
W IW Mr. Lee
Lateral
6. load testing
Pile head treatment of pile no.TP-600-05 0903288616
Mr. Tien
Pile head cutting prior to load test commencement W W Mr. Lee
3.4 Pile load testing 0903288616
for TP-400-07, TP-400-08 Mr. Tien
Static compression load testing of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-400-07 Mr. Tien
Static compression load testing of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-400-08 Mr. Tien
Lateral load testing of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-400-07 Mr. Tien
Lateral load testing of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-400-08 Mr. Tien
Tensile test of pile W IW Mr. Lee
3.4 Pile load testing 0903288616
no.TP-600-05 Mr. Tien
Tensile test of pile W IW Mr. Lee
1. Pile material 0903288616
no.TP-600-06 Mr. Tien
Site inspection of pile quality before W S Mr. Lee
0903288616
using(D600)
1. PDA Test/ second times Mr. Tien Mr. Thang
W IW
Preliminary pile no. TP-600-07 0903.288.616 0915.663.183
1. PDA Test/ second times Mr. Tien Mr. Thang
W IW
Preliminary pile no. TP-600-05; TP-600-06 0903.288.616 0915.663.183
3.5 PDA Test / Second Times Mr. Tien Mr. Thang
W IW
Preliminary piles TP-400-08 0903.288.616 0915.663.183
1.3 Field Survey level Mr. Tien
S S Mr. Lee
After top soil removal and compaction 0903288616
Issued Remark
No. Result
date