STAAD SPACE

START JOB INFORMATION

ENGINEER DATE 05-Feb-20

END JOB INFORMATION

INPUT WIDTH 79

UNIT METER KN

JOINT COORDINATES

1 0 0 0; 2 0 3.3 0; 3 3.3 3.3 0; 6 3.3 0 0; 9 0.33 0 0; 10 0.66 0 0;

11 0.99 0 0; 12 1.32 0 0; 13 1.65 0 0; 14 1.98 0 0; 15 2.31 0 0; 16 2.64 0 0;

17 2.97 0 0; 18 0 1.65 0; 19 1.65 3.3 0; 20 3.3 1.65 0; 21 0.15 3.3 0;

22 0.45 3.3 0; 23 3.15 3.3 0; 24 2.85 3.3 0; 25 0 0.15 0; 26 0 0.45 0;

27 3.3 3.15 0; 28 3.3 2.85 0; 29 0 3.15 0; 30 3.3 0.15 0; 31 0 2.85 0;

32 3.3 0.45 0; 33 0.15 0 0; 34 3.15 0 0; 35 0.365 0 0; 36 2.935 0 0;

***

***

***

***

***********************************

MEMBER INCIDENCES

1 1 25; 2 2 21; 6 3 27; 8 1 33; 9 9 35; 10 10 11; 11 11 12; 12 12 13; 13 13 14;

14 14 15; 15 15 16; 16 16 36; 17 17 34; 18 18 31; 19 19 24; 20 20 32; 21 21 22;

22 22 19; 23 23 3; 24 24 23; 25 25 26; 26 26 18; 27 27 28; 28 28 20; 29 29 2;

30 30 6; 31 31 29; 32 32 30; 33 33 9; 34 34 6; 35 35 10; 36 36 17;

***

***

**************************************

DEFINE MATERIAL START

ISOTROPIC CONCRETE1

E 3.1e+007

POISSON 0.17

DENSITY 25
ALPHA 1.2e-005

DAMP 0.05

END DEFINE MATERIAL

MEMBER PROPERTY INDIAN

2 19 21 TO 24 PRIS YD 0.3 ZD 1

1 6 18 20 25 TO 32 PRIS YD 0.3 ZD 1

8 33 PRIS YD 0.3 ZD 1

9 35 PRIS YD 0.3 ZD 1

10 PRIS YD 0.3 ZD 1

11 PRIS YD 0.3 ZD 1

12 PRIS YD 0.3 ZD 1

13 PRIS YD 0.3 ZD 1

14 PRIS YD 0.3 ZD 1

15 PRIS YD 0.3 ZD 1

16 36 PRIS YD 0.3 ZD 1

17 34 PRIS YD 0.3 ZD 1

*****************************************

CONSTANTS

MATERIAL CONCRETE1 ALL

SUPPORTS

1 FIXED BUT FZ MX MY MZ KFX 1238 KFY 1238

9 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

10 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

11 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

12 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

13 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

14 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

15 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

16 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

17 FIXED BUT FZ MX MY MZ KFX 2475 KFY 2475

6 FIXED BUT FZ MX MY MZ KFX 1238 KFY 1238


********************************************

***DL***

LOAD 1 DL

SELFWEIGHT Y -1

JOINT LOAD

1 FX 2

***

*******************Temperature Loading*********

*********Uniform increase****

LOAD 25 TEMPERATURE LOADING (RISE)

TEMPERATURE LOAD

2 TEMP 34.65

*********Uniform decrease****

LOAD 26 TEMPERATURE LOADING (FALL)

TEMPERATURE LOAD

2 TEMP 33.75

***

***

***DL HFL CASE***

***SIDLP+ Earth Fill****

LOAD 3 LOADTYPE None TITLE SIDL-P

MEMBER LOAD

2 UNI GY -15.696 0 0.15

21 UNI GY -15.696 0 0.3

22 UNI GY -15.696 0 0.05

19 UNI GY -15.696 1.15 1.2

24 UNI GY -15.696 0 0.3

23 UNI GY -15.696 0 0.15

***

**Surfacing (wearing coat)

LOAD 4 SURFACING (WEARING COAT)


MEMBER LOAD

2 19 21 TO 24 UNI GY -1.962

8 TO 17 33 TO 36 UNI GY -1.96

****ACTIVE EARTH PRESSURE ****

LOAD 7 LL SURCHARGE RIGHT SIDE

MEMBER LOAD

6 20 27 28 30 32 UNI GX -12

LOAD 8 LOADTYPE None TITLE LL SURCHARGE LEFT SIDE

MEMBER LOAD

1 18 25 26 29 31 UNI GX 0.001

****EARTH PRESSURE AT REST ****

LOAD 13 EARTH PRESSURE AT REST FROM RIGHT SIDE

MEMBER LOAD

30 TRAP GX -32.0227 -33 0 0.15

32 TRAP GX -30.0682 -32.0227 0 0.3

20 TRAP GX -22.25 -30.0682 0 1.2

28 TRAP GX -14.4318 -22.25 0 1.2

27 TRAP GX -12.4773 -14.4318 0 0.3

6 TRAP GX -11.5 -12.4773 0 0.15

LOAD 14 EARTH PRESSURE AT REST FROM LEFT SIDE

MEMBER LOAD

29 TRAP GX 12.4773 11.5 0 0.15

31 TRAP GX 14.4318 12.4773 0 0.3

18 TRAP GX 22.25 14.4318 0 1.2

26 TRAP GX 30.0682 22.25 0 1.2

25 TRAP GX 32.0227 30.0682 0 0.3

1 TRAP GX 33 32.0227 0 0.15

*****Pedestrian Load on Bottom Slab *****

LOAD 17 PEDESTRIAN LOAD

MEMBER LOAD

8 TO 17 33 TO 36 UNI GY -5
****CLASS 70R (TOP SLAB AT MID SPAN)*******

LOAD 18 CLASS 70R (TOP SLAB AT MID SPAN)

JOINT LOAD

2 FX 15.03

MEMBER LOAD

2 19 21 TO 24 UNI GY -25.7

******CLASS 40T (TOP SLAB AT MID SPAN)*********

LOAD 19 CLASS 40T (TOP SLAB AT MID SPAN)

JOINT LOAD

2 FX 15.03

MEMBER LOAD

2 19 21 TO 24 UNI GY -20.7

******CLASS 40T AT SUPPORT (TOP SLAB AT SUPP.)*********

LOAD 20 CLASS 40T AT SUPPORT (TOP SLAB AT SUPP.)

JOINT LOAD

2 FX 15.03

MEMBER LOAD

19 UNI GY -26.1 0 1.14

22 UNI GY -26.1 0 1.2

21 UNI GY -26.1 0 0.3

2 UNI GY -26.1 0 0.15

******CLASS 70R AT SUPPORT (TOP SLAB AT SUPP.)**

LOAD 21 CLASS 70R AT SUPPORT (TOP SLAB AT SUPP.)

JOINT LOAD

2 FX 15.03

MEMBER LOAD

2 19 21 TO 24 UNI GY -25.7

****CLASS 70R Wheel Case 1(TOP SLAB AT SUPPORT)*******

LOAD 22 CLASS 70R WHEEL CASE 1(TOP SLAB AT SUPPORT)

JOINT LOAD

2 FX 15.03
MEMBER LOAD

24 UNI GY -9.74 0 0.0700002

19 UNI GY -9.74 0 1.2

22 UNI GY -9.74 0 1.2

21 UNI GY -9.74 0 0.3

2 UNI GY -9.74 0 0.15

23 UNI GY -10.82 0 0.15

24 UNI GY -10.82 0 0.3

19 UNI GY -10.82 0 1.2

22 UNI GY -10.82 0.92 1.2

**

**

**

**

**

****CLASS 70R Wheel Case 2(TOP SLAB AT MID SPAN)*******

LOAD 23 CLASS 70R WHEEL CASE 2(TOP SLAB AT MID SPAN)

JOINT LOAD

2 FX 15.03

MEMBER LOAD

24 UNI GY -9.74 0 0.0700002

19 UNI GY -9.74 0 1.2

22 UNI GY -9.74 0 1.2

21 UNI GY -9.74 0 0.3

2 UNI GY -9.74 0 0.15

23 UNI GY -10.82 0 0.15

24 UNI GY -10.82 0 0.3

19 UNI GY -10.82 0 1.2

22 UNI GY -10.82 0.92 1.2

**

**
**

**

********************

LOAD 24 CLASS 70R WHEEL CASE 2(TOP SLAB AT MID SPAN)

JOINT LOAD

2 FX 15.03

MEMBER LOAD

24 UNI GY -9.74 0 0.0700002

19 UNI GY -9.74 0 1.2

22 UNI GY -9.74 0 1.2

21 UNI GY -9.74 0 0.3

2 UNI GY -9.74 0 0.15

23 UNI GY -10.82 0 0.15

24 UNI GY -10.82 0 0.3

19 UNI GY -10.82 0 1.2

22 UNI GY -10.82 0.92 1.2

**

**

**

**

********************

***

***

***

***

***

***

***

***

***

***
***********Temperature gradient

LOAD 27 TEMPERATURE GRADIENT (RISE)

JOINT LOAD

2 FX -50.35

3 FX 50.35

2 MZ 4.27

3 MZ -4.27

LOAD 28 TEMPERATURE GRADIENT (FALL)

JOINT LOAD

2 FX 23.46

3 FX -23.46

2 MZ -0.57

3 MZ 0.57

****COLLISION LOAD**********

LOAD 29 COLLISION LOAD PARALLEL TO CARRIAGEWAY AT AT TOP BOX

JOINT LOAD

2 FX -75

2 MZ 75

LOAD 30 COLLISION LOAD NORMAL TO CARRIAGEWAY AT TOP BOX

JOINT LOAD

2 FZ 150

LOAD 31 COLLISION LOAD PARALLEL TO CARRIAGEWAY AT AT TOP BOX

JOINT LOAD

3 FX 75

3 MZ -75

LOAD 32 COLLISION LOAD NORMAL TO CARRIAGEWAY AT TOP BOX

JOINT LOAD

3 FZ 150

*Partial Safety for Verification of Structural Strength (Basic Combination)

LOAD COMB 33 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 18 1.15 17 1.15


LOAD COMB 34 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 19 1.15 17 1.15

LOAD COMB 35 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 20 1.15 17 1.15

LOAD COMB 36 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 21 1.15 17 1.15

LOAD COMB 37 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 22 1.15 17 1.15

LOAD COMB 38 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 23 1.15 17 1.15

LOAD COMB 39 BASIC COMBINATION

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 24 1.15 17 1.15

LOAD COMB 40 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 18 1.5 17 1.5

LOAD COMB 41 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 19 1.5 17 1.5

LOAD COMB 42 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 20 1.5 17 1.5

LOAD COMB 43 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 21 1.5 17 1.5

LOAD COMB 44 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 22 1.5 17 1.5

LOAD COMB 45 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 23 1.5 17 1.5

LOAD COMB 46 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 24 1.5 17 1.5

LOAD COMB 47 BASIC COMBINATION STR. AT REST

1 1.35 3 1.35 4 1.75

*Partial Safety for Verification of Structural Strength (Accidental Combination)

LOAD COMB 63 STR. AT REST

1 1.0 3 1.0 4 1.0 13 1.0 14 1.0


LOAD COMB 64 STR. WITH COLISION LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 18 0.75 29 1.0 31 1.0 17 0.75

LOAD COMBINATION 65

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 19 0.75 29 1.0 31 1.0 17 0.75

LOAD COMBINATION 66

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 20 0.75 29 1.0 31 1.0 17 0.75

LOAD COMBINATION 67

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 21 0.75 29 1.0 31 1.0 17 0.75

LOAD COMBINATION 68

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 22 0.75 29 1.0 31 1.0 17 0.75

LOAD COMBINATION 69

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 23 0.75 29 1.0 31 1.0 17 0.75

LOAD COMBINATION 70

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 24 0.75 29 1.0 31 1.0 17 0.75

LOAD COMBINATION 71

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 18 0.75 30 1.0 32 1.0 17 0.75

LOAD COMBINATION 72

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 19 0.75 30 1.0 32 1.0 17 0.75

LOAD COMBINATION 73

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 20 0.75 30 1.0 32 1.0 17 0.75

LOAD COMBINATION 74

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 21 0.75 30 1.0 32 1.0 17 0.75

LOAD COMBINATION 75

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 22 0.75 30 1.0 32 1.0 17 0.75

LOAD COMBINATION 76

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 23 0.75 30 1.0 32 1.0 17 0.75

LOAD COMBINATION 77

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 24 0.75 30 1.0 32 1.0 17 0.75

*Partial Safety for Verification of Serviceability Limit State (Rare Combination)

LOAD COMB 93 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 18 1.0 25 0.6 27 0.6 17 1.0


LOAD COMB 94 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 19 1.0 25 0.6 27 0.6 17 1.0

LOAD COMB 95 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 20 1.0 25 0.6 27 0.6 17 1.0

LOAD COMB 96 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 21 1.0 25 0.6 27 0.6 17 1.0

LOAD COMB 97 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 22 1.0 25 0.6 27 0.6 17 1.0

LOAD COMB 98 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 23 1.0 25 0.6 27 0.6 17 1.0

LOAD COMB 99 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 24 1.0 25 0.6 27 0.6 17 1.0

LOAD COMB 100 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 18 1.0 26 0.6 28 0.6 17 1.0

LOAD COMB 101 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 19 1.0 26 0.6 28 0.6 17 1.0

LOAD COMB 102 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 20 1.0 26 0.6 28 0.6 17 1.0

LOAD COMB 103 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 21 1.0 26 0.6 28 0.6 17 1.0

LOAD COMB 104 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 22 1.0 26 0.6 28 0.6 17 1.0

LOAD COMB 105 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 23 1.0 26 0.6 28 0.6 17 1.0

LOAD COMB 106 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 24 1.0 26 0.6 28 0.6 17 1.0

LOAD COMB 107 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 18 0.75 25 1.0 27 1.0 17 0.75

LOAD COMB 108 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 19 0.75 25 1.0 27 1.0 17 0.75

LOAD COMB 109 THERMAL LOAD AS LEADING LOAD


1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 20 0.75 25 1.0 27 1.0 17 0.75

LOAD COMB 110 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 21 0.75 25 1.0 27 1.0 17 0.75

LOAD COMB 111 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 22 0.75 25 1.0 27 1.0 17 0.75

LOAD COMB 112 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 23 0.75 25 1.0 27 1.0 17 0.75

LOAD COMB 113 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 24 0.75 25 1.0 27 1.0 17 0.75

LOAD COMB 114 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 18 0.75 26 1.0 28 1.0 17 0.75

LOAD COMB 115 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 19 0.75 26 1.0 28 1.0 17 0.75

LOAD COMB 116 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 20 0.75 26 1.0 28 1.0 17 0.75

LOAD COMB 117 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 21 0.75 26 1.0 28 1.0 17 0.75

LOAD COMB 118 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 22 0.75 26 1.0 28 1.0 17 0.75

LOAD COMB 119 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 23 0.75 26 1.0 28 1.0 17 0.75

LOAD COMB 120 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.8 8 0.8 24 0.75 26 1.0 28 1.0 17 0.75

LOAD COMB 121 THERMAL LOAD AT REST CONDITION

1 1.0 3 1.0 4 1.0 13 1.0 14 1.0 25 1.0 27 1.0

LOAD COMB 122 THERMAL LOAD AT REST CONDITION

1 1.0 3 1.0 4 1.0 13 1.0 14 1.0 26 1.0 28 1.0

*Partial Safety for Verification of Serviceability Limit State (Frequent Combination)

LOAD COMB 153 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 18 0.75 25 0.5 27 0.5 17 0.75

LOAD COMB 154 LL AS LEADING LOAD


1 1.0 3 1.0 4 1.0 19 0.75 25 0.5 27 0.5 17 0.75

LOAD COMB 155 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 20 0.75 25 0.5 27 0.5 17 0.75

LOAD COMB 156 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 21 0.75 25 0.5 27 0.5 17 0.75

LOAD COMB 157 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 22 0.75 25 0.5 27 0.5 17 0.75

LOAD COMB 158 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 23 0.75 25 0.5 27 0.5 17 0.75

LOAD COMB 159 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 24 0.75 25 0.5 27 0.5 17 0.75

LOAD COMB 160 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 18 0.75 26 0.5 28 0.5 17 0.75

LOAD COMB 161 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 19 0.75 26 0.5 28 0.5 17 0.75

LOAD COMB 162 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 20 0.75 26 0.5 28 0.5 17 0.75

LOAD COMB 163 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 21 0.75 26 0.5 28 0.5 17 0.75

LOAD COMB 164 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 22 0.75 26 0.5 28 0.5 17 0.75

LOAD COMB 165 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 23 0.75 26 0.5 28 0.5 17 0.75

LOAD COMB 166 LL AS LEADING LOAD

1 1.0 3 1.0 4 1.0 24 0.75 26 0.5 28 0.5 17 0.75

LOAD COMB 167 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 18 0.2 25 0.6 27 0.6 17 0.2

LOAD COMB 168 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 19 0.2 25 0.6 27 0.6 17 0.2

LOAD COMB 169 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 20 0.2 25 0.6 27 0.6 17 0.2


LOAD COMB 170 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 21 0.2 25 0.6 27 0.6 17 0.2

LOAD COMB 171 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 22 0.2 25 0.6 27 0.6 17 0.2

LOAD COMB 172 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 23 0.2 25 0.6 27 0.6 17 0.2

LOAD COMB 173 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 24 0.2 25 0.6 27 0.6 17 0.2

LOAD COMB 174 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 18 0.2 26 0.6 28 0.6 17 0.2

LOAD COMB 175 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 19 0.2 26 0.6 28 0.6 17 0.2

LOAD COMB 176 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 20 0.2 26 0.6 28 0.6 17 0.2

LOAD COMB 177 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 21 0.2 26 0.6 28 0.6 17 0.2

LOAD COMB 178 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 22 0.2 26 0.6 28 0.6 17 0.2

LOAD COMB 179 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 23 0.2 26 0.6 28 0.6 17 0.2

LOAD COMB 180 THERMAL LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 24 0.2 26 0.6 28 0.6 17 0.2

LOAD COMB 181 THERMAL LOAD AT REST CONDITION

1 1.0 3 1.0 4 1.0 13 1.0 14 1.0 25 0.6 27 0.6

LOAD COMB 182 THERMAL LOAD AT REST CONDITION

1 1.0 3 1.0 4 1.0 13 1.0 14 1.0 26 0.6 28 0.6

*Partial Safety for Verification of Serviceability Limit State (Quasi-permanent Combination)

LOAD COMBINATION 213

1 1.0 3 1.0 4 1.0 13 1.0 14 1.0 25 0.5 27 0.5

LOAD COMBINATION 214

1 1.0 3 1.0 4 1.0 13 1.0 14 1.0 26 0.5 28 0.5


*Combination for Base Pressure and Design of Foundation (Combination 1 )

LOAD COMB 217 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 18 1.15 25 0.9 27 0.9 17 1.15

LOAD COMB 218 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 19 1.15 25 0.9 27 0.9 17 1.15

LOAD COMB 219 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 20 1.15 25 0.9 27 0.9 17 1.15

LOAD COMB 220 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 21 1.15 25 0.9 27 0.9 17 1.15

LOAD COMB 221 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 22 1.15 25 0.9 27 0.9 17 1.15

LOAD COMB 222 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 23 1.15 25 0.9 27 0.9 17 1.15

LOAD COMB 223 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 24 1.15 25 0.9 27 0.9 17 1.15

LOAD COMB 224 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 18 1.15 26 0.9 28 0.9 17 1.15

LOAD COMB 225 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 19 1.15 26 0.9 28 0.9 17 1.15

LOAD COMB 226 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 20 1.15 26 0.9 28 0.9 17 1.15

LOAD COMB 227 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 21 1.15 26 0.9 28 0.9 17 1.15

LOAD COMB 228 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 22 1.15 26 0.9 28 0.9 17 1.15

LOAD COMB 229 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 23 1.15 26 0.9 28 0.9 17 1.15

LOAD COMB 230 EARTH PRESSURE AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 24 1.5 26 0.9 28 0.9 17 1.15

LOAD COMB 231 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 18 1.5 25 0.9 27 0.9 17 1.5


LOAD COMB 232 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 19 1.5 25 0.9 27 0.9 17 1.5

LOAD COMB 233 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 20 1.5 25 0.9 27 0.9 17 1.5

LOAD COMB 234 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 21 1.5 25 0.9 27 0.9 17 1.5

LOAD COMB 235 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 22 1.5 25 0.9 27 0.9 17 1.5

LOAD COMB 236 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 23 1.5 25 0.9 27 0.9 17 1.5

LOAD COMB 237 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 24 1.0 25 0.9 27 0.9 17 1.5

LOAD COMB 238 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 18 1.5 26 0.9 28 0.9 17 1.5

LOAD COMB 239 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 19 1.5 26 0.9 28 0.9 17 1.5

LOAD COMB 240 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 20 1.5 26 0.9 28 0.9 17 1.5

LOAD COMB 241 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 21 1.5 26 0.9 28 0.9 17 1.5

LOAD COMB 242 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 22 1.5 26 0.9 28 0.9 17 1.5

LOAD COMB 243 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 23 1.5 26 0.9 28 0.9 17 1.5

LOAD COMB 244 LIVE LOAD AS LEADING LOAD

1 1.35 3 1.35 4 1.75 7 1.2 8 1.2 24 1.0 26 0.9 28 0.9 17 1.5

*Combination for Base Pressure and Design of Foundation (Combination 2 )

LOAD COMB 273 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 18 1.0 25 0.8 27 0.8 17 1.0

LOAD COMB 274 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 19 1.0 25 0.8 27 0.8 17 1.0


LOAD COMB 275 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 20 1.0 25 0.8 27 0.8 17 1.0

LOAD COMB 276 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 21 1.0 25 0.8 27 0.8 17 1.0

LOAD COMB 277 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 22 1.0 25 0.8 27 0.8 17 1.0

LOAD COMB 278 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 23 1.0 25 0.8 27 0.8 17 1.0

LOAD COMB 279 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 24 1.0 25 0.8 27 0.8 17 1.0

LOAD COMB 280 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 18 1.0 26 0.8 28 0.8 17 1.0

LOAD COMB 281 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 19 1.0 26 0.8 28 0.8 17 1.0

LOAD COMB 282 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 20 1.0 26 0.8 28 0.8 17 1.0

LOAD COMB 283 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 21 1.0 26 0.8 28 0.8 17 1.0

LOAD COMB 284 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 22 1.0 26 0.8 28 0.8 17 1.0

LOAD COMB 285 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 23 1.0 26 0.8 28 0.8 17 1.0

LOAD COMB 286 EARTH PRESSURE AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 24 1.0 26 0.8 28 0.8 17 1.0

LOAD COMB 287 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 18 1.3 25 0.8 27 0.8 17 1.3

LOAD COMB 288 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 19 1.3 25 0.8 27 0.8 17 1.3

LOAD COMB 289 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 20 1.3 25 0.8 27 0.8 17 1.3

LOAD COMB 290 LIVE LOAD AS LEADING LOAD


1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 21 1.3 25 0.8 27 0.8 17 1.3

LOAD COMB 291 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 22 1.3 25 0.8 27 0.8 17 1.3

LOAD COMB 292 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 23 1.3 25 0.8 27 0.8 17 1.3

LOAD COMB 293 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 24 1.3 25 0.8 27 0.8 17 1.3

LOAD COMB 294 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 18 1.3 26 0.8 28 0.8 17 1.3

LOAD COMB 295 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 19 1.3 26 0.8 28 0.8 17 1.3

LOAD COMB 296 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 20 1.3 26 0.8 28 0.8 17 1.3

LOAD COMB 297 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 21 1.3 26 0.8 28 0.8 17 1.3

LOAD COMB 298 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 22 1.3 26 0.8 28 0.8 17 1.3

LOAD COMB 299 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 23 1.3 26 0.8 28 0.8 17 1.3

LOAD COMB 300 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 24 1.3 26 0.8 28 0.8 17 1.3

*Combination for Base Pressure and Design of Foundation (Accidental Combination 1 )

LOAD COMB 329 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 18 0.75 25 0.5 27 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 330 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 19 0.75 25 0.5 27 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 331 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 20 0.75 25 0.5 27 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 332 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 21 0.75 25 0.5 27 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 333 LIVE LOAD AS LEADING LOAD


1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 22 0.75 25 0.5 27 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 334 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 23 0.75 25 0.5 27 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 335 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 24 1.0 25 0.5 27 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 336 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 18 0.75 26 0.5 28 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 337 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 19 0.75 26 0.5 28 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 338 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 20 0.75 26 0.5 28 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 339 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 21 0.75 26 0.5 28 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 340 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 22 0.75 26 0.5 28 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 341 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 23 0.75 26 0.5 28 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 342 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 24 1.0 26 0.5 28 0.5 29 1.0 31 1.0 17 0.75

LOAD COMB 343 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 18 0.75 25 0.5 27 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 344 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 19 0.75 25 0.5 27 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 345 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 20 0.75 25 0.5 27 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 346 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 21 0.75 25 0.5 27 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 347 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 22 0.75 25 0.5 27 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 348 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 23 0.75 25 0.5 27 0.5 30 1.0 32 1.0 17 0.75
LOAD COMB 349 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 24 0.75 25 0.5 27 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 350 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 18 0.75 26 0.5 28 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 351 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 19 0.75 26 0.5 28 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 352 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 20 0.75 26 0.5 28 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 353 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 21 0.75 26 0.5 28 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 354 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 22 0.75 26 0.5 28 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 355 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 23 0.75 26 0.5 28 0.5 30 1.0 32 1.0 17 0.75

LOAD COMB 356 LIVE LOAD AS LEADING LOAD

1 1.0 3 1.0 4 1.0 7 0.2 8 0.2 24 0.75 26 0.5 28 0.5 30 1.0 32 1.0 17 0.75

** For base pressure check only

LOAD COMB 385 BASE PRESSURE CHECK

1 1.0 3 1.0 4 1.0 7 1.0 8 1.0 22 1.0 17 1.0

LOAD COMB 387 SHEAR CHECK

1 1.0 3 1.0 4 1.0 13 1.0

LOAD COMB 389 SHEAR FOR CHECK

1 1.0 3 1.0 4 1.0 14 1.0

PERFORM ANALYSIS PRINT STATICS CHECK

DEFINE ENVELOPE

33 TO 47 ENVELOPE 1

63 TO 77 ENVELOPE 2

93 TO 122 ENVELOPE 3

213 214 ENVELOPE 4

217 TO 244 ENVELOPE 5

273 TO 300 ENVELOPE 6


329 TO 356 ENVELOPE 7

END DEFINE ENVELOPE

FINISH