Sonic Pipe Grouting with Cement - By Sub Contractor
Item Description Unit Qty Rate Days Amount
Output = 15 Pile Caps *10*4*4 = 2400Rmt Manpower Mason Nos 1 594 26 15444 Helper Nos 3 544 26 42432 PF @ 13.61% 7877 Total Man Power 65753 Machinery Mobilisation & demobilisation LS 10000 250 600 Grout pump with agitator Month 1 21000 21000 Accessories like storage, drum,wire mesh, mucks 1000 Total Machinery 22600 Material Cement Bags 165 383.5 63278 Cebex 200 Packet 165 86 14190 Transportation LS 7500 Ice Kgs 6000 3.5 21000 Total Material 105968 Total Cost 194320 CP @ 20% 38864 Total Cost for 2400Rmt 233185 Total Cost/Pile cap 15546 Total Cost/Rm 97
Sonic Pipe Grouting with GP2 - By Sub Contractor
Item Description Unit Qty Rate Days Amount Output = 15 Pile Caps *10*4*4 = 2400Rmt Manpower Operator Nos 1 594 26 15444 Helper Nos 3 544 26 42432 PF @ 13.61% 7877 Total Man Power 65753 Machinery Mobilisation & demobilisation LS 10000 250 600 Grout pump with agitator Month 1 21000 21000 Accessories like storage, drum,wire mesh, mucks 1000 Total Machinery 22600 Material GP2 Bags 465 445 206925 Transportation LS 7500 Ice Kgs 6000 3.5 21000 Total Material 235425 Total Cost 323778 CP @ 20% 64756 Total Cost for 2400Rmt 388534 Total Cost/Pile cap 25902 Total Cost/Rm 162 Sonic Pipe Grouting with Cement - By Company Item Description Unit Qty Rate Days Amount Output = 15 Pile Caps *10*4*4 = 2400Rmt Manpower Mason Nos 1 594 26 15444 Helper Nos 3 544 26 42432 PF @ 13.61% 7877 Total Man Power 65753 Material Cement Bags 165 250 41250 Cebex 200 Packet 165 86 14190 Transportation LS 7500 Ice Kgs 6000 3.5 21000 Total Material 83940 Total Cost for 2400Rmt 149693 Total Cost/Pile cap 9980 Total Cost/Rm 62
Sonic Pipe Grouting with GP2 - By Company
Item Description Unit Qty Rate Days Amount Output = 15 Pile Caps *10*4*4 = 2400Rmt Manpower Mason Nos 1 594 26 15444 Helper Nos 3 544 26 42432 PF @ 13.61% 7877 Total Man Power 65753 Material GP2 Bags 465 387.5 180188 Transportation LS 7500 Ice Kgs 6000 3.5 21000 Total Material 208688 Total Cost for 2400Rmt 274440 Total Cost/Pile cap 18296 Total Cost/Rm 114