Job summary
Transformer Evacuation
4 26.3.2020 27.3.2020 completed
Oil filling and oil filtration
5 27.3.2020 27.3.2020 completed
Handover
7 29.3.2020 29.3.2020 completed
Introduction
In Riffa power station, GT 11 Transformer observed minor leak in the bottom header
valve. This report describes the activity of arresting the leak with recommended action .
Scope of work:
Description
1. Physical Inspection:
Before attending the leak , Transformer and leakage valve was completed inspected for
any other damages or abnormality .
Physical Inspection
Leakage Valve
Job completion Report
Project : Gt 11 oil leak Repair work
2. Material shifting:
After confirming the valves leak , oil storage tank , filter machine and Vacuum machine
are mobilized to site .
Shifting machines
Job completion Report
Project : Gt 11 oil leak Repair work
3.Oil Draining:
Before attending the valve leak, header valves are closed from both main body and
radiator ends. To ensure the leak from the valve , initially small amount of oil drained
from the bottom radiator tank .
6. Transformer Evacuation:
After valve replacement, vacuum was applied to the transformer.
Transformer Evacuation
7. Oil filling and Oil filtration:
After desired vacuum level reached , oil was filled back to the transformer and
circulated.
Oil filtration
Job completion Report
Project : Gt 11 oil leak Repair work
8.Oil Result:
Oil sampled was taken and breakdown voltage test performed.
9.Pressure Test:
Pressure Test was performed in GT11 to ensure no leakage from the transformer.
Pressure Test
10. Handover:
After final Inspection ensuring no leaks, recommended oil level in the conservator , and
proper housekeeping Gt11 transformer handover to customer.