Request for Inspection (RFI) No.: RAB03-RFI-EPCC-JSZ-300- CIVIL Discipline From: TIEJUN To: Owner 17/06/2020 Date of Inspection: 18/06/2020 Date of Request: 11:00 Am Time of Inspection: 09:00 Am Time of Request: Inspection Request For: Formwork, location, level and polyethylene sheet to release of Lean Concrete Pouring for Lighting pole foundation LC24-3 to LC26-4. Inspection Location: Lighting pole foundation LC24-3 to LC26-4. Description of Inspection Item: Check formwork, location, level and polyethylene sheet to release of Lean Concrete Pouring for Lighting pole foundation LC24-3 to LC26-4.
REF. DWG. Title /NO.: RAB03-DRA-IDOM-ZZZ-400-0585 REV.: 02V
ITP NO. and section: RAB03-ITP-EPCC-ZZZ-370-0001/2.2.1, 3.6 ATTACHMENTS YES SUBCONTRACTOR EPCC SIDM ABNG TIEJUN Owner CONST Action code from the ITP H W W W ISSUED BY SUB TIEJUN Construction SIDM ABNG QC TIEJUN QC CONTRACTOR QC QC Signature: Name: Date: Result of Inspection and Testing Other Remark If Any: