Prepared & Issued by: Marine Personnel Issue Date: 03-Jan’-2020
Approved by: DPA Last Issue Date: -
Revision no.: -
LUBE OIL
L.O storage tank : to store M/E and D/G L.O from
bunkering.
SW cooling system:
SW from overboard throught lower or upper seachest and filter
pumped by SW cooling pump and transferred to F.W central
cooler, air accomodation SW pump, refrigerant SW pump and
back to over board.
C Main Engine:
1 Main engine Main engine preparation :
preparation/ one
hour notice Check level of DO service tank, LO SYS tank, Cylinder
OIL tank, expantion tank.
Check the pressure of air recervoir tank and drain air
recevoir of water.
Start stanby diesel generator no.1 then synchronize to
service generator for paralel generator to support electrical
Pressure gauge
The function of pressure gauge is instrument for measure of
pressure such as pressure of DO pump, LO pump, control air,
turbocharger, scavenge air and etc in good condition.
Temperature Control
Temperature control main engine function for measure
temperature in main engine, such as temperature of lube oil,
fuel oil, turbocharge, fw cooling, sw cooling, intercooler,
scavenge air, exhaust gas and etc in good condition.
4 Safety device test Some of the main engine safety devices fitted in the main
engine:
Crank case relief door
Scavenge space relief door
Cylinder head relief door
Starting air relief valve
Starting airline flame trap
Oil mist detector
Rotation direction interlock
Flame trap
Turning gear interlock
5 Valve clearance Valve clearance is the distance or gap between the cam and the
top of the valve, the procedure of the maintenance:
Maintenance procedure:
Fill up permit to work and risk of assessment
Prepare tools
Wear PPE
Make sure engine in cold state
Set turning gear in manual mode till cylinder wich
want to clearance in TDC position
Loosening lock nut and adjustment screw
Entering feeler gauge based specification from manual
book
Adjust gap by rotated adjustment screw till found the
good clearance,after finish adjustment retightenend
lock nut
Do the above steps to others cylinder
Running tested
Clean up all of tool and working area
make report for the maintenance
After maintenance :
Clean up all of tools and return to the space
Clean up working space
Make the maintenance report of overhaul
D Auxiliary Engine:
1 Starting Starting procedure of the diesel generator:
monitoring:
check all of temperature of each items
check all off pressure gauge of each items
check volume of lo sump tank
check voltage, amp, and kw
check any alarms sound
2 Parallel Diesel generator paraller procedure:
start the stanby generator no.1
rise the RPM
check all of items and make sure there is no leakage and
ubnormal condition
go to the main switch board in engine control room for
synchronize
equalize of both frequency
changed the selector on right position
look at the synchroscope make sure in clockwise direction
wait till synchro lamp in clockwise direction,slow moving
if it have reaches 12 o’clock position closed the breaker
just the bus bar handle is necessary
3 Valve clearance Valve clearance is the distance or gap between the cam and the
top of the valve, the procedure of the maintenance:
Maintenance procedure:
Fill up permit to work and risk of assessment
Prepare tools
Wear PPE
Make sure engine in cold state
Set turning gear in manual mode till cylinder wich
want to clearance in TDC position
Loosening lock nut and adjustment screw
Entering feeler gauge based specification from manual
book
Adjust gap by rotated adjustment screw till found the
good clearance,after finish adjustment retightenend
lock nut
Do the above steps to others cylinder
Running tested
Clean up all of tool and working area
make report for the maintenance
after maintenance
clean up all of tools
clean up working spaces
make report maintenance (paper work)
E Boiler:
1 Starting Boiler starting procedure
Preparation operating:
Ensure the vent valve on the boiler is open and check there
is no pressure in the boiler
Check the steam stop valve is closed
Check all of valves for fuel are open,and let it circulate till
the temperature required
Check all of condenser valves
Check water level in cascade tank and fill it if the level is
low
Starting procedure:
Start the boiler in auto mode by press button
The fan burner will start and purging any gases in the
boiler go out to atmosphere throught the funnel,after pre
set purge time the pilot burner will ignite,the pilot burner
consist with two electrodes and when the pilot burner
suplayed with fuel oil and trought the eletrodes the pilot
burner will ignite,the flame will catch light from the pilot
burner and give order to solenoid vlave to opened,it make
main burner ignited
Check the combustion chamber by sight glass and make
sure the burner has lit and flame is good
Make sure the water level in water drum always in good
level
Close the vent valve after the steam starts coming outside
Open the steam stop valve
Monitoring :
During operation check all the alarms and do routine check
in local side
2 Water maintenance The Function of the boiler water maintenance are:
To monitoring the condition of boiler water
To control the chemical dosing of the boiler
To maintain the boiler in healthy state,and make boiler
long life
3 Blow down The blowdown is the final action if the condition of the boiler
water is in worst condition
Preparation maintenance:
make permit to work and risk assistment
prepare the tools
during maintenance:
Turn off the refrigeration machine
Hook up the refrigerant gauge manifold
Hook up the AC vacuum in the center manifold
Start the vacuum machine
Check to see if the vacuum level must be less than 27hg
After maintenance:
Clean up all of tools and back to their place
Clean up working area
make report maintenance (paper work)
Step of maintenance
Connected the low side hose (blue pipe) to the low side
port on the A/C unit
Connect the high side hose (red) to the high side port on
the A/C unit
Open both valves so that the gauges register the A/C
system pressure
Compare the actual PSI reading (the normal reading high
side and low side should be 80 t0 105 psi )
Finished maintenance:
Clean up the tools and return to the before position
Cleanup working area
make report maintenance (paper work)
Work procedure:
Switch off of the refrigerator machine
Open the cover of lube oil make up
Added oil gradually till volume lub oil in good level
Check from the level from the sight glass
Close the cover
Running tested
Finished maintenance:
Clean up the tools and return to the before position
Cleanup working area
Operating procedure:
Start the OWS supply pump which is a laminar flow pump
and one that will supply the oily water mixture to OWS
Observe the OCM for ppm value and keep checking
sounding of bilge thank from where OWS taking suction
and of the OWS sludge tank
A sample valve is provide just before overboard valve and
after the 3-way valve,keep and check on the sample for
any effluent and clarity
Overhaul procedure:
Turn of the influent water to the unit
Open the unit cover
Remove any oil and dispose of it in away that complies
with company and legal procedures
Drain the water from the separator
Measure the depth of the leftlover solids and write it
down,this will serve as a framework for scheduling future
Finished maintenance:
Clean up the tools and return to the before position
Cleanup working area
make report maintenance (paper work)
3 Oil record book When operating oily water separator,15 ppm equipment for
discharging treated bilge water overboard,the operation is
recorded with time position of ship quantity discharged
and retention
Maintenance of OWS must be recorded with the type of
maintenance date ,location and time
H Purifier:
1 Operation Operating procedure of purifier:
Preparation starting:
Check level of settlink and service tank is in good level
Check level of operating water tank is good
Check all of valves on system and make sure are open
Operating procedure
Start the blower
Set on the power in panel
Start the purifier by push the botton
Set in mode auto
Monitoring:
Check all of alarm sound
Visual check: temperature, pressure, leakage
Check level of purifier sludge tank
2 Overhaul Procedure to overhaul bowl of purifier
Overhaul procedure:
Ensure the power is off
Ensure the purifier is completely stopped
Ensure the purifier in cold state
after overhaul:
clean up all of tools and return back to the place
clean up the working space
make report maintenance (paper work)
I Cargo pumps:
1 Operation Cargo pump operating procedure:
Operating Procedure:
start standby diesel generator and synchronize to diesel
generator service (parallel)
Switch on cargo pump on control panel in engine room
Call to CCR for cargo pump is ready for operate
monitoring:
Restore:
operate the rudder angel to “0” position
turn the “auto pilot” switch to “ON “ posisition inform the
bridge
K Others:
1 Welding Safety procedure before welding:
make risk assessment
make hot permite to work
standby fire exthinguser
prepared welding tools
wearing PPE
During welding:
during welding the welder must be support by other crew,and
don’t late the welder working alone,stop working as soon as
possible if any ubnormal condition and report to the captain
After welding:
ensure the working area there is no light spot by sparkling
welding process
clean up working area and tools
make paper work
2 Reporting / Reporting:
paperwork / Assist third engineer make report L.O and F.O
Be familiar with consumption to the bridge every noon
Vetting Inspection Assist second engineer report to bridge about RPM every
end of duty
Assist second engineer prepare monthly report to company
Paper work:
Assist second engineer to make paper work after
maintenance
Assist second engineer make risk assessment before to
work