Corrective and
Preventive action
Types of Maintenance
Shutdown
Shutdown Shutdown
Opportunity Condition corrective
corrective improvement
based
Shutdown
10-04-2019 Binay Kumar, Deptt. of Production Engg., BIT Mesra, Ranchi
Preventive
Binay Kumar, Deptt. of Production Engg., BIT
Mesra, Ranchi 1
10‐04‐2019
Alignment
Servicing Testing
Elements of
Adjustment preventive Inspection
Maintenance
Calibration
Installation
10‐04‐2019 Binay Kumar, Deptt. of Production Engg., BIT Mesra, Ranchi
CAPA
Important to
remember
Voujm!zpv!jefoujgjfe!uif!
root cause (S)
and take action on it, it will not be a
“Corrective action”
10‐04‐2019 Binay Kumar, Deptt. of Production Engg., BIT Mesra, Ranchi
Binay Kumar, Deptt. of Production Engg., BIT
Mesra, Ranchi 2
10‐04‐2019
CAPA
Risk
Management Audits
Preventive
Action
Management
FMEA
Review
10‐04‐2019 Binay Kumar, Deptt. of Production Engg., BIT Mesra, Ranchi
CAPA
• If the focused on the systematic investigation of the root cause of
identification problem or identified risk in attempt to prevent their.
10‐04‐2019 Binay Kumar, Deptt. of Production Engg., BIT Mesra, Ranchi
Binay Kumar, Deptt. of Production Engg., BIT
Mesra, Ranchi 3
10‐04‐2019
Implemented CAPA
Corrective actions are implemented
• In response to customer complaints
• Unacceptable levels of product non-conformance
• Issues identified during an internal audit,
• Adverse or unstable trends in product and process monitoring such as
would be identified by statistical process control (SPC).
FMECA
10‐04‐2019 Binay Kumar, Deptt. of Production Engg., BIT Mesra, Ranchi
10‐04‐2019 Binay Kumar, Deptt. of Production Engg., BIT Mesra, Ranchi
Binay Kumar, Deptt. of Production Engg., BIT
Mesra, Ranchi 4
10‐04‐2019
• Reactive • Proactive
• Triggered by • Triggered by
problem potential problem
10‐04‐2019 Binay Kumar, Deptt. of Production Engg., BIT Mesra, Ranchi
Binay Kumar, Deptt. of Production Engg., BIT
Mesra, Ranchi 5