COMPARE METHODE OF INSTALLATION NEW POLE & LAMP LED AT NEW ROAD

PT ASTRA DAIHATSU MOTOR PE BUILDING

PRODUCTION ENGINEERING - BUILDING AND FACILITY SECTION 21-Nov-19

NO ITEM CURRENT DESIGN NEW DESIGN 1 NEW DESIGN 2 NEW DESIGN 3

C B A
C B C
A C B B A
A
1 DESIGN

POLE LAMP BEFORE DRAINAGE POLE LAMP AFTER DRAINAGE POLE LAMP AFTER DRAINAGE POLE
POLELAMP
LAMPAAFTER
CROSSDRAINAGE
THE ROAD

'* Total Pole Lamp = 40 pcs '* Total Pole Lamp = 40 pcs '* Total Pole Lamp = 40 pcs '* Total Pole Lamp = 40 pcs
* Foundation lamp : 600x600x1000 * Foundation lamp : 600x600x500 * Foundation lamp : 600x600x500 * Foundation lamp : 600x600x500
* Concrete foundation K250 * Concrete foundation K250 * Concrete foundation K250 * Concrete foundation K250
* Excavation soil for foundation * Demolish concrete for rebar foundation * Demolish concrete for rebar foundation * Demolish concrete for rebar foundation
* Formwork bataco (no need demolish) * Formwork wooden (need demolsih after curring) * Formwork wooden (need demolsih after curring) * Formwork wooden (need demolsih after curring)
* Additional stek to current structure * Additional stek to current structure

2 SAFETY
* Position of pole lamp is secure from potential hit by truck or dolly /
O * Position of pole lamp potential hit by truck or dolly / towing X * Position of pole lamp potential hit by truck or dolly / towing X * Position of pole lamp potential hit by truck or dolly / towing X
towing (Need protection pipe for cover pole of lamp LED) (Need protection pipe for cover pole of lamp LED) (Need protection pipe for cover pole of lamp LED)
3 0 0 0
* Lux pole lamp fullfill standard government * Lux pole lamp fullfill standard government
* Lux pole lamp fullfill standard government * Lux pole lamp fullfill standard government
(Standard Government 5 - 20 Lux) (Standard Government 5 - 20 Lux)

3 QUALITY
(Standard Government 5 - 20 Lux)
Lux test :
O (Standard Government 5 - 20 Lux)
Lux test :
O Lux test :
A : 23 Lux -> OK
Δ Lux test :
A : 23 Lux -> OK
O
A : 11 Lux -> OK A : 23 Lux -> OK
B : 61 Lux ->OK B : 61 Lux ->OK
B : 23 Lux -> OK B : 61 Lux ->OK
C : 91 Lux -> OK C : 91 Lux -> OK
C : 57 Lux -> OK C : 91 Lux -> OK
3 3 * Reduce width of Road so potential distrub trafic of truck 1 3
Potential Additional cost : Potential Additional cost :
'- Additional reinforcement foundation : 8,7 miill
Δ - Additional formwork : 10 mill X '- Additional formwork : 10 mill X O
- Additional protecton pole :80 mill - Additional protecton pole :80 mill
- Need Rent Boom Lift 1 year/1x : Rp 18,9 Jt (rent 1 week)
4 COST - Additional for modification cansteen : 15 mill - Additional for modification cansteen : 15 mill - NO additonal cost
for total lamp (40 pcs) if any problem Lamp
- Additional demolish floor for steking : 10 mill - Additional demolish floor for steking : 10 mill
- Need Additional steel conduit : 25 mill - Need Additional steel conduit : 25 mill
1 0 0 3
TOTAL : ± Rp 148,7 Mill / 5 year = 29,74 Mill/year TOTAL : ± Rp 140 Mill / 5 year = 28 Mill/year

- Excavation Soil ±5 day / 40 point -Demolish floor existing ±5 day / 40 point -Demolish floor existing ±5 day / 40 point -Demolish floor existing ±5 day / 40 point
- Install formwork bataco 2 point/day/MP
(total 5 day/40 point with 4 MP)
O - Install formwork wooden 2point/day/MP
(total 5 day/40 point with 4 MP)
O - Install formwork wooden 2point/day/MP
(total 5 day/40 point with 4 MP)
O - Install formwork wooden 2point/day/MP
(total 5 day/40 point with 4 MP)
O
5 DELIVERY

TOTAL SCHEDULE : 3 month TOTAL SCHEDULE : 3 month TOTAL SCHEDULE : 3 month TOTAL SCHEDULE : 3 month
3 3 3 3
- Easy to maintenance because position lamp upper concrete
- Dificult to maintenance because position lamp upper drainage Δ - Easy to maintenance because position lamp upper concrete
road
O - Easy to maintenance because position lamp upper concrete
road
O road
- Maintenance activity every 1 year/1x or every any problem
X
- Maintenance activity every 1 year/1x or every any problem lamp
6 MAINTENANCE - Maintenance activity every 1 year/1x or every any problem - Maintenance activity every 1 year/1x or every any problem lamp LED so need mobile lifter to support maintenance
LED so need boom lift to support maintenance process (Need Rent
lamp LED so need mobile lifter to support maintenance process lamp LED so need mobile lifter to support maintenance process (Using mobile lifter ADM)
Boom lift) 1 (Using mobile lifter ADM) 3 process (Using mobile lifter ADM) 3 *Cable of lamp potential interference with access new 0
factory (in future)

TOTAL 11 9 7 9
CONCLUSION :
Based on SQCDM result, we propose to choose current design for method of installation foundation pole Lamp
LED at New Road